Elevations & sections · 1:100 and 1:50

Elevations and sections drawn against a real surveyed datum

London gardens slope, and permitted development heights have no tolerance for that. A rear extension measuring 2.9 metres at the house can measure 3.3 at the garden end. Sections drawn from a surveyed datum are how you find that out before you build it, not after.

Get a quote Call 020 8068 6981

Architectural technologist at work — architectural drawings in London
8
Elevations in a typical application
1:100
Usual planning scale
£840
Essentials package, both included

What is the difference between an elevation and a section?

An elevation is the building seen straight on from outside, with no perspective: it shows what a face of the building looks like. A section is the building sliced vertically, showing floor and ceiling levels, roof pitch and wall build-ups. Elevations answer how it looks. Sections answer how tall it is.

ElevationSection
ShowsThe outside face, straight onA vertical slice through
AnswersWhat does it look like?How tall is it?
Planning scale1:100, or 1:50 in a conservation area1:100 or 1:50
Number usually requiredFour existing, four proposedAt least one of each
Carries ground levelsSometimesAlways, against a datum
Building regs version addsMaterials and openingsEvery build-up and head height

Drawing conventions follow BS 1192 and standard London validation checklist requirements; scales and required views vary slightly between boroughs, so the local checklist governs.

Elevation or section — which is which?

An elevation is what a photograph taken from infinitely far away with an infinitely long lens would show: the face of the building, flat, with no perspective and nothing converging. That flatness is the point. It means an officer can measure directly off the drawing, and can compare your proposed rear elevation against your existing one without allowing for the angle it was drawn from.

A section is a cut. Imagine slicing the house vertically with a very large knife and standing at the cut looking in. You see the floor levels, the ceiling heights, the pitch of the roof, the depth of the foundations, and — in a building regulations section — every material layer in the walls, floors and roof.

Applicants frequently submit four elevations and no section, on the reasoning that the elevations already show the height. They show an outline height. They do not show floor-to-ceiling dimensions, they do not show the relationship between the new floor level and the existing one, and they do not show whether a person can stand up in the room you are proposing.

How many drawings does an application actually need?

The honest answer is: as many as it takes for the officer to never have to imagine anything. In practice that is four elevations existing, four proposed, and at least one section of each.

DrawingExistingProposedTypical scale
Front elevationYesYes1:100
Rear elevationYesYes1:100
Side elevations (both)YesYes1:100
Section through the worksYesYes1:100 or 1:50
Street scene elevation—Where the frontage changes1:200

The street scene is the one worth volunteering. It shows your proposal drawn alongside the two or three houses either side, and it answers the question a case officer is actually asking — whether the thing will look out of place. On a terrace where every neighbour already has a rear extension, a street scene converts an argument into a picture.

Ground levels, datums, and why heights go wrong

London gardens slope. A rear extension that measures 2.9 metres to the eaves at the house can measure 3.3 metres at the garden end, and the permitted development limit for the eaves of a single-storey rear extension is 3 metres, absolutely, with no tolerance for the fact that your garden falls away.

This is what a datum is for. A section carries a fixed reference level — a manhole cover, a threshold, an ordnance datum height — and every height on every drawing is measured from it. Without one, each drawing is measured from whatever ground happened to be under it, and the set silently disagrees with itself.

It is also why a measured survey comes before the drawings rather than after. Levels are surveyed, not assumed, and our measured building survey establishes the datum that the whole set is then drawn against.

What changes at the building regulations stage?

The elevations barely change. The sections change completely.

A planning section is an outline: floor, ceiling, roof, height. A building regulations section is the same cut annotated with every layer — screed and insulation thicknesses, the damp-proof course and where it laps the membrane, the joist size and centres, the insulation between and below the rafters, the ventilation path, and the clear head height under any new beam.

That last one decides whether the project works. A loft conversion needs 2 metres of head height over the centre line of the stair, and the section is where you find out whether you have it before you have paid anyone to build it. Our building regulations drawings carry the annotated sections, and the structural drawings confirm the beam sizes they are drawn against.

What do elevations and sections cost in London?

PackageFixed feeSections annotated for building control
Essentials — survey, plans, elevations, sectionfrom £840No
Loft conversion packagefrom £1,225Yes
Mansard / roof rebuild packagefrom £1,575Yes
Complete — planning plus building regulationsfrom £1,750Yes

Across London, 83.0% of the 77,680 householder applications decided in the twelve quarters to March 2026 were approved, and 39.0% of the 15,646 householder appeals decided by the Planning Inspectorate were allowed. Both numbers say the same thing: most householder schemes are acceptable in principle, and the ones that fail usually fail on how they were presented rather than on what they proposed.

Source: Planning Inspectorate appeals casework, decided appeals only; withdrawn, invalid and unrecorded outcomes are excluded from the denominator. Retrieved 1 September 2026. Open Government Licence v3.0.

Why do drawings fail before anyone has looked at the design?

