Building Regulations Drawings · Ealing

Building Regulations Drawings in Ealing

A construction-ready drawing package compliant with every Approved Document — Part A structure, Part B fire, Part L thermal, Part M accessibility — submitted to LABC or your approved inspector with structural calculations coordinated.

No hourly billing 3–4 weeks to submission Covering all Ealing postcodes

Victorian terraced street in London — building regulations in Ealing

What do building regulations require on an Ealing project?

The national Approved Documents, checked either by Ealing’s building control team or a registered approver. A full plans application must be decided within five weeks, extendable to two months by agreement, and the completion certificate follows within eight weeks of completion.

RequirementStandard or periodSource
External wall, new thermal element0.18 W/m²KApproved Document L, Volume 1
Roof, new thermal element0.15 W/m²KApproved Document L, Volume 1
Windows and doors1.4 W/m²KApproved Document L, Volume 1
Full plans decision5 weeks, or 2 months by agreementBuilding Regulations 2010, reg 14
Completion certificatewithin 8 weeks of completionBuilding Regulations 2010, reg 17
Building regulations packagefrom £840our fixed fee

Sources: Approved Document L, Volume 1: Dwellings (2021 edition, incorporating the 2023 amendments), limiting values for new thermal elements in an existing dwelling; the Building Regulations 2010 (as amended), regulations 14 and 17. Read at 1 September 2026. The package fee is our own published fixed fee. Building regulations approval is entirely separate from planning permission — Ealing approved 86.6% of its householder planning applications, which says nothing about building control.

What is a building regulations drawings package in Ealing?

For Ealing homeowners in Victorian and Edwardian villas in Ealing central; 1930s semi-detached in Northolt and Hanwell; mansion blocks along main roads; Bedford Park is a listed Arts & Crafts garden suburb, a building regulations drawings package is the full measured-survey-to-submission drawing set London Borough of Ealing needs in order to determine an application: existing and proposed plans, elevations and sections at 1:100 and 1:50, a location and site plan, and the supporting statements the case officer asks for.

Planning authority
London Borough of Ealing
Postcode districts
W3, W5, W7, W13, UB1, UB2…
Article 4
Article 4 for HMOs in specific streets in Acton, Ealing and Southall.
Typical housing stock
Victorian and Edwardian villas in Ealing central; 1930s semi-detached in Northolt and Hanwell; mansion blocks along main roads; Bedford Park is a listed Arts & Crafts garden suburb
Conservation areas
30 in Ealing
Timeline
3–4 weeks to submission

Prepared and reviewed by the architectural technologist team at Architectural Drawings London — CIAT Affiliate, professional indemnity insured.Last reviewed 2026-08-03.

Quick facts · Building Regulations Drawings in Ealing

Fees
See our fees
Typical turnaround
3–4 weeks to submission
Planning authority
Ealing Council
Conservation areas
30 in Ealing
Article 4 Direction
Yes
Postcodes covered
W3 and others
Planning context

How does planning policy in Ealing affect your building regulations drawings?

A construction-ready drawing package compliant with every Approved Document — Part A structure, Part B fire, Part L thermal, Part M accessibility — submitted to LABC or your approved inspector with structural calculations coordinated.

Housing stock in Ealing: Victorian and Edwardian villas in Ealing central; 1930s semi-detached in Northolt and Hanwell; mansion blocks along main roads; Bedford Park is a listed Arts & Crafts garden suburb.

Character: Leafy outer-west London; Bedford Park conservation area has strict heritage controls; rest of borough generally permissive.

Article 4: Ealing has an Article 4 direction covering houses in multiple occupation on named streets in Acton, Ealing and Southall, so a conversion that would pass as permitted development elsewhere requires a full application at those addresses.

Population
342,000
Conservation areas
30
Planning authority
Ealing Council
Postcodes
9 areas
What's included

Fully end-to-end in Ealing.

Full construction drawings

Plans, sections and elevations are drawn at 1:50 and annotated line by line, with every material named and specified, so the builder prices precisely the job the inspector will later be asked to sign off.

Thermal (Part L) calculations

U-values are calculated element by element, covering wall, roof, floor and each glazed opening, and a SAP or an SBEM run wherever the work brings a new dwelling into being, and a written compliance statement issued alongside the figures.

Structural calculations

Chartered engineer sign-off on beams, pad foundations, lintels, roof structure.

Fire safety (Part B) strategy

Escape routes, compartmentation, smoke alarms, fire-rated construction detail.

Drainage & services layout

Soil and vent pipe routes, MVHR coordination, EV charging (Part S).

Building Control submission

We lodge a Full Plans application with either Ealing Council's own building control service or a private approved inspector, then run the inspection sequence right through to the completion certificate instead of handing over a drawing set and stopping there.

Building Regulations Drawings in Ealing — structural calculations prepared for building control
Structural calculations prepared for building control — building regulations drawings in Ealing.
Fixed-fee architectural drawings

How much do building regulations drawings cost in Ealing?

Essentials

Single planning or regs submission.

