020 7864 7245 [email protected] WhatsApp
Detail drawings · 1:5 to 1:20

Architectural detail drawings that a builder can actually build from

A general arrangement plan says a wall is there. A detail drawing says what it is made of, where the insulation runs and what stops the cold bridge at the reveal. Six to twelve of them decide whether your extension gets built as designed or redesigned on site at your cost.

Get a quote Call 020 7864 7245

Chartered architectural technologist at work — architectural drawings in London
1:5
Scale for cills, trays and reveals
6–12
Details in a typical extension set
£1,750
Complete package, fixed fee

Which detail drawings does building control actually want to see?

Building control wants the junctions where structure, insulation and the weather line all change at once. A typical London extension needs six to twelve details at 1:5 to 1:20. The most commonly omitted is the cavity tray over an abutment — invisible once built, and the usual cause of damp appearing eighteen months later.

London householder work, 12 quarters to March 2026Figure
Householder decisions made77,680
Householder approval rate83.0%
Decisions delegated to officers, not committee97.0%
Decided under an agreed extension of time34.5%
Withdrawn before any determination7.4%
Householder appeals allowed after refusal40.8% of 13,067

Source: MHCLG District Planning Application Statistics (PS1 and PS2), decisions made in the twelve quarters 2023 Q2 to 2026 Q1, retrieved 1 September 2026. Open Government Licence v3.0.

What does an architectural detail drawing actually show?

It shows one junction, drawn large enough that every material layer through it is separately legible. Take the eaves of a loft conversion. On a 1:100 section it is a corner. On a 1:5 detail it is eleven distinct decisions: the rafter depth, the insulation between and below the rafters, the ventilation path from soffit to ridge, the wall plate and its strapping, the cavity closer, the fascia and soffit line, the gutter position, the eaves membrane lapping into the gutter, the sarking, the breather membrane and the point at which the ceiling line meets the wall.

Every one of those has to be resolved before anyone builds it. The only question is whether it gets resolved at a desk, where changing it costs nothing, or on scaffolding at nine in the morning with a bricklayer waiting.

This is the difference between a drawing that describes a building and a drawing that instructs one. Our building regulations drawings carry the detail layer; the planning application drawings deliberately do not, because a planning officer is not assessing your insulation line.

Which details does building control actually ask for?

There is no statutory list, which is why sets arrive incomplete. In practice a London building control body — whether that is the council or an approved inspector — wants to see the junctions where the thermal envelope, the structure and the weather line all change at once. Those are the places where buildings fail.

JunctionWhat it has to resolveRegulation in play
Foundation to ground floorDamp-proof course level, insulation continuity under the slab, radon or gas membrane where requiredParts A and C
EavesVentilation path, insulation depth, wall plate restraint, cold bridge at the wall headParts A, C and L
Window head, jamb and cillLintel bearing, cavity tray and stop ends, closer at the reveal, cill throatingParts A, C and L
Flat roof upstandMinimum 150 mm upstand, falls to outlet, membrane terminationParts C and H
New build to existing wallMovement joint or tie-in, cavity tray over the abutment, weathering of the flashingParts A and C
Party wall junctionFire stopping at the cavity, acoustic separation, structural independenceParts B and E

The junction most often missing from a set submitted by a homeowner is the cavity tray over an abutment. It is invisible once built, it is cheap to install and catastrophic to omit, and it is the single most common cause of a damp patch appearing on the inside face of a new extension eighteen months after completion.

What scale should each detail be drawn at?

Scale is not a presentation choice. It decides what can physically be shown. A 50 mm insulation board drawn at 1:20 is two and a half millimetres wide on the page — thinner than the line weight used to draw it, so it disappears.

ScaleUse it forSmallest thing that stays legible
1:5Cills, cavity trays, thresholds, revealsAround 5 mm — a DPC, a sealant bead
1:10Wall and roof build-ups, eaves, vergesAround 10 mm — a plasterboard layer
1:20Storey-height sections, stair detailsAround 20 mm — a batten
1:50General arrangement sectionsAround 50 mm — a stud

If you are handed a set where every detail is at the same scale, it was produced by someone drawing to fill a sheet rather than to answer a question.

Why do detail drawings get rejected?

Building control rejection is not the main risk. The main risk is a set that passes building control and then cannot be built as drawn, because the details contradict each other or contradict the structural design.

The classic version is an insulation line that is continuous on the wall detail and stops dead on the eaves detail, drawn by two different people a fortnight apart. The building is now designed with a cold bridge nobody chose. Under Part L that is a thermal bridging calculation the builder has to resolve on site, and the resolution is usually to lose 45 mm of head height in a room that had none spare.

The second version is a detail that assumes a beam size the structural engineer has not confirmed. A 203 × 133 universal beam and a 254 × 146 occupy different amounts of ceiling. If the detail is drawn against the first and the calculations arrive specifying the second, every dimension below it moves. Our structural engineering drawings and the detail set are produced against the same model, so this class of contradiction does not arise.

What do detail drawings cost in London?

