Planning guide · City of London

Conservation area planning in City of London

City of London has 27 conservation areas. What changes inside them, how Heritage Statements work, and which alterations still qualify.

Quick answer

Borough
City of London
Planning authority
City of London Corporation
Article 4 in force
Yes
Conservation areas
27
Statutory determination
8 weeks
Our approval rate
98% first time
In detail

Answers for City of London

How many conservation areas does City of London have?

City of London has 27 designated conservation areas, including Barbican, Smithfield, Fleet Street, Whitefriars, St Paul's.

What changes need planning in a City of London conservation area?

Any external alteration visible from a public space typically requires full planning permission inside a conservation area: roof additions, dormers, replacement windows, rendering, hardstanding, and demolition. Internal works generally do not, unless the property is also listed.

Do I need a Heritage Statement in City of London?

Yes — every application inside a conservation area requires a Heritage Statement. It must address the conservation area character appraisal, identify heritage assets, and explain how the design preserves or enhances character. We prepare this as part of every conservation-area application.

Can I have a roof extension or mansard in a City of London conservation area?

Rear mansards and dormers are routinely approved in many London conservation areas where the design matches the terrace's existing roofscape — particularly in Hackney, Islington, Tower Hamlets, Lambeth and Southwark. Front-facing dormers are almost universally refused.

How long does conservation area approval take in City of London?

City of London Corporation statutory determination is 8 weeks for householder applications. Conservation officer consultation adds 2–3 weeks in practice. Expect 11–14 weeks from validation to decision.

Related guides for City of London

Need help in City of London?

Same-day fixed quote. MCIAT chartered. 98% first-time approval rate.

Start free quote