  • Measured survey
  • Drawings & submission
  • Unlimited revisions
Start Essentials →

Bespoke

Listed, conservation, complex sites.

  • Everything in Complete
  • Heritage Statement
  • Committee representation
Discuss Bespoke →
Edwardian villas in Ealing W5
CIAT Affiliate council-ready drawing review No hourly billing All 33 London boroughs

Estimate your drawing costs in Ealing

Move the controls for an indicative figure. It anchors your budget — it is not a quote. Every project is priced after a site survey.

1 · Project type
2 · Approximate size
30 m²
3 · Add compliance packages
Indicative design fee £1,585
Book your free feasibility call

Build costs are separate and quoted by your contractor. See our published fees.

Which Ealing postcodes does this building regulations package service cover?

Ealing reaches into seven postcode districts and two of those cross a borough boundary. The table names each district, its dominant housing, and the authority that will determine a planning application lodged from it. Fee figures are the 2026 statutory amounts payable on submission and exclude what we charge for the work.

PostcodeAreaDominant stockWhat it means for a building regulations package
W4Chiswick / Bedford ParkArts & Crafts villas (listed)W4 straddles the Ealing and Hounslow boundary through Chiswick and Bedford Park, so a planning application from a W4 address must be tested against both policies maps before submission. Building control can go to either authority or to a private approved inspector.
W3ActonVictorian and Edwardian terracesActon is cut in two by the W3 district, with Ealing on one side of the line and Hounslow on the other. Both policies maps get read against the address ahead of submission; the building regulations package is identical whichever side of the line it turns out to be.
W5EalingEdwardian villas, Victorian terracesW5 is entirely Ealing. The Building Regulations that apply are national and identical to anywhere else in England; what changes locally is the planning route taken to get there and how long the borough takes over it.
W7HanwellEdwardian villas, 1930s semi-detachedW7 covers Hanwell only; Ealing Council handles the building regulations package.
W13West EalingEdwardian terracesW13 sits wholly in Ealing. Building regulations at a West Ealing address are handled either in-house by the borough or by an approved inspector; Local Plan policy for West Ealing governs the planning side, and only that.
UB1Southall NorthEdwardian terraces, post-war flatsUB1 covers Southall North and lies wholly inside Ealing. It forms part of Southall, one of the places named in the borough's Article 4 direction covering houses in multiple occupation, which takes the permitted development route off the table on those streets.
UB2Southall SouthEdwardian terraces, post-war flatsUB2, Southall South, is entirely within Ealing. An extension of time was agreed on 2,959 of the 6,051 applications this borough decided across three years, 48.9% where London averages 34.5%, so build a slipped date into the programme from the start.
UB5Northolt1930s semi-detached, post-war estatesUB5 covers Northolt and sits wholly in Ealing. Of the 1,822 householder decisions counted in the borough's 8-week measure, 98.6% were made inside that period, so once a submission is clean the planning side here moves quickly.

What changes about a building regulations package in each part of Ealing?

No two Ealing streets share the same roof pitch, wall build-up and plot depth all at once, and every one of those three decides what a building regulations package is obliged to demonstrate at one particular address.

Does Ealing planning policy restrict a building regulations package?

How designation changes a Ealing building regulations package: Ealing Council maintains 30 conservation areas, including Hanwell, Ealing Broadway, Pitshanger. Inside any of them a Ealing building regulations package cannot rely on permitted development, and the route becomes a £548 householder application determined in 8 weeks rather than a £249 prior approval in 6 weeks. Hanwell sets the tone for Ealing casework.

Ealing and Article 4: Article 4 for HMOs in specific streets in Acton, Ealing and Southall. A building regulations package planned at a W3 address is checked against that direction first; Ealing Council publishes the Ealing extent, and the W3 line rarely follows the Ealing boundary you would expect.

What Ealing is built from: Victorian and Edwardian villas in Ealing central; 1930s semi-detached in Northolt and Hanwell; mansion blocks along main roads; Bedford Park is a listed Arts & Crafts garden suburb. Leafy outer-west London; Bedford Park conservation area has strict heritage controls; rest of borough generally permissive. That mix decides the building regulations package route in Ealing more than the postcode does, and it is what a Ealing Council case officer reads first. A householder application costs £548 paid to Ealing Council direct, with 8 weeks to a decision once validated.

What happens if a Ealing property sits on a boundary?

Sources for this Ealing building regulations package page: borough policies maps and conservation-area registers (2025–26), Royal Mail postcode district boundaries, the Town and Country Planning (Fees for Applications) (England) Regulations, the Town and Country Planning (General Permitted Development) (England) Order 2015 as amended, and the Party Wall etc. Act 1996.

Ealing FAQs

Building Regulations Drawings in Ealing — your questions answered.

The questions below are the ones Ealing owners put to us most often once the planning route has been settled and the building control one has not.

Start a free quote →
Can I use LABC or an approved inspector in Ealing?

There are two routes in Ealing and they finish in the same place: the council's in-house building control service, or a private approved inspector. Each issues a legally valid completion certificate. We submit to whichever suits the programme and the builder, and we say which one we would choose and why.