Because validation is a completeness check, not a judgement, and it happens first. A validation officer is not deciding whether your extension is acceptable — they are confirming the application is capable of being assessed at all. A set that fails here never reaches a case officer, and the clock never starts. It is the cheapest rejection to avoid and the most annoying to receive.

Two requirements are statutory and apply everywhere in England. Every plan and drawing must be drawn to an identified scale, and every plan must show the direction of north. A drawing marked “not to scale”, or scaled to something no rule measures like 1:1.25, fails on the first. An elevation does not need a north point; a floor plan or site plan does, and omitting it is one of the most common single-item rejections.

What gets rejectedWhy
Proposed elevations with no existing pairThe officer cannot see what changes without both
No scale stated, or an unmeasurable oneArticle 7(2) requires an identified scale on every drawing
No north point on a planArticle 7(2) requires it; orientation drives overlooking and light
All four elevations not shownA flank wall left out is assumed to be the one you are hiding
Drawing numbers that do not match the formThe authority cannot record what it is deciding on
Levels missing where the ground fallsHeight cannot be checked without a stated datum

Source: Town and Country Planning (Development Management Procedure) (England) Order 2015 (SI 2015/595), article 7(1)(c) and 7(2). Retrieved 3 September 2026. Open Government Licence v3.0. Individual boroughs publish their own local validation lists in addition to these national requirements.

When do you need a street scene elevation?

Whenever the argument is about how the building sits among its neighbours rather than what it does on its own plot. A street scene draws your house with the properties either side, at the same scale, on the same ground line — and it either wins the point or loses it in one glance. Front extensions, mansards, dormers to a front roof slope, anything raising a ridge, and almost anything in a conservation area will attract the request.

It is worth volunteering one before you are asked, for a reason that has nothing to do with compliance. Most refusals of this kind turn on a phrase like “incongruous in the streetscene”, which is a visual claim. If the only visual evidence in the file is a photograph taken by an objector, that claim goes unanswered. A drawn street scene puts your proposal in the same frame as the terrace it joins, and where the neighbours already have the thing you are proposing, it makes that fact impossible to overlook.

One caution: draw it honestly. A street scene that quietly flattens a neighbour’s ridge or omits the house that already has a mansard is worse than none, because the officer will visit the site.

Elevation and section questions

What is the difference between an elevation and a section?

An elevation is the building seen from outside, straight on, with no perspective — what the front or back looks like. A section is the building sliced vertically and viewed from the cut, showing floor and ceiling levels, roof pitch and what is inside the walls. Elevations show appearance; sections show heights.

How many elevations does a planning application need?

Normally all four, existing and proposed, so eight drawings. Some councils accept fewer where a side is entirely enclosed by a neighbouring building, but the safe assumption is four and four. Missing elevations are one of the most common validation failures.

What scale are elevations and sections drawn at?

1:100 for planning in most cases, or 1:50 where the detail matters — a conservation area frontage, or a scheme judged on window proportions. Building regulations sections are normally 1:50 so the build-up annotations are legible.

Why do sections need ground levels marked?

Because height is measured from the ground, and London gardens are rarely level. A proposal that is 2.9 metres to the eaves at one end can be 3.3 at the other, and permitted development limits are absolute. Sections carry a datum so every height on the drawing is measured from the same fixed point.

Do I need sections for building regulations as well as planning?

Yes, and they are different drawings. The planning section shows form and height. The building regulations section adds every build-up: insulation thicknesses, damp-proof course, floor construction, ventilation and the head height under any new beam.

Are elevations and sections included in your fee?

Yes, in every package from £840. Existing and proposed elevations and at least one section are in the Essentials package; building regulations sections come with Complete.

Last updated: 2 September 2026 · Written by the Architectural Drawings London technical team, affiliated with the Chartered Institute of Architectural Technologists (CIAT). · About our team

Get your elevations and sections drawn off a levelled survey

Site plans are included in every drawing package we produce, on a licensed Ordnance Survey base with the ownership edging done properly.

Get a quote
A printed planning application drawing set — proposed elevations, floor plans and the os location plan with the site outlined in red — site plan drawings for london planning applications in London
The planning set that goes to the council through the Planning Portal: proposed elevations, plans, and the OS location plan with your site outlined.
Further reading

Guides & next steps

Before you commit, it is worth understanding what it costs and seeing why homeowners choose us. You can search the site to find the right fit, or contact us to talk it through. When you are ready, get a quote today — most homeowners have a fee in minutes — or contact us about your project and an architectural technologist will be in touch.

Found this useful? Share it

Copies the headline and the link, ready to paste anywhere — helpful if you are planning an extension with a neighbour, builder or architect.

Site plan drawings for London planning applications in London — a measured survey being recorded on site
A measured survey being recorded on site — site plan drawings for london planning applications in London.

Architectural drawings by London area

Each area page carries the local planning authority, conservation-area position, postcode districts and typical housing stock for that address.