Deep-dive · Planning Drawings

The complete Planning Drawings guide

Everything we know about planning drawings in London, in one place.

Fast facts

Service
Planning Drawings
Fixed fee from
£840
Typical duration
12–14 weeks
Approval rate
98% first time
Coverage
33 London boroughs + M25 belt
MCIAT chartered
Yes

What's covered

This page is the deep-dive index for Planning Drawings. Read it linearly or jump to the section you need.

1. Why people choose planning drawings

Three common drivers in London: family-growth space pressure, value uplift on Victorian/Edwardian stock, and rising rent making moving up the ladder uneconomic. Planning Drawings captures all three.

2. The planning route

For most London homes that aren't flats, listed or in conservation areas, planning drawings qualifies under Permitted Development. The planning permission drawings test: under volume threshold, materials match, eaves setback. Where Article 4 applies, the LDC route gives certainty before building. Where conservation rules apply, full planning is required.

3. Building regulations

Part L (thermal), Part B (fire), Part M (access), Part K (stairs/falls), Part E (acoustic), Part F (ventilation). Each governs a different aspect of the planning permission drawings. Sign-off via LABC or Approved Inspector.

4. Pricing in detail

Drawings: fixed fee from £840. Council fees: £103-£206. Building regs fees: £400-£900. Structural engineer: £800-£1,500. Party Wall surveyor (where applicable): £450-£1,500/neighbour. Build cost: separate quote from a contractor.

5. Common pitfalls

Wrong PD assumption (Article 4 area). Material non-match in conservation areas. Insufficient Heritage Statement detail on listed property. Missing Party Wall notice triggering legal injunction. We solve all of these as standard.