020 7864 7245 [email protected] WhatsApp
Postcode coverage

Architectural drawings in RM4

Havering-atte-Bower — covered by Havering Council.

RM4 at a glance

Primary area
Havering-atte-Bower
Borough
Havering
Planning authority
Havering Council
Conservation areas (borough)
15
Quote turnaround
Same day

London period house exterior with architectural character — architectural drawings
Services in RM4

Drawings for every RM4 property type

Questions about RM4

RM4 planning FAQ

What borough is RM4?

RM4 primarily covers Havering-atte-Bower in Havering.

Do I need planning permission in RM4?

Decisions for RM4 are made by Havering Council. Standard Permitted Development rules apply for most rear extensions and loft conversions on terraced and semi-detached houses, unless the property is in a conservation area, is listed, or sits under an Article 4 Direction. Article 4 in Havering: No.

What does it cost to get drawings in RM4?

Building regs from £950. We do not charge hourly. Free site survey across all RM4 addresses.

How long does a project take in RM4?

From first call to planning decision: typically 12–14 weeks. Site survey week 1, design weeks 2–3, validation 1–2 weeks, statutory 8-week determination. Havering Council timelines align with the national norm.

What housing stock dominates RM4?

Havering-atte-Bower in RM4 is characterised by the housing stock of Havering — broadly 1930s semi-detached dominates hornchurch and upminster.

Boroughs covering RM4

Local authorities

Nearby postcodes in Havering

An architectural technologist checking a printed set of house drawings, marking a proposed elevation in red — architectural drawings in RM4
Every set is checked line by line against the validation checklist before it leaves the office.
Book a call

Speak to a chartered technologist — free 15 minutes

Pick a slot that suits you. No obligation and no sales pressure, just straight answers on your planning route.

Which postcode districts around RM4 do we cover for drawing package work?

Every RM4 postcode district we draw in, the stock that dominates it and the authority that validates a drawing package there. RM4 fees below are the statutory England rates for 2026, not drawing package estimates.

PostcodeAreaDominant stockWhat it means for a drawing package
RM4Havering-atte-Bowermixed Victorian and inter-war stockA drawing package at an RM4 address in Havering-atte-Bower is determined by Havering Council under its own Local Plan policies for Havering-atte-Bower.
RM1Romford CentralVictorian terraces, 1930s semi-detached, post-war flatsAdjoining district to RM4, also inside Havering for drawing package purposes.
RM2Gidea ParkVictorian terraces, 1930s semi-detached, post-war flatsAdjoining district to RM4, also inside Havering for drawing package purposes.
RM3Harold HillPost-war estateAdjoining district to RM4, also inside Havering for drawing package purposes.

What changes about a drawing package in each part of RM4?

Roof pitch, wall build-up and plot depth change every few RM4 streets, and each one changes what a drawing package can achieve at that address.

How do conservation areas and Article 4 affect a drawing package in RM4?

Conservation areas covering RM4 (Havering-atte-Bower): Havering Council runs 15, and Romford Market, Upminster, Hornchurch are the ones RM4 (Havering-atte-Bower) owners meet most. A drawing package inside a RM4 (Havering-atte-Bower) conservation area loses permitted development, so the RM4 (Havering-atte-Bower) submission is a householder application at £548 decided in 8 weeks — not a £249 prior approval decided in 6 weeks. In Rainham Village a drawing package is judged on the street elevation first.

No blanket Article 4 over RM4 (Havering-atte-Bower): Havering Council has not withdrawn permitted development across RM4 (Havering-atte-Bower), so a drawing package outside a RM4 (Havering-atte-Bower) conservation area usually keeps it. The £274 Lawful Development Certificate is still the document a RM4 owner wants on file.

What RM4 (Havering-atte-Bower) is built from: 1930s semi-detached dominates Hornchurch and Upminster; post-war in Harold Hill and Romford; Victorian in older Romford centre. Outer east London; Metropolitan Green Belt covers north of the borough; permissive residential planning; strong PD use. That mix decides the drawing package route in RM4 (Havering-atte-Bower) more than the postcode does, and it is what a Havering Council case officer reads first. A householder application costs £548 paid to Havering Council direct, with 8 weeks to a decision once validated.

Which neighbouring authorities border RM4?

Sources for this RM4 drawing package page: borough policies maps and conservation-area registers (2025–26), Royal Mail postcode district boundaries, the Town and Country Planning (Fees for Applications) (England) Regulations, the Town and Country Planning (General Permitted Development) (England) Order 2015 as amended, and the Party Wall etc. Act 1996.

Free quote for RM4

Same-day fixed quote. MCIAT chartered. No hourly creep.

Start free quoteOr contact us about your project first
A printed planning application drawing set — proposed elevations, floor plans and the os location plan with the site outlined in red — architectural drawings in RM4
The planning set that goes to the council through the Planning Portal: proposed elevations, plans, and the OS location plan with your site outlined.
Further reading

Guides & next steps

You can search by service or borough to find the right fit, or set up your account to track your project. When you are ready, get a quote for your project — most homeowners have a fee in minutes — or contact us and a chartered technologist will be in touch.

Found this useful? Share it

Copies the headline and the link, ready to paste anywhere — helpful if you are planning an extension with a neighbour, builder or architect.

Free quote in 60 seconds
Call us Free quote →

Before you go…

Get a free, no-obligation quote for your project. MCIAT chartered.

council-ready drawing review · All 33 London boroughs