‘Planning drawings’ is a specific, checkable deliverable, not a loose term for anything drawn to scale. This page sets out exactly which drawings a London council requires, at which scales, with which annotations — and what gets a set rejected at validation. Fixed fees from £840.
MCIAT chartered drawings for planning, building regs, lofts and extensions — fixed fees 30% below typical London architects. Tell us what you need and we’ll reply the same working day.
A compliant householder set for a London borough is seven drawings, and each one exists to answer a question the case officer is required to ask. Missing any of them is the difference between an eight-week decision and a validation email three weeks after you thought you had submitted.
Scale is not a stylistic choice. Councils publish required scales because officers measure off the drawings, and a set at an unstated or non-standard scale cannot be measured. Every sheet needs the same six pieces of information in the title block.
| Drawing | Required scale | Must also show |
|---|---|---|
| Site location plan | 1:1250 | Red line, blue line, north point, two named roads |
| Block plan | 1:500 or 1:200 | Boundaries, footprint, hardstanding, trees |
| Floor plans | 1:100 or 1:50 | Room names, dimensions, wall thicknesses |
| Elevations | 1:100 or 1:50 | Materials, adjoining buildings, ground level |
| Sections | 1:50 or 1:100 | Floor-to-ceiling heights, roof pitch, datum |
| All sheets | Stated on sheet | Scale bar, north point, drawing number, revision |
The scale bar matters more than the stated scale. A drawing issued at 1:100 on A1 and then printed to A3 by the council is no longer at 1:100, but a scale bar rescales with the sheet and stays true. Officers routinely reject sets that state a ratio without drawing a bar.
Drawing numbers and revision letters are the other quiet failure. When you amend a drawing during the eight weeks — and most applications amend at least once — the council needs to be able to identify which version the decision notice approves. An approved plans condition referencing an unnumbered drawing is unenforceable, and building control will later ask you to prove what was permitted.
Because the existing drawings are evidence, not decoration. The officer compares your existing elevation against the council’s own aerial photography, street-level imagery and planning history for the address. If your drawing shows a rear elevation that never existed — a common outcome when a set is traced from an estate agent’s floorplan — the whole submission loses credibility, and any permission granted on inaccurate plans is vulnerable.
A measured survey on a typical London terrace takes two to three hours with a laser distance meter. We record external dimensions and levels, internal room sizes and wall thicknesses, window and door positions and reveal depths, floor-to-ceiling heights on every storey, ridge and eaves heights, the roof pitch, and the position of any boundary, tree or outbuilding that will feature on the block plan.
The survey is also what makes the drawings reusable. The same accurate existing model carries forward into the building regulations set, into the structural engineer’s calculations, and into the party wall surveyor’s schedule of condition. Redrawing from scratch at each stage is where a fragmented appointment quietly costs more than a single fixed fee.
In our experience across the 33 boroughs, validation failures cluster into six causes, and five of the six are avoidable at zero cost by drawing the set correctly the first time.
None of these is a design judgement. They are administrative, and they are why a set that looks perfectly reasonable to the person who commissioned it can still sit unvalidated for a month.
Every project is issued as a full set of PDFs at the stated scale, sized for the sheet the council expect, plus the editable CAD source. You own both outright. There is no licence restriction on reusing the drawings with a different builder, engineer or approved inspector, and no charge for reissuing them later.
Files stay available in your client portal alongside the application reference, the correspondence, and the decision notice when it lands. That single archive is what your solicitor will ask for at sale, typically five or ten years later, when the question is whether the extension was built as approved.
Where the project proceeds to construction we issue the building regulations set from the same base model: general arrangement plans, construction sections, structural layouts coordinated with the engineer’s calculations, and the drainage and insulation detail the approver needs. Continuity between the two sets is the reason the combined Complete package at £1,750 is cheaper than commissioning each stage separately.
| Package | Fixed fee | Turnaround |
|---|---|---|
| Essentials — measured survey, existing and proposed plans | £840 | 14–20 working days |
| Loft conversion package — survey, plans, sections, elevations | £1,225 | 14–20 working days |
| Mansard / roof rebuild package | £1,575 | 18–24 working days |
| Complete — planning plus building regulations drawings | £1,750 | 20–28 working days |
The scaled set a local planning authority requires to decide an application: a 1:1250 site location plan, a 1:500 block plan, existing and proposed floor plans and elevations at 1:100 or 1:50, and a section where levels change. Each sheet needs a scale bar, north point, drawing number and revision.
Our Essentials package is £840 fixed and covers the measured survey plus the full existing and proposed set. A loft package is £1,225, a mansard package £1,575, and the Complete package covering both planning and building regulations drawings is £1,750. The council's application fee is separate — £258 for a householder scheme.
Yes. Councils compare your existing drawings against their own aerial and street imagery and planning history for the address. Drawings traced from an estate agent's floorplan routinely disagree with reality, which undermines the whole submission and makes any permission granted vulnerable.
There is no rule against it. The obstacles are practical: the location plan must come from a licensed Ordnance Survey supplier, every sheet needs a scale bar rather than just a stated ratio, elevations must include the neighbouring properties, and the borough's local validation list adds requirements beyond the national ones.
14 to 20 working days from instruction to submission, including the site survey and one round of revisions. Complex or multi-storey projects on the Complete package run to 20 to 28 working days.
Yes, outright, as PDFs and editable CAD files. There is no licence restriction on using them with a different builder, structural engineer or approved inspector, and we do not charge to reissue them years later for a sale.
Measured survey, full council-ready set, submitted in your name. Fixed fee confirmed the same working day you enquire.
Get a fixed-fee quoteBefore you commit, it is worth understanding our fixed-fee pricing and seeing what sets the practice apart. You can browse every service and area to find the right fit, or open a client account to track your project. When you are ready, get a quote today — most homeowners have a fee in minutes — or contact us about your project and a chartered technologist will be in touch.