How much do building regulations drawings cost in Ealing?

What a building regulations package costs in Ealing tracks the scope rather than the postcode: a single-storey extension or an ordinary loft is the baseline, while houses in multiple occupation, basement conversions and flat splits carry far more detail and coordination. Structural calculations follow the intervention itself: a single beam sits nowhere near a full loft or an underpinning package. See our fees.

Do I need building regs for a loft conversion in Ealing?

Yes. Every habitable loft conversion in Ealing needs Building Regulations approval covering fire escape, floor structure, insulation and the staircase, and that duty stands whether the roof work went through planning permission, a prior approval, or nothing at all. Of the borough's 891 larger householder prior approvals, 594 came back as not required, and not one of those outcomes touches the building control obligation.

What's Part L compliance for extensions in Ealing?

Part L fixes the minimum on insulation, glazing U-values, air permeability and heating efficiency. An Ealing extension designed now is built to the 2025 uplift on the road to the Future Homes Standard. The Part L calculations and the compliance statement sit inside every Complete package rather than arriving later as an extra line.

How long does building control take in Ealing?

Reckon on 5 to 8 weeks for Ealing Council building control to read a Full Plans submission, and 2 to 4 with a private approved inspector. Inspections then run through the build itself, commonly 6 to 10 visits depending on what is being put up.

What types of projects need building regulations in Ealing?

The regulations bite on a loft conversion, an extension, structural alteration, re-roofing, a new opening formed in a load-bearing wall, and on more or less anything done within a flat. A like-for-like replacement, or a modest porch, generally falls the other side of that line. Which side your particular job sits on is something we settle at the free site visit, before any money changes hands.

What is a completion certificate and how do I get one in Ealing?

The completion certificate is the document that closes the file. Ealing Council building control, or the approved inspector you appointed instead, signs it off once the last inspection has passed, and it is the paper a conveyancer or a lender asks for at the point of sale or re-mortgage. Driving the inspection sequence and getting that certificate signed forms part of the Complete package.

Do I need an energy performance certificate after building work in Ealing?

Work that alters how the building performs, whether an extension or a converted loft, brings the energy calculations with it, so an updated EPC or a SAP or SBEM run becomes part of demonstrating Part L compliance. Both of those calculations sit inside the Complete package and the Bespoke one.

Building Regulations Drawings in Ealing — an engineer marking up structural drawings
An engineer marking up structural drawings — building regulations drawings in Ealing.
Nearby boroughs

Building Regulations Drawings in areas adjacent to Ealing

If your property sits on a boundary, here are the neighbouring options.

Other services in Ealing

Need more than building regulations drawings?

Ealing put 891 larger-householder extensions through the prior approval route in the three years of returns closing at March 2026 and refused 243 of them, a refusal share of 27.3% where London as a whole sat on 24.9%. Whichever way the planning route falls, the building regulations package underneath it is the same piece of work, and one CIAT-affiliated team produces both. Contains public sector information licensed under the Open Government Licence v3.0

Planning Drawings in Ealing

Loft Conversions in Ealing

Every loft type across every Ealing roof line — dormer, mansard, hip-to-gable, L-shape, Velux. LDC or full planning route, building regulati...

House Extensions in Ealing

The whole spectrum — rear extensions, side returns, wraparounds, double-storey, basement digs. Planning-led design with detailed technical p...

Mansard Roof Extensions in Ealing

Ealing's most space-efficient loft solution when PD-route dormers are blocked. Our team designs mansards that get approved in Eali...

Garage Conversions in Ealing

Turn your unused Ealing garage into a bedroom, home office or open-plan kitchen-diner. Planning route assessment, full building regulations ...

Basement Conversions in Ealing

Full architectural technology service for basement digs and cellar conversions in Ealing — structural underpinning design, waterproofing str...

Structural Calculations in Ealing

Chartered structural engineer calculations for every residential intervention in Ealing — steel beams, lintels, pad foundations, wall remova...

Measured Building Surveys in Ealing

Measured surveys across Ealing — floor plans, elevations and sections to ±3mm accuracy. Leica Disto laser + BLK360 point-cloud scanning, Aut...

Party Wall Services in Ealing

End-to-end Party Wall Act 1996 service for Ealing — Section 1, 3 and 6 notices, schedule of condition surveys, party wall award coordination...

Rear Dormer Loft Conversions in Ealing

London's most popular loft type — the full-width rear dormer. Planning or Permitted Development route assessed for your Ealing property, bui...

Speak to a technologist

Get a callback in 30 minutes

Leave your number and an Architectural technologist will call you back within 30 minutes during working hours.

No obligation. No sales pressure. Just expert advice about building regulations drawings in Ealing.

Start your Ealing building regulations drawings application this week.

Free quote in 60 seconds. No hourly billing. CIAT Affiliate.

Get my free quote →

Found this useful? Share it

Copies the headline and the link, ready to paste anywhere — helpful if you are planning an extension with a neighbour, builder or architect.