Two separate approvals

Planning permission vs building regulations: what is the difference?

Planning permission controls what a building looks like and how it affects its surroundings. Building regulations control whether it is safe, warm and properly built. They are separate approvals, assessed by different teams against different rules, and most projects need both.

Last checked against current guidance on 2026-08-09. Rules differ by borough — the local pages below say how.

Victorian terraced street in London — building regulations

What does planning permission actually test?

Land use and external impact: scale, appearance, overlooking, daylight, parking, trees and the character of the area.

Planning is decided by your local planning authority against its local plan and national policy. It is a judgement about acceptability, which is why two identical extensions can get different answers in different boroughs.

It says nothing about whether the building will stand up.

What do building regulations test?

Technical performance: structure, fire safety, insulation, ventilation, drainage, stairs, glazing, electrics and access.

Building control is administered either by the local authority's building control team or by a registered building control approver. The assessment is against the Approved Documents:

PartCoversTypical extension issue
AStructureSteel beam sizing over a knocked-through opening
BFire safetyEscape from a loft room; protected stairway
FVentilationBackground and extract ventilation in new rooms
HDrainageBuilding over or near a public sewer
KProtection from fallingStair pitch, headroom and guarding
LConservation of fuel and powerU-values for new walls, roof and glazing
MAccessLevel threshold and door widths

It says nothing about whether the extension is appropriate for the street.

Do I always need both?

Most structural work needs building regulations approval; only some work needs planning permission.

ProjectPlanningBuilding regulations
3m rear extension within permitted developmentNot usually — a lawful development certificate is advisableYes
6m rear extensionPrior approvalYes
Rear dormer loft conversion within volume limitsNot usuallyYes
Mansard roofUsually full planningYes
Internal wall removalNoYes
Garage conversion (no external change)Not usuallyYes
New window in a flank wallSometimesYes

Which packages does your project need?

Build cost moves with your builder, your specification and the month you tender. What you can pin down early is the design and compliance scope — how many drawing sets the council and building control will want, and whether structural input is in play. The estimator below works that out from the project type and floor area.

Estimate your drawing costs

Move the controls for an indicative figure. It anchors your budget — it is not a quote. Every project is priced after a free survey.

1 · Project type
2 · Approximate size
30
3 · Add compliance packages
Indicative design fee £1,585
Book your free feasibility call

Build costs are separate and quoted by your contractor. See our published fees.

A building regulations drawing pack open on a desk — a construction section sheet and its specification schedule — planning permission vs building regulations: what is the difference in London
The building regulations pack: construction sections and the specification building control signs the work off against.

Which comes first?

Resolve planning first where there is any planning risk, because a planning change redesigns the technical package but not the other way round.

The exception is a scheme that is clearly permitted development and clearly uncontentious, where the two can run together and save several weeks.

Note that a building control application can be made under a building notice or as a full plans application. Full plans gets you a checked design before work starts, which on anything structural is the safer route.

What happens if you skip one?

  • No planning permission: the council can serve an enforcement notice requiring the work to be altered or removed. Time limits for enforcement apply, but relying on them is not a plan.
  • No building regulations approval: there is no completion certificate. That surfaces at sale, and regularisation after the fact means opening up finished work so it can be inspected.

Both problems are cheap to avoid and expensive to fix, which is the whole argument for getting the drawings right at the start.

Written by Benyamen Shaukat, Technical Architect & Platform Founder. Fact-checked against the Building Regulations 2010 (as amended) and the Town and Country Planning Act 1990.

Common questions

Can I get planning permission but fail building regulations?

Yes, and it happens. They are separate assessments. A design can be perfectly acceptable in planning terms and still need changes to meet Part L or Part B.

Who issues the completion certificate?

The body that carried out the building control function — either the local authority or the registered building control approver you appointed.

Is a structural engineer required?

Wherever loads change: removing a wall, forming an opening, adding a dormer or building a new roof. Building control will expect calculations.

Does listed building consent replace planning permission?

No, it is an additional consent. Works to a listed building can need listed building consent, planning permission and building regulations approval.

How long is planning permission valid?

Three years from the date of the decision for most permissions, within which the development must be begun.

Planning permission vs building regulations: what is the difference? in London — a steel beam installed over a structural opening
A steel beam installed over a structural opening — planning permission vs building regulations: what is the difference? in London.

Where to go next

Two regimes, two sets of law

Planning permission and building control are separate consents under separate statutes, decided by different people against different tests. One asks whether the building should exist in that form and place; the other asks whether it is safe once built. A scheme can pass either and fail the other: