Building control: who signs off London building work

Council department (LABC) responsible for inspecting and signing off building works against the Building Regulations.

Architectural detail on a London period property — architectural drawings in London
In short

Building control is the regulatory check that construction work meets the Building Regulations 2010 — structure, fire safety, ventilation, energy, drainage, access and the rest. It is entirely separate from planning permission, and it is carried out either by the local authority or by a registered building control approver.

Who signs off building work, and how long do they have?

Either the council’s building control team or a registered building control approver. On a full plans application they must decide within five weeks, extendable to two months by written agreement; a building notice needs at least two days’ notice before work starts.

StepStatutory periodWhere it comes from
Full plans decision5 weeks, or 2 months by agreementBuilding Regulations 2010, reg 14
Building notice before startingat least 2 daysBuilding Regulations 2010, reg 12
Notice of commencementat least 2 daysBuilding Regulations 2010, reg 16
Notice of completionwithin 5 days of completionBuilding Regulations 2010, reg 16
Completion certificatewithin 8 weeks of completionBuilding Regulations 2010, reg 17
Enforcement time limit10 years from completionBuilding Act 1984, s.36

Sources: the Building Regulations 2010 (as amended) and the Building Act 1984, read at 1 September 2026. Approved inspectors were renamed registered building control approvers and brought under the Building Safety Regulator by the Building Safety Act 2022, with the register operating from April 2024 — a certificate from an unregistered inspector is not a valid completion certificate.

Full plans or building notice?

A full plans application submits the drawings and calculations for checking before work starts. The authority must decide within five weeks, extendable to two months by agreement, and you get a written approval you can build to and sell against.

A building notice skips the plan check: you give 48 hours' notice and the inspector assesses the work on site. It is faster to start and cheaper on paper, but it carries the whole risk of a wrong detail being found after it is built, and it is not available for work subject to the Regulatory Reform (Fire Safety) Order.

What gets inspected?

The standard inspection stages on a domestic project are excavation, foundation concrete, damp-proof course and oversite, drains laid and drains tested, floor and roof structure, insulation, and completion. Each is notified by the contractor, and covering up work before inspection is the usual cause of opening-up later.

What is the output?

A completion certificate from the council or a final certificate from a registered approver. Without it, a conveyancing solicitor will raise the absence on sale and a buyer's lender may require indemnity insurance or a regularisation application.

What does building control mean for a London project?

How building control plays out in Wandsworth: London Borough of Wandsworth (Wandsworth Council) maintains 45 conservation areas, the Wandsworth Common Conservation Area and the Clapham Common West Conservation Area among them, and an Article 4 direction is in force there, so permitted development cannot be assumed. Anyone dealing with building control at a Wandsworth address is therefore working to a £548 householder application decided in 8 weeks, or a £249 prior approval over 6 weeks where building control still qualifies.

Building control at a glance

Key figures for Building control
Governing lawBuilding Regulations 2010; Building Act 1984
Full plans decision period5 weeks, extendable to 2 months
Building notice period48 hours
Retrospective routeRegularisation application
OutputCompletion or final certificate
Separate fromPlanning permission

Common questions about building control

Is building control the same as planning?

No. Planning governs what you may build; building control governs how it must be built.

Can I use building control retrospectively?

Yes, via a regularisation application, though it usually means opening up work.

How long does approval take?

A full plans application must be decided within five weeks.

An architectural technologist checking a printed set of house drawings, marking a proposed elevation in red — building control in London
Every set is checked line by line against the validation checklist before it leaves the office.
Book a call

Speak to a chartered technologist — free 15 minutes

Pick a slot that suits you. No obligation and no sales pressure, just straight answers on your planning route.

Need help with Building Control?

Talk to our MCIAT teamOr contact us about your project first
Building Control in London — a London terraced street of the type we survey
A london terraced street of the type we survey — building control in London.

Found this useful? Share it

Copies the headline and the link, ready to paste anywhere — helpful if you are planning an extension with a neighbour, builder or architect.

Free quote in 60 seconds
Call us Free quote →

Before you go…

Get a free, no-obligation quote for your project. MCIAT chartered.

council-ready drawing review · All 33 London boroughs