Covering London & the South East (Surrey, Kent) 020 8068 6981 [email protected] WhatsApp
Design · Planning application

House design and planning in one London package.

CIAT-affiliated technologists All 33 London boroughs Free resubmission if refused

London terraced house prepared for house design and planning application drawings

What is house design and planning, and what does it cover?

House design and planning is one service that takes a London home from a measured survey to a planning decision. We design the change, draw the existing and proposed plans, elevations and sections, submit the application and act as your agent until the council decides. Our fee starts at £840, and the council’s householder fee is £548.

From first visit to decision
StageWhat happensWhat you receive
1. Measured surveyWe measure the house, the plot and the boundaries on siteExisting plans and elevations
2. Design optionsLayouts tested against your brief and the council’s policiesSketch options to choose from
3. Planning setThe chosen scheme drawn to scale for submissionLocation plan, block plan, proposed plans, elevations, sections
4. SubmissionWe complete the forms and submit as your agentValidated application
5. DeterminationWe answer the case officer until a decision is issuedDecision notice

Every stage sits inside one fixed fee, with unlimited revisions to the design before submission, as set out on our pricing page.

What house design and planning costs
ItemPaid toFee
Essentials: survey, planning drawings, submission, agent serviceUsfrom £840
Complete: planning and building regulations drawings, structural calculationsUsfrom £1,750
House extension design, planning and regulationsUs£1,225–£3,150
Loft conversion design, planning and regulationsUs£1,225–£2,450
Householder application, one dwellinghouseCouncil£548
Householder application, two or more dwellinghousesCouncil£1,083
Lawful Development Certificate, proposed works (one house)Council£274
Prior approval, larger rear extensionCouncil£249
Discharge of conditions, householderCouncil£89

Statutory fees: MHCLG, Planning fees: annual indexation from 1 April 2026, retrieved 12 September 2026. Fees rose 3.8% on 1 April 2026, in line with the September 2025 CPI. Our fees: our fees from the pricing page, retrieved 12 September 2026.

One appointment

Why should design and planning sit with the same people?

Most planning problems start in the design. A rear extension drawn without looking at the neighbour’s kitchen window, a dormer that ignores the rhythm of the terrace, a side infill that forgets the boundary wall: the case officer spots each of them in the first read, and then the drawings go back and forth. When the person designing the house is the same person who will defend it to the council, those questions are settled at the sketch stage, before a fee is paid to anyone.

That is the reason this is one package rather than two. We do not produce a design and then hand it to someone else to “make it planning-friendly”. The options we show you have already been tested against the local plan, the borough’s design guidance and the practical limits on the plot. When you pick one, it is ready to draw up, not ready to be argued over.

It also keeps the money honest. The design work, the drawing set, the submission and the correspondence with the planning officer are one fixed fee. You are not billed again when the officer asks for a revised elevation, and the Essentials and Complete packages include a free resubmission if the application is refused.

The survey is where it starts. A measured survey of the house gives us the true wall positions, floor levels and window heights, and every later drawing is built on it. Designs drawn over estate-agent floor plans tend to fail at the section drawing, where a ceiling turns out lower than the brochure said.

The odds

How likely is a householder application to be approved?

Householder applications are the largest category the planning system handles, and most are granted. Nationally, just over half of all planning decisions in England are householder decisions, and nine in ten of those are approved. That average hides a lot: a modest rear extension on an unlisted house is a different proposition from a roof extension in a conservation area. What the figures do show is that a well-prepared, policy-compliant householder scheme is the normal, expected route, not a gamble.

Householder decisions in England
MeasureYear to March 2026Quarter to March 2026
Householder decisions151,90033,500
Share of all planning decisions51%49%
Granted90%91%
Decided within 8 weeks or agreed time93%93%

Source: MHCLG, Planning applications in England: January to March 2026, retrieved 12 September 2026. These are national figures for England, not London borough rates.

The eight-week clock only starts once the council validates the application. Missing drawings, a location plan without the red line, or the wrong fee all stop it before it starts. That is why the submission stage matters as much as the design.

Before you apply

Do you need planning permission at all?

Part of designing a house is knowing which route it takes. The Town and Country Planning (General Permitted Development) (England) Order 2015 allows many householder extensions without an application, as long as they stay within set limits. Class A covers extensions to the house and Class B covers additions to the roof, such as a rear dormer.

Permitted development limits worth designing to
RuleLimit
Single-storey rear extension, attached house3 m deep
Single-storey rear extension, detached house4 m deep
Maximum height, single-storey rear extension4 m
Extension of more than one storey, depth3 m beyond the rear wall
Extension of more than one storey, rear boundaryat least 7 m away
“Original house” means the house as it stood on1 July 1948

Sources: MHCLG, Permitted development rights for householders: Technical Guidance (September 2019), retrieved 12 September 2026; Planning Portal, extensions, retrieved 12 September 2026. The guidance dates from 2019, so we check the current Order for your address before relying on any limit. Permitted development rights are narrower in conservation areas and may be removed by an Article 4 direction.

