The highest point of a roof. Cannot be exceeded by any PD roof extension.
The ridge is the highest horizontal line of a pitched roof, and ridge height is measured from the highest adjacent ground level. It matters because permitted development for a roof extension prohibits exceeding the highest part of the existing roof, and because a raised ridge is one of the first things a case officer checks.
Because Class B forbids any enlargement above the highest part of the existing roof. The ridge sets the ceiling for the whole scheme, and the dormer must also sit at least 200mm back from the original eaves. Inside a conservation area Class B does not apply at all, so both tests give way to a full application.
| Class B condition | Limit | Measured from |
|---|---|---|
| Above the highest part of the existing roof | not permitted | the original ridge |
| Set back from the eaves | at least 200mm | the original eaves |
| Beyond the plane of the front roof slope | not permitted | the front elevation |
| Added roof volume, terrace | 40 m³ | the roof as originally built |
| Added roof volume, semi or detached | 50 m³ | the roof as originally built |
| Inside a conservation area | Class B does not apply | — |
Source: the Town and Country Planning (General Permitted Development) (England) Order 2015, Schedule 2, Part 1, Class B, as amended, read at 1 September 2026. ‘Originally built’ means the house as first constructed or as it stood on 1 July 1948, so a previous owner’s dormer counts against the volume allowance and any earlier ridge alteration counts against the height test.
Class B roof extensions must not exceed the highest part of the existing roof — so a dormer or hip-to-gable can fill the roof but not raise it. A mansard almost always exceeds it, which is one reason mansards need a full application.
Outbuildings are capped at 4 m for a dual-pitched roof, 3 m otherwise, and 2.5 m total within 2 m of a boundary. Single-storey rear extensions are capped at 4 m overall and 3 m within 2 m of a boundary.
From the highest part of the ground immediately adjacent to the building, not from the lowest, and not from a finished internal floor level. On a sloping London site this distinction routinely changes whether a scheme is permitted development.
It is a full planning application, and the assessment turns on the effect on the roofscape of the terrace or pair. Where a house is one of an unbroken pair, raising one ridge is very difficult; where the roofline is already varied, it is often achievable. Party wall notices follow, because the party wall has to be raised.
A worked Bexley example of ridge height: with 16 conservation areas — the Bexley Village Conservation Area and the Old Bexley Conservation Area among the best known — London Borough of Bexley (Bexley Council) sees ridge height constantly, and there is no borough-wide Article 4 direction, so permitted development generally survives outside conservation areas. Where ridge height pushes a Bexley scheme out of permitted development, the route becomes a £548 application decided in 8 weeks rather than a £249 prior approval in 6 weeks.
| Roof extension rule | Must not exceed the existing highest point |
|---|---|
| Measured from | Highest adjacent ground level |
| Outbuilding, dual pitch | 4 m maximum |
| Outbuilding, other roof | 3 m maximum |
| Within 2 m of a boundary | 2.5 m maximum |
| Rear extension | 4 m, or 3 m within 2 m of a boundary |
No. Class B expressly prohibits exceeding the highest part of the existing roof.
No — from the highest adjacent external ground level.
A rooflight must not project more than 150 mm beyond the roof plane, and must not exceed the highest part of the roof.