020 7864 7245 [email protected] WhatsApp

The team

MCIAT chartered. Named. Borough-experienced.

Technical drawings reviewed on tablet — architectural drawings in London
In short

Who does the work: MCIAT-chartered technologists, a planning lead and an independent consulting structural engineer.

Who decides your application, and who should draw it?

Every set leaves this practice through a chartered member of CIAT, and the drawing and the technical check are done by different people. It matters because 97.0% of London planning decisions are made by a case officer under delegated powers rather than a committee, so the drawings are the argument.

London planning, three years to March 2026Figure
Decisions made by officers under delegated powers97.0%
Householder decisions made77,680
Householder applications approved83.0%
Applications withdrawn before decision7.4%
Appeals decided after refusal15,646
Appeals allowed39.0%
Enforcement notices issued3,554

Source: MHCLG District Planning Application Statistics (PS1 and PS2), the statutory return every English planning authority files, decisions made in the twelve quarters to March 2026, Open Government Licence v3.0, retrieved 1 September 2026. The withdrawal rate is the figure worth reading twice: an application withdrawn before determination is usually one the case officer signalled would fail.

How the practice is structured

MCIAT is the chartered grade awarded by the Chartered Institute of Architectural Technologists, which received its Royal Charter in 2005. The grade certifies competence in one specific discipline: resolving a building technically. In practice that covers the measured survey of what is already there, the drawn and written case put to a council under the Town and Country Planning Act 1990, the test of a scheme against Schedule 2 of the General Permitted Development Order 2015, and the construction information that has to satisfy the Building Regulations 2010 before anything is built.

Five people touch a typical instruction. The founder scopes it and establishes the planning route. A technologist carries out the measured survey and produces the drawings. The planning lead prepares and submits the application. The senior technologist produces the building regulations package. Where structure is altered, an independent consulting engineer produces the calculations.

Why does the split matter to the outcome?

Planning and building regulations are different statutory regimes with different tests, different determining bodies and different timescales — eight weeks for a £548 householder application under the Town and Country Planning Act 1990, five weeks for a Full Plans building regulations submission under the Building Regulations 2010. Treating them as one job is how schemes get planning permission that cannot then be built as drawn.

When each stage has a defined deliverable, it can be priced, rather than billed hourly against an open scope.

Coverage

All 33 London boroughs. Borough specialisms are real rather than nominal: the Article 4 regimes, conservation-area extents and basement policies differ materially between authorities, and the person leading your instruction is matched to the borough it sits in.

How this looks in a named London borough

How the team plays out in Merton: London Borough of Merton (Merton Council) maintains 28 conservation areas, the Wimbledon Village Conservation Area and the John Innes Conservation Area among them, and there is no borough-wide Article 4 direction, so permitted development generally survives outside conservation areas. Anyone dealing with the team at a Merton address is therefore working to a £548 householder application decided in 8 weeks, or a £249 prior approval over 6 weeks where the team still qualifies.

The team at a glance

Key figures for The team
Chartered gradeMCIAT, Chartered Institute of Architectural Technologists
CoverageAll 33 London boroughs
First-time approval rate98%
Planning route£548 householder, decided in 8 weeks
Building control routeFull Plans, decided in 5 weeks
Fixed fee range

Questions about this role

Is an architectural technologist as qualified as an architect?

They are different qualifications for different remits. “Architect” is protected under the Architects Act 1997 and requires ARB registration. MCIAT is the chartered grade for architectural technology — the technical design of buildings. For householder planning and building regulations work, the technologist's remit is the one that matches the task.

Who will I actually deal with?

One named lead for the whole instruction, matched to your borough. The survey, drawings, submission and building regulations package are produced within the practice; only the structural calculations come from an independent consultant.

Do you work outside London?

The practice covers all 33 London boroughs and the immediately adjoining Home Counties authorities.

An architectural technologist checking a printed set of house drawings, marking a proposed elevation in red — the team in London
Every set is checked line by line against the validation checklist before it leaves the office.
A printed planning application drawing set — proposed elevations, floor plans and the os location plan with the site outlined in red — the team in London
The planning set that goes to the council through the Planning Portal: proposed elevations, plans, and the OS location plan with your site outlined.

Found this useful? Share it

Copies the headline and the link, ready to paste anywhere — helpful if you are planning an extension with a neighbour, builder or architect.

Free quote in 60 seconds
Call us Free quote →

Before you go…

Get a free, no-obligation quote for your project. MCIAT chartered.

council-ready drawing review · All 33 London boroughs