020 7864 7245 [email protected] WhatsApp
Postcode coverage

Architectural drawings in RM5

Collier Row — covered by Havering Council.

RM5 at a glance

Primary area
Collier Row
Borough
Havering
Planning authority
Havering Council
Conservation areas (borough)
15
Quote turnaround
Same day

Victorian terraced street in London — architectural drawings
Services in RM5

Drawings for every RM5 property type

Questions about RM5

RM5 planning FAQ

What borough is RM5?

RM5 primarily covers Collier Row in Havering.

Do I need planning permission in RM5?

Decisions for RM5 are made by Havering Council. Standard Permitted Development rules apply for most rear extensions and loft conversions on terraced and semi-detached houses, unless the property is in a conservation area, is listed, or sits under an Article 4 Direction. Article 4 in Havering: No.

What does it cost to get drawings in RM5?

Building regs from £950. We do not charge hourly. Free site survey across all RM5 addresses.

How long does a project take in RM5?

From first call to planning decision: typically 12–14 weeks. Site survey week 1, design weeks 2–3, validation 1–2 weeks, statutory 8-week determination. Havering Council timelines align with the national norm.

What housing stock dominates RM5?

Collier Row in RM5 is characterised by the housing stock of Havering — broadly 1930s semi-detached dominates hornchurch and upminster.

Boroughs covering RM5

Local authorities

Nearby postcodes in Havering

An architectural technologist checking a printed set of house drawings, marking a proposed elevation in red — architectural drawings in RM5
Every set is checked line by line against the validation checklist before it leaves the office.
Book a call

Speak to a chartered technologist — free 15 minutes

Pick a slot that suits you. No obligation and no sales pressure, just straight answers on your planning route.

Where in RM5 does a drawing package actually get determined?

Every RM5 postcode district we draw in, the stock that dominates it and the authority that validates a drawing package there. RM5 fees below are the statutory England rates for 2026, not drawing package estimates.

PostcodeAreaDominant stockWhat it means for a drawing package
RM5Collier Row1930s semi-detachedRM5 covers Collier Row only; Havering Council handles the drawing package.
RM1Romford CentralVictorian terraces, 1930s semi-detached, post-war flatsAdjoining district to RM5, also inside Havering for drawing package purposes.
RM2Gidea ParkVictorian terraces, 1930s semi-detached, post-war flatsAdjoining district to RM5, also inside Havering for drawing package purposes.
RM3Harold HillPost-war estateAdjoining district to RM5, also inside Havering for drawing package purposes.
RM4Havering-atte-Bowermixed stockAdjoining district to RM5, also inside Havering for drawing package purposes.

What changes about a drawing package in each part of RM5?

Roof pitch, wall build-up and plot depth change every few RM5 streets, and each one changes what a drawing package can achieve at that address.

What local planning policy applies to a drawing package in RM5?

How designation changes a RM5 (Collier Row) drawing package: Havering Council maintains 15 conservation areas, including Hornchurch, Rainham Village, Romford Market. Inside any of them a RM5 (Collier Row) drawing package cannot rely on permitted development, and the route becomes a £548 householder application determined in 8 weeks rather than a £249 prior approval in 6 weeks. Rainham Village sets the tone for RM5 (Collier Row) casework.

No blanket Article 4 over RM5 (Collier Row): Havering Council has not withdrawn permitted development across RM5 (Collier Row), so a drawing package outside a RM5 (Collier Row) conservation area usually keeps it. The £274 Lawful Development Certificate is still the document a RM5 owner wants on file.

RM5 (Collier Row) housing stock: 1930s semi-detached dominates Hornchurch and Upminster; post-war in Harold Hill and Romford; Victorian in older Romford centre. Outer east London; Metropolitan Green Belt covers north of the borough; permissive residential planning; strong PD use. Read that before choosing a drawing package route in RM5 (Collier Row) — construction, not postcode, sets what is achievable. Havering Council charges £548 for a householder application and has 8 weeks to determine it.

Which neighbouring authorities border RM5?

Sources for this RM5 drawing package page: borough policies maps and conservation-area registers (2025–26), Royal Mail postcode district boundaries, the Town and Country Planning (Fees for Applications) (England) Regulations, the Town and Country Planning (General Permitted Development) (England) Order 2015 as amended, and the Party Wall etc. Act 1996.

Free quote for RM5

Same-day fixed quote. MCIAT chartered. No hourly creep.

Start free quoteOr contact us about your project first
Architectural drawings in RM5 — a London terraced street of the type we survey
A london terraced street of the type we survey — architectural drawings in RM5.
Further reading

Guides & next steps

Before you commit, it is worth understanding what it costs and seeing why homeowners choose us. You can search the site to find the right fit, or create a free account to track your project. When you are ready, get a quote in minutes — most homeowners have a fee in minutes — or contact us for a chat and a chartered technologist will be in touch.

Found this useful? Share it

Copies the headline and the link, ready to paste anywhere — helpful if you are planning an extension with a neighbour, builder or architect.

Free quote in 60 seconds
Call us Free quote →

Before you go…

Get a free, no-obligation quote for your project. MCIAT chartered.

council-ready drawing review · All 33 London boroughs