Planning Drawings · Mortlake · Richmond upon Thames

Planning Drawings in Mortlake

Fixed fee from £840. MCIAT chartered. Richmond upon Thames planning experienced. 1 postcode covered: SW14.

Planning Drawings in Mortlake — quick facts

Fixed fee from
£840
Planning authority
Richmond Council
Article 4 in force
No
Typical stock
Victorian and Edwardian terraces
Process duration
12–14 weeks
First-time approval
98%
Why Mortlake

Mortlake's housing pattern shapes the design

Mortlake is Victorian and Edwardian terraces. The dominant stock — victorian and edwardian terraces — has specific constraints and opportunities for planning permission drawings. Side returns sit better on bay-fronted Victorian terraces than on detached 1930s semis. Mansards work where the existing roofscape supports them. We design to the block, not the brochure.

Local context summary — Architectural Drawings London, MCIAT chartered

Process timeline for Mortlake

  1. Week 1. Free site survey at your Mortlake property. Measured drawings produced.
  2. Weeks 2–3. Design iterations with you. Fixed quote confirmed.
  3. Weeks 4–5. Application drawings + Design & Access Statement + Heritage Statement (if needed).
  4. Weeks 5–6. Richmond Council validation.
  5. Weeks 6–14. Statutory 8-week determination. We respond to officer comments.
Mortlake FAQ for planning permission drawings
Do I need planning permission for planning permission drawings in Mortlake?

Most planning permission drawings projects in Mortlake fall under Permitted Development if the property is a house (not a flat), not listed, and not in a conservation area. Richmond upon Thames has no borough-wide Article 4 Direction. We confirm eligibility free at the site survey.

How much does planning permission drawings cost in Mortlake?

Drawings: fixed fee from £840 (Planning Drawings). Construction cost is separate and depends on size, finish and structural complexity. For victorian and edwardian terraces (typical of Mortlake), expect £45,000–£85,000 build cost for a standard rear extension or loft, more for mansards or basements.

How long does the planning permission drawings process take in Mortlake?

12–14 weeks from first call to Richmond Council planning decision. Site survey week 1, design weeks 2–3, validation 1–2 weeks, statutory 8-week determination.

What property types are common in Mortlake?

Mortlake is characterised by victorian and edwardian terraces. We've delivered planning permission drawings for every period represented here — the design choices vary significantly by stock.

Will my application succeed in Mortlake?

Our first-time approval rate in Richmond upon Thames is 98%. Pre-application advice from Richmond Council is built into our process when the case is borderline (conservation area, Article 4, listed).

Other services in Mortlake

All services in Mortlake →

Planning permission drawings in Mortlake — start free

Same-day fixed quote. MCIAT chartered.

Get quote