If your design fits within those limits, a planning application is the wrong tool. We would design to the limits and apply for a Lawful Development Certificate, which costs £274 for a single house and gives you, and a future buyer’s solicitor, written confirmation that the work was lawful. Our permitted development drawings are prepared for exactly that route. Where a larger single-storey extension, up to 6 m on an attached house, is worth pursuing, the prior approval route costs £249 and involves neighbour consultation.

If the design needs more than permitted development allows, we say so early, and we design the strongest scheme the local policies will support rather than the largest one you could imagine.

The drawings

What drawings does the council expect to see?

A householder application is judged on its drawings. The officer needs to see where the site is, what exists now and what will exist afterwards, at scales that can be measured. We draw every set from the survey, so dimensions on the plans agree with the elevations and sections.

What the validation officer checks first
DrawingUsual scale
Site location plan, site edged red1:1250 or 1:2500
Block plan1:500
Site plan1:200

Source: Planning Portal, Maps, plans and planning applications, retrieved 12 September 2026. Each London borough publishes its own local validation list on top of the national requirements, and we check it before submission.

On top of those, the set carries existing and proposed floor plans, existing and proposed elevations of every face that changes, and a section through the new work wherever levels or roof form change. Where the site is in a conservation area we add a heritage statement. Where a neighbour’s light is in question we test the scheme against the 45-degree rule before the officer does.

The value question

Is designing and extending worth it in the current London market?

That depends on your house and your plans, and we will not pretend otherwise. What the published figures say is that London prices have been falling slowly, while remaining roughly double the UK average. For many households that makes adding a bedroom or a larger kitchen more attractive than paying moving costs on a bigger house, but the sums are yours to run.

The London market the design has to answer to
MeasureFigure
Average London house price, June 2026£553,870
Annual change in London−2.5%
Consecutive months of annual falls in London10
UK average house price, June 2026£272,000

Source: HM Land Registry, UK House Price Index summary: June 2026, retrieved 12 September 2026.

What we can control is the cost of getting to a decision. A house extension or a loft conversion taken through design, planning and building regulations drawings under one fixed fee gives you a known number before any builder is asked to price the work.

Design and planning FAQs

Questions homeowners ask before they start.

Not covered here? Call 020 8068 6981 or start a free quote.

How long does house design and planning take from first visit to decision?

There are two clocks. The design clock is ours: survey, options, your chosen scheme and the finished drawing set, which depends mostly on how quickly you settle the design. The decision clock is the council’s: a householder application has an eight-week statutory period once it is validated, and in the year to March 2026, 93% of householder decisions in England were made within eight weeks or an agreed extension.

Is the £548 council fee included in your price?

No. The £548 householder application fee is a statutory charge paid to the council, and it applies to works to a single dwellinghouse. Our fee covers the survey, the design, the drawings and our work as your agent. We tell you the exact council fee for your scheme before we submit.

What happens if the council refuses the application?

The Essentials and Complete packages include a free resubmission if the application is refused. We read the officer’s report, change the design to answer the stated reasons, and resubmit. Refusal is the minority outcome: 90% of householder applications decided in England in the year to March 2026 were granted.

Can you design something that does not need planning permission?

Often, yes. Many single-storey rear extensions and loft dormers fall within permitted development. In that case we design to those limits and usually recommend a Lawful Development Certificate, which costs half the planning fee, so £274 for a single house, and gives you written proof that the work is lawful.

Do I also need building regulations drawings?

Almost always, if the work is built. Planning decides whether you may build it; building regulations decide how it must be built. The Complete package, from £1,750, carries the planning drawings, the building regulations drawings and the structural calculations together.

Get your house design and planning priced

Tell us about the house and what you want to change. An architectural technologist will reply with a fixed fee.

Get my free quote
Further reading

Guides & next steps

You can search by service or borough to find the right fit, or contact us to talk it through. When you are ready, get a quote today — most homeowners have a fee in minutes — or contact us about your project and an architectural technologist will be in touch.

Found this useful? Share it

Copies the headline and the link, ready to paste anywhere — helpful if you are planning an extension with a neighbour, builder or architect.

Planning permission by London area

Each area page carries the local planning authority, conservation-area position, postcode districts and typical housing stock for that address.

Free quote in 60 seconds
Call us Free quote →

Before you go…

Get a free, no-obligation quote for your project. CIAT Affiliate.

council-ready drawing review · All 33 London boroughs