Part L: energy efficiency for London extensions and lofts

Conservation of fuel and power. Thermal performance, energy efficiency, and insulation.

Architectural technologist reviewing planning drawings — building regulations in London
In short

Approved Document L sets the energy standards for building work. For an extension the elemental route applies: maximum U-values of 0.18 W/m²K for walls, 0.15 for a flat or pitched roof at ceiling level, 0.18 for floors and 1.4 for windows and doors, together with limits on the total area of glazing.

What are the extension U-values?

For new thermal elements in an extension: external walls 0.18 W/m²K, pitched roof insulated at ceiling level 0.16, pitched roof insulated at rafter level 0.16, flat roof 0.18, floors 0.18, windows and doors 1.4, and rooflights 2.2. Existing elements being upgraded have their own, less demanding, threshold values.

Glazing area in an extension is limited to 25% of the extension's floor area plus the area of any windows or doors covered up by it — a limit that catches large rear glazed extensions and is then dealt with by a whole-dwelling calculation instead.

How do you comply with a big glass box?

Where the elemental route fails on glazing area, compliance can be shown by calculation: demonstrating that the extended dwelling's carbon emissions are no worse than they would be for a notional compliant extension. That is a SAP-based exercise and needs an assessor.

What about a solid-wall Victorian house?

Achieving 0.18 W/m²K on a solid brick wall requires around 100 mm of insulation internally or externally, which is often impractical or unwanted. The regulations allow a lower standard where the measure is not technically or functionally feasible or where the payback exceeds 15 years — but that judgement should be recorded, with a condensation risk analysis to BS 5250.

What does approved document l (conservation of fuel and power) mean for a London project?

How approved document l (conservation of fuel and power) plays out in Croydon: London Borough of Croydon (Croydon Council) maintains 24 conservation areas, the South Norwood Conservation Area and the Crystal Palace Conservation Area among them, and there is no borough-wide Article 4 direction, so permitted development generally survives outside conservation areas. Anyone dealing with approved document l (conservation of fuel and power) at a Croydon address is therefore working to a £548 householder application decided in 8 weeks, or a £249 prior approval over 6 weeks where approved document l (conservation of fuel and power) still qualifies.

Approved Document L (conservation of fuel and power) at a glance

Key figures for Approved Document L (conservation of fuel and power)
Wall U-value, new element0.18 W/m²K
Pitched roof at ceiling level0.16 W/m²K
Flat roof0.18 W/m²K
Floor0.18 W/m²K
Window and door1.4 W/m²K
Glazing area limit25% of extension floor area, plus displaced openings

Common questions about approved document l (conservation of fuel and power)

Can I have a fully glazed rear extension?

Yes, but usually only by demonstrating compliance through a whole-dwelling calculation.

Do I have to insulate my existing walls?

Only where you are renovating them, and even then the feasibility and payback tests apply.

What U-value does a rooflight need?

2.2 W/m²K for a new rooflight in an extension.

An architectural technologist checking a printed set of house drawings, marking a proposed elevation in red — part l (building regs) in London
Every set is checked line by line against the validation checklist before it leaves the office.
Book a call

Speak to a chartered technologist — free 15 minutes

Pick a slot that suits you. No obligation and no sales pressure, just straight answers on your planning route.

Need help with Part L (Building Regs)?

Talk to our MCIAT teamOr contact us about your project first
Part L (Building Regs) in London — a London terraced street of the type we survey
A london terraced street of the type we survey — part l (building regs) in London.

Found this useful? Share it

Copies the headline and the link, ready to paste anywhere — helpful if you are planning an extension with a neighbour, builder or architect.

Free quote in 60 seconds
Call us Free quote →

Before you go…

Get a free, no-obligation quote for your project. MCIAT chartered.

council-ready drawing review · All 33 London boroughs