Resistance to air leakage. Tested at building-regs sign-off (in homes above a threshold size).

Victorian terraced street in London — architectural drawings in London
In short

Airtightness is how much air leaks through the building fabric, measured as air permeability in m³/(h·m²) at 50 Pa. Approved Document L sets a maximum of 8 m³/(h·m²) for new dwellings, with 5 or better needed in practice to pass the SAP calculation. Extensions are not usually tested, but the same detailing decides whether the room is comfortable.

How is airtightness measured?

A blower door fan is sealed into an external doorway and the dwelling is pressurised to 50 pascals. The airflow needed to hold that pressure, divided by the envelope area, gives air permeability. A new dwelling in England must not exceed 8 m³/(h·m²), and the design air permeability used in the SAP calculation has to be met or bettered on test.

Extensions and most conversions are not pressure tested. Compliance is instead shown through the elemental U-value route, so the airtightness work is judged on the drawings and on site rather than by a number.

Which details leak?

The dominant leakage paths in a London retrofit are the loft hatch, the junction between a suspended timber floor and the external wall, service penetrations under the kitchen units, unsealed downlights, and the gap behind dry-lined walls that connects the floor void to the loft.

A continuous air barrier line drawn on the section — one unbroken pencil line around the heated envelope — is the single most useful drawing for airtightness. Where the line has to break, the detail is drawn.

How does airtightness interact with ventilation?

Making a house tighter without adding ventilation causes condensation and poor indoor air quality. Approved Document F sets the ventilation rates that go with the tighter fabric — trickle ventilators in habitable rooms, intermittent extract at 30 l/s in a kitchen or 15 l/s continuous, and 6 l/s intermittent in a bathroom.

Below roughly 3 m³/(h·m²), continuous mechanical ventilation with heat recovery becomes the sensible system, because natural background ventilation can no longer be relied on.

What does airtightness mean for a London project?

How airtightness plays out in Merton: London Borough of Merton (Merton Council) maintains 28 conservation areas, the Wimbledon Village Conservation Area and the John Innes Conservation Area among them, and there is no borough-wide Article 4 direction, so permitted development generally survives outside conservation areas. Anyone dealing with airtightness at a Merton address is therefore working to a £548 householder application decided in 8 weeks, or a £249 prior approval over 6 weeks where airtightness still qualifies.

Airtightness at a glance

Key figures for Airtightness
Regulatory maximum, new dwellings8 m³/(h·m²) at 50 Pa
Typical good practice3–5 m³/(h·m²) at 50 Pa
Passivhaus benchmark0.6 air changes per hour at 50 Pa
Test methodBlower door, pressurisation to 50 Pa
Governing documentApproved Document L, with Approved Document F
Applies to extensions?Not usually tested; detailing still required

Common questions about airtightness

Do I need an air test for an extension?

No. Air pressure testing applies to new dwellings. An extension complies through U-values and detailing instead.

Can a house be too airtight?

Only if ventilation is not designed with it. Tight fabric plus a properly sized MVHR or continuous extract system is comfortable and healthy.

Who carries out the test?

An ATTMA-registered or UKAS-accredited tester, normally booked by the contractor near completion.

Airtightness in London — the exterior of London house before works
The exterior of a london house before works — airtightness in London.
Book a call

Speak to a chartered technologist — free 15 minutes

Pick a slot that suits you. No obligation and no sales pressure, just straight answers on your planning route.

Need help with Airtightness?

Talk to our MCIAT teamOr contact us about your project first
An architectural technologist checking a printed set of house drawings, marking a proposed elevation in red — airtightness in London
Every set is checked line by line against the validation checklist before it leaves the office.

Found this useful? Share it

Copies the headline and the link, ready to paste anywhere — helpful if you are planning an extension with a neighbour, builder or architect.

Free quote in 60 seconds
Call us Free quote →

Before you go…

Get a free, no-obligation quote for your project. MCIAT chartered.

council-ready drawing review · All 33 London boroughs