Building regulation drawings are priced in three separate parts that get confused constantly: the drawings themselves, the building control body’s charge, and the structural engineer. This page separates the three, gives 2026 London figures for each, and shows what actually moves the number.
MCIAT chartered drawings for planning, building regs, lofts and extensions — fixed fees 30% below typical London architects. Tell us what you need and we’ll reply the same working day.
‘Building regs drawings’ is used loosely to mean everything between planning permission and a builder starting. In fact it covers three separate purchases from three separate parties, and quotes that look wildly different usually differ in how many of the three they include.
| Package | Fixed fee | Turnaround |
|---|---|---|
| Essentials — measured survey, existing and proposed plans | £840 | 14–20 working days |
| Loft conversion package — survey, plans, sections, elevations | £1,225 | 14–20 working days |
| Mansard / roof rebuild package | £1,575 | 18–24 working days |
| Complete — planning plus building regulations drawings | £1,750 | 20–28 working days |
The Complete package at £1,750 is the one most extension and loft clients take, because it produces the planning set and the building regulations set from a single measured survey and a single model. Buying the two stages from different practices means paying twice for the same existing-condition information, and it puts the burden of reconciling two drawing registers on you when the builder finds a discrepancy.
Where planning permission already exists and only the construction set is needed, we price from the approved drawings and the survey they were based on. Where the approved drawings came from someone else and no survey is available, a fresh measured survey is required first, because building control detail cannot be drawn against dimensions nobody has verified.
You have a genuine choice of control body, and it affects both cost and programme. Every London borough runs its own building control service, and private registered building control approvers compete with them.
| Route | Typical London charge | Character |
|---|---|---|
| Local authority, Full Plans | £750–£1,400 | Plans checked and approved before work starts |
| Local authority, Building Notice | £600–£1,100 | No plan check; risk carried on site |
| Registered building control approver | £700–£1,500 | Initial notice served; often faster inspection booking |
| Regularisation, unauthorised work | £900–£2,000+ | Retrospective; opening-up frequently required |
Full Plans is worth the premium over a Building Notice on anything structural. Full Plans means the detail is checked and approved on paper before the builder is on site, so a fire-strategy or insulation problem costs a drawing revision rather than a rebuilt stair enclosure. A Building Notice defers every one of those decisions to a site inspector standing in front of finished work.
Regularisation is the expensive route nobody plans for: applying retrospectively for work already built without approval. Beyond the higher charge, the inspector will normally require opening up completed finishes to verify what is behind them, and there is no completion certificate until they are satisfied.
What does not change our price is the number of revisions the approver asks for. Responding to plan-check comments is part of the job we were engaged to do, and it is inside the fixed fee.
The drawings take 14 to 28 working days depending on the package. Once submitted, a Full Plans application must be determined within five weeks, extendable to two months by written agreement with the applicant — and in practice most London plan checks return comments inside three to four weeks, with approval following shortly after the response.
A Building Notice has no approval stage at all: 48 hours’ notice and the builder can start. That is its only advantage, and it is why it suits a re-roof or a window replacement rather than a loft conversion.
The completion certificate is issued after the final inspection, not after the work looks finished. It is the document your solicitor will need at sale, and it will not be issued if inspections were missed at the stages where the work is later covered up — foundations, damp-proof course, structure and insulation before plasterboard.
Our fixed fees start at £840 for the Essentials package and £1,750 for the Complete package covering both planning and building regulations from one survey. On top of that, budget £600 to £1,400 for the building control body's own charge and £450 to £1,200 for structural calculations if the scheme has beams.
No, and no honest quote includes it. Building control charges are set by the borough or by the private approver you appoint and are paid directly to them. We recommend the route that suits your project and tell you the expected charge before you commit.
Full Plans means the drawings are checked and formally approved before work starts, and must be determined within five weeks. A Building Notice skips the plan check entirely — 48 hours' notice and the builder starts, with every compliance decision made on site by the inspector. For anything structural, Full Plans is worth the premium.
Yes. They are separate consents. Planning permission governs what the building looks like and how it affects neighbours; building regulations govern whether it is structurally safe, fire safe, insulated and drained. An extension built under permitted development with no planning application at all still needs full building control approval.
Yes. Registered building control approvers compete with local authority teams and often book inspections faster. The charge is broadly comparable, £700 to £1,500 on domestic work. They serve an initial notice on the council and take on the same statutory function.
You apply for regularisation. It costs more — commonly £900 to £2,000 or above — and the inspector will normally require finished work to be opened up so the construction behind it can be verified. No completion certificate is issued until they are satisfied, which is what a buyer's solicitor will ask for.
Send the address and the scope. Fixed fee back the same working day, with the building control route recommended for your borough.
Get a fixed-fee quoteBefore you commit, it is worth understanding transparent fixed fees and seeing our 98% approval record. You can search by service or borough to find the right fit, or set up your account to track your project. When you are ready, get a quote for your project — most homeowners have a fee in minutes — or contact us and a chartered technologist will be in touch.