Detail drawings are not sold separately here. They are part of the building regulations stage, and the building regulations stage is part of the Complete package.

PackageFixed feeIncludes detailsTurnaround
Essentials — measured survey, existing and proposed plansfrom £840No — planning stage only14–20 working days
Loft conversion packagefrom £1,225Yes14–20 working days
Mansard / roof rebuild packagefrom £1,575Yes18–24 working days
Complete — planning plus building regulationsfrom £1,750Yes20–28 working days

For context on what the drawings are buying you: across the 33 London boroughs, 77,680 householder decisions were made in the twelve quarters to March 2026, and 83.0% were approved. Of all 163,144 decisions in that window, 97.0% were delegated to officers rather than going to committee, and 34.5% were taken under an agreed extension of time rather than inside the statutory period.

Source: MHCLG District Planning Application Statistics (PS1 and PS2), decisions made in the twelve quarters 2023 Q2 to 2026 Q1, retrieved 1 September 2026. Open Government Licence v3.0.

That last figure is the one worth acting on. An extension of time is agreed, not imposed — a case officer asks for one when the submission is nearly right but short of something. A complete set of details at the building regulations stage does not stop a planning extension of time, but it removes the equivalent delay downstream, where an incomplete set means the build stops rather than the paperwork.

What does a detail point at without drawing it?

A good detail is partly a set of references, and knowing what to leave out is as much of the skill as knowing what to draw. Nobody redraws a cavity tray, a proprietary lintel or a fixing pattern that a manufacturer has already tested and published; the detail names the product and the document, and the specification carries the rest. Redrawing it invents a component that has no test evidence behind it, and a plans checker will treat it as exactly that.

So a detail typically references a manufacturer’s installation instruction, a product certificate, the structural engineer’s member sizes, and where relevant a published standard construction detail for the junction. What it must still draw itself is the part nobody else can know: how those components meet this building, at this junction, with the existing fabric that is actually there. That is the drawing you are paying for.

Detail drawing questions

What is an architectural detail drawing?

A large-scale drawing of one junction in a building, normally at 1:5, 1:10 or 1:20, showing every material layer through that junction and how they meet. A general arrangement plan says a wall is there; the detail says what the wall is made of, where the insulation runs, how the damp-proof course laps the membrane and what stops the cold bridge at the reveal.

How many details does a building regulations application need?

For a typical London extension or loft conversion, between six and twelve. The set almost always includes the foundation and ground floor junction, the eaves, the verge or parapet, a window head, jamb and cill, the ridge, and the junction between the new structure and the existing wall. More are needed where the roof is flat, where a party wall is involved or where the build-up changes partway along.

What scale should a construction detail be drawn at?

1:5 for anything where individual material thicknesses have to be legible, such as a window cill or a cavity tray. 1:10 for most wall and roof build-ups. 1:20 for sections through a whole storey where the point is the relationship between elements rather than the exact make-up of each one.

Do I need detail drawings for planning permission?

No. Planning is judged on what the building looks like and how it affects neighbours, so the planning set is plans, elevations and sections. Details belong to the building regulations stage, which is a separate application to building control and is where the construction is actually approved.

Can my builder work from planning drawings alone?

Not safely, and most will not price accurately from them. Planning drawings carry no build-up information, so every junction becomes a decision made on site by whoever is standing there. That is where cost overruns and building control rejections come from.

What does a set of detail drawings cost?

Our detail drawings are part of the Complete package at a fixed £1,750, which covers both the planning and the building regulations set. We do not bill hourly, so a junction that needs redrawing three times costs the same as one that does not.

Last updated: 2 September 2026 · Written by the Architectural Drawings London technical team, chartered members of the Chartered Institute of Architectural Technologists (MCIAT). · About our team

Get your detail drawings resolved before the builder prices the job

Site plans are included in every drawing package we produce, on a licensed Ordnance Survey base with the ownership edging done properly.

Get a quote
A printed planning application drawing set — proposed elevations, floor plans and the os location plan with the site outlined in red — site plan drawings for london planning applications in London
The planning set that goes to the council through the Planning Portal: proposed elevations, plans, and the OS location plan with your site outlined.
Further reading

Guides & next steps

Before you commit, it is worth understanding what it costs and seeing why homeowners choose us. You can search the site to find the right fit, or open a client account to track your project. When you are ready, get a quote today — most homeowners have a fee in minutes — or contact us about your project and a chartered technologist will be in touch.

Found this useful? Share it

Copies the headline and the link, ready to paste anywhere — helpful if you are planning an extension with a neighbour, builder or architect.

Site plan drawings for London planning applications in London — a measured survey being recorded on site
A measured survey being recorded on site — site plan drawings for london planning applications in London.

Architectural drawings by London area

Each area page carries the local planning authority, conservation-area position, postcode districts and typical housing stock for that address.

Free quote in 60 seconds
Call us Free quote →

Before you go…

Get a free, no-obligation quote for your project. MCIAT chartered.

council-ready drawing review · All 33 London boroughs