Validation: what a London council needs before assessing

Initial council check that an application contains all required documents and fees. Until validated, the 8-week determination clock does not start.

Technical drawings reviewed on tablet — architectural drawings in London
In short

Validation is the council's check that a planning application is complete before it is registered. The eight-week determination period starts at validation, not at submission, so an application missing a required document simply sits — often for weeks — before anyone assesses it.

What is checked?

The national requirements — a completed form, the correct fee, the ownership certificate, a location plan at 1:1250 with the site edged red, and plans identifying the land — plus the borough's own local validation list, which commonly adds a design and access statement, a heritage statement in a conservation area, a daylight assessment, an arboricultural report where trees are affected, and drainage details.

What causes rejection?

Unscaled or unnumbered drawings, a location plan at the wrong scale, elevations that do not match the plans, a missing north point, no existing drawings to compare against, an ownership certificate signed for the wrong certificate type, and the wrong fee. Each is trivial and each costs a week or more.

Every drawing should carry a unique number, a title, a scale, the paper size and a north point on plans. Officers print at reduced size, so a scale bar as well as a written scale is good practice.

Can you challenge an invalidity decision?

There is no formal appeal, but a local validation list requirement can be challenged if it is not on the published list or is disproportionate to the application. Local lists must be published and reviewed, and items not on them cannot be demanded.

What does validation mean for a London project?

Validation in a Hounslow context: London Borough of Hounslow (Hounslow Council) runs 30 conservation areas including the Chiswick Conservation Area and the Bedford Park Conservation Area, and there is no borough-wide Article 4 direction, so permitted development generally survives outside conservation areas. That decides how validation is handled: £548 and 8 weeks for a Hounslow householder application, or £274 for the Lawful Development Certificate that records validation as lawful. The law behind validation sits in the Town and Country Planning Act 1990, the GPDO 2015 and the Building Regulations 2010.

Validation at a glance

Key figures for Validation
Clock starts atValidation, not submission
Location plan1:1250, site edged red
Site plan1:500 or 1:200
DrawingsNumbered, titled, scaled, with north point
Local listMust be published and reviewed
Householder period8 weeks from validation

Common questions about validation

Why has my application not been registered?

Almost always a validation item — a missing statement, an unscaled drawing or the wrong fee.

Does the eight weeks start when I submit?

No. It starts at validation.

Can the council demand anything they like?

No. Requirements must appear on the published local validation list.

Validation in London — the exterior of London house before works
The exterior of a london house before works — validation in London.
Book a call

Speak to a chartered technologist — free 15 minutes

Pick a slot that suits you. No obligation and no sales pressure, just straight answers on your planning route.

Need help with Validation?

Talk to our MCIAT teamOr contact us about your project first
An architectural technologist checking a printed set of house drawings, marking a proposed elevation in red — validation in London
Every set is checked line by line against the validation checklist before it leaves the office.

Found this useful? Share it

Copies the headline and the link, ready to paste anywhere — helpful if you are planning an extension with a neighbour, builder or architect.

Free quote in 60 seconds
Call us Free quote →

Before you go…

Get a free, no-obligation quote for your project. MCIAT chartered.

council-ready drawing review · All 33 London boroughs