Costs · Building control

Building regulation drawings cost in London for 2026

Building regulation drawings are priced in three separate parts that get confused constantly: the drawings themselves, the building control body’s charge, and the structural engineer. This page separates the three, gives 2026 London figures for each, and shows what actually moves the number.

Get a fixed-fee quote Call 020 7864 7245
Free fixed-fee quote

Tell us about your project

MCIAT chartered drawings for planning, building regs, lofts and extensions — fixed fees 30% below typical London architects. Tell us what you need and we’ll reply the same working day.

  • MCIAT chartered
  • Same working-day reply
  • Fixed fees from £840

What are you actually paying for?

‘Building regs drawings’ is used loosely to mean everything between planning permission and a builder starting. In fact it covers three separate purchases from three separate parties, and quotes that look wildly different usually differ in how many of the three they include.

  • The drawing package — produced by us. General arrangement plans, construction sections, structural layouts, specification notes and the schedule of compliance against each Approved Document. This is the £840 to £1,750 part.
  • The building control charge — paid to the borough or to a registered building control approver. Covers plan checking and the site inspections through to the completion certificate. Roughly £600 to £1,400 on domestic work in London.
  • Structural engineer’s calculations — a separate discipline. Beam and foundation design with calculations the approver checks. Commonly £450 to £1,200 on a domestic project.
£840
Drawings from, fixed
£600–£1,400
Building control charge
£450–£1,200
Structural calculations

How much do the drawings themselves cost?

PackageFixed feeTurnaround
Essentials — measured survey, existing and proposed plans£84014–20 working days
Loft conversion package — survey, plans, sections, elevations£1,22514–20 working days
Mansard / roof rebuild package£1,57518–24 working days
Complete — planning plus building regulations drawings£1,75020–28 working days

The Complete package at £1,750 is the one most extension and loft clients take, because it produces the planning set and the building regulations set from a single measured survey and a single model. Buying the two stages from different practices means paying twice for the same existing-condition information, and it puts the burden of reconciling two drawing registers on you when the builder finds a discrepancy.

Where planning permission already exists and only the construction set is needed, we price from the approved drawings and the survey they were based on. Where the approved drawings came from someone else and no survey is available, a fresh measured survey is required first, because building control detail cannot be drawn against dimensions nobody has verified.

What does building control charge in London?

You have a genuine choice of control body, and it affects both cost and programme. Every London borough runs its own building control service, and private registered building control approvers compete with them.

RouteTypical London chargeCharacter
Local authority, Full Plans£750–£1,400Plans checked and approved before work starts
Local authority, Building Notice£600–£1,100No plan check; risk carried on site
Registered building control approver£700–£1,500Initial notice served; often faster inspection booking
Regularisation, unauthorised work£900–£2,000+Retrospective; opening-up frequently required

Full Plans is worth the premium over a Building Notice on anything structural. Full Plans means the detail is checked and approved on paper before the builder is on site, so a fire-strategy or insulation problem costs a drawing revision rather than a rebuilt stair enclosure. A Building Notice defers every one of those decisions to a site inspector standing in front of finished work.

Regularisation is the expensive route nobody plans for: applying retrospectively for work already built without approval. Beyond the higher charge, the inspector will normally require opening up completed finishes to verify what is behind them, and there is no completion certificate until they are satisfied.

What makes building regulation drawings more expensive?

  • Number of structural interventions — each removed wall, new opening or replaced purlin is a beam to design, detail and check. A loft with two steels is a different job from one with six.
  • Foundation conditions — London clay with mature trees nearby regularly drives foundations to 2.5 metres or deeper, or to a piled and beamed solution with its own drawing set.
  • Drainage — building over or within 3 metres of a public sewer means a build-over agreement with Thames Water, a drainage strategy drawing, and a lead time that often exceeds the planning decision.
  • Fire strategy complexity — a two-storey house becoming three storeys, an inner room created by an extension, or a flat conversion each change the escape strategy for the whole building.
  • Party wall interfaces — work bearing on a shared wall needs detailing that satisfies both the approver and the party wall surveyor’s award.
  • Conservation area or listed statusPart L compliance has to be achieved without the standard fabric solutions, which means bespoke build-ups and a fuller specification.

What does not change our price is the number of revisions the approver asks for. Responding to plan-check comments is part of the job we were engaged to do, and it is inside the fixed fee.

How long does building control approval take?

The drawings take 14 to 28 working days depending on the package. Once submitted, a Full Plans application must be determined within five weeks, extendable to two months by written agreement with the applicant — and in practice most London plan checks return comments inside three to four weeks, with approval following shortly after the response.

A Building Notice has no approval stage at all: 48 hours’ notice and the builder can start. That is its only advantage, and it is why it suits a re-roof or a window replacement rather than a loft conversion.

The completion certificate is issued after the final inspection, not after the work looks finished. It is the document your solicitor will need at sale, and it will not be issued if inspections were missed at the stages where the work is later covered up — foundations, damp-proof course, structure and insulation before plasterboard.

Building regulation drawing cost questions

How much do building regulation drawings cost in London?

Our fixed fees start at £840 for the Essentials package and £1,750 for the Complete package covering both planning and building regulations from one survey. On top of that, budget £600 to £1,400 for the building control body's own charge and £450 to £1,200 for structural calculations if the scheme has beams.

Is the building control fee included in your price?

No, and no honest quote includes it. Building control charges are set by the borough or by the private approver you appoint and are paid directly to them. We recommend the route that suits your project and tell you the expected charge before you commit.

What is the difference between Full Plans and a Building Notice?

Full Plans means the drawings are checked and formally approved before work starts, and must be determined within five weeks. A Building Notice skips the plan check entirely — 48 hours' notice and the builder starts, with every compliance decision made on site by the inspector. For anything structural, Full Plans is worth the premium.

Do I need building regulations approval if I have planning permission?

Yes. They are separate consents. Planning permission governs what the building looks like and how it affects neighbours; building regulations govern whether it is structurally safe, fire safe, insulated and drained. An extension built under permitted development with no planning application at all still needs full building control approval.

Can I use a private approved inspector instead of the council?

Yes. Registered building control approvers compete with local authority teams and often book inspections faster. The charge is broadly comparable, £700 to £1,500 on domestic work. They serve an initial notice on the council and take on the same statutory function.

What if the work was already built without approval?

You apply for regularisation. It costs more — commonly £900 to £2,000 or above — and the inspector will normally require finished work to be opened up so the construction behind it can be verified. No completion certificate is issued until they are satisfied, which is what a buyer's solicitor will ask for.

Last updated: 28 July 2026 · Written by the Architectural Drawings London technical team, chartered members of the Chartered Institute of Architectural Technologists (MCIAT). · About our team

Get your building regs drawings priced

Send the address and the scope. Fixed fee back the same working day, with the building control route recommended for your borough.

Get a fixed-fee quote
Further reading

Guides & next steps

Before you commit, it is worth understanding transparent fixed fees and seeing our 98% approval record. You can search by service or borough to find the right fit, or set up your account to track your project. When you are ready, get a quote for your project — most homeowners have a fee in minutes — or contact us and a chartered technologist will be in touch.