Required on sale or rent. Triggered by new dwellings and major extensions.
An EPC rates a dwelling's energy efficiency from A to G and is required whenever a property is built, sold or let. It is valid for ten years. A new dwelling created by conversion needs one on completion, and a rented home in England currently needs a rating of E or better.
They use the same underlying calculation engine. A new dwelling's compliance is demonstrated through a SAP calculation, and the EPC is generated from the as-built SAP. An extension does not usually need a new EPC, because compliance is shown through elemental U-values instead.
Where a house is converted into flats, each new dwelling requires its own EPC produced from a SAP assessment, not the simplified RdSAP survey used for existing homes.
Heating system and controls carry the most weight, followed by fabric — loft and wall insulation — then glazing and lighting. On a solid-wall London terrace the practical order is loft insulation to 270 mm, draught proofing, heating controls, then internal or external wall insulation.
The rating is cost-based rather than carbon-based, which is why a heat pump does not always lift the letter grade as much as owners expect.
The Minimum Energy Efficiency Standard makes it unlawful to let a domestic property in England and Wales with an EPC below E, unless a valid exemption is registered on the PRS Exemptions Register. Listed buildings are not automatically exempt, contrary to common belief.
A worked Sutton example of energy performance certificate (epc): with 17 conservation areas — the Carshalton Village Conservation Area and the Beddington Park Conservation Area among the best known — London Borough of Sutton (Sutton Council) sees energy performance certificate (epc) constantly, and there is no borough-wide Article 4 direction, so permitted development generally survives outside conservation areas. Where energy performance certificate (epc) pushes a Sutton scheme out of permitted development, the route becomes a £548 application decided in 8 weeks rather than a £249 prior approval in 6 weeks.
| Scale | A to G |
|---|---|
| Validity | 10 years |
| Required on | Construction, sale and letting |
| Minimum for letting (England) | Band E |
| New dwelling method | SAP; RdSAP for existing homes |
| Extension | New EPC not normally required |
Not usually. Compliance is shown by U-values, and the existing certificate stands.
Not automatically. An exemption must be assessed and registered.
Ten years from the date of issue.