Brent homes sold at a median of £550,000 during 2025, 1.8% below the 2024 median, across 2,057 registered transactions (HM Land Registry Price Paid). Inside the borough's conservation areas — Queen's Park, Mapesbury, Sudbury Court and Barn Hill among the largest — a good part of that value sits in exactly what the designation protects, which is why what you may alter narrows and why the drawings have to argue the case rather than simply describe it.
The national register records 23 conservation areas in Brent covering about 350 hectares. Queens Park is the largest at 54.6 hectares, Mapesbury next at 47.9, and Kensal Rise the newest, designated on 27 May 2024. Inside all of them Article 2(3) removes permitted development for side extensions, cladding and roof enlargement.
| Conservation area | Designated | Hectares |
|---|---|---|
| Queens Park | 30 June 1986 | 54.6 |
| Mapesbury | 21 December 1982 | 47.9 |
| Sudbury Court | 1 January 1990 | 44.1 |
| Barn Hill | 1 March 1990 | 40.2 |
| Mount Stewart | 31 March 1993 | 21.3 |
| Northwick Circle | 31 March 1989 | 20.9 |
| Roe Green Village | 31 October 1968 | 9.9 — Brent’s first |
| Kensal Rise | 27 May 2024 | 8.6 — Brent’s newest |
Source: planning.data.gov.uk conservation-area dataset joined to the organisation register, retrieved 1 September 2026. Hectares are computed from the published boundaries and are accurate to about 1%; one of the 23 (Sudbury Cottages) carries no designation date in the register, which is why some Brent counts published elsewhere say 22. Permitted development consequences are Article 2(3) and Schedule 2, Part 1 of the General Permitted Development Order 2015.
The map below is not a sketch. Every outline on it is a boundary held in the national planning register, and the postcode box searches those outlines inside your own browser, so the address never leaves the page. Read the last few metres of any line with caution: the shapes are simplified so they draw quickly, which makes them reliable for telling you which area you are in and useless for settling a plot that appears to sit on the edge of one.
Brent’s designated land runs to roughly 349.6 hectares, and it sits at the two ends of the range rather than in the middle — Queens Park is the largest single area at 54.6 hectares, while Sudbury Cottages covers 0.4. Designations here span more than half a century, the oldest made on 31 October 1968 and the newest on 27 May 2024, so an area protected before most of the borough’s current housing stock changed hands sits on the same map as one designated this decade. The layer that catches householders out, though, is the other one. Brent has published 158 separate Article 4 areas to the register, several times the number of conservation areas, and an Article 4 direction withdraws permitted development rights on its own terms — a Brent address can fall inside one while sitting outside every conservation area on the map, and still need a full application for work a neighbouring borough would wave through.
Boundaries: the conservation-area and article-4-direction-area datasets at planning.data.gov.uk, retrieved 15 August 2026 and re-checked 1 September 2026. Contains public sector information licensed under the Open Government Licence v3.0
In detailBrent has 22 designated conservation areas, including Queen's Park, Mapesbury, Kensal Green, Harlesden, Sudbury Court.
Any external alteration visible from a public space typically requires full planning permission inside a conservation area: roof additions, dormers, replacement windows, rendering, hardstanding, and demolition. Internal works generally do not, unless the property is also listed.
Yes. A Brent conservation area application needs a Heritage Statement, and a thin one is a common reason for a submission stalling at validation. It has to engage with whichever character appraisal Brent has published for the area in question, identify which heritage assets are affected, and set out in plain terms how the proposal preserves or enhances whatever the appraisal says matters there. We write it as part of the submission rather than bolting it on afterwards.
Rear mansards and rear dormers are approved regularly in London conservation areas where the roof form already runs along the terrace and the new one matches it on pitch, materials and setback. Front-facing dormers are refused almost without exception. Brent's own record is not indulgent here: the council turned down 612 of 2,843 householder decisions, 21.5% (MHCLG PS1, to March 2026), and inspectors allowed 475 of the 1,428 appeals decided from this borough, 33.3% (Planning Inspectorate casework, OGL v3.0).
Brent's statutory determination window is 8 weeks for a householder application, and the council generally meets it: 1,955 of 2,073 measured decisions came back inside the period, 94.3% (MHCLG PS2). Conservation area work is the exception. The conservation officer's consultation adds two to three weeks in practice, so plan on 11 to 14 weeks from validation to decision. Listed building consent runs on a separate track and is a thin one in Brent — the borough decided just 11 alteration or extension cases across the whole three years, far too few to put a percentage on.



Pick a slot that suits you. No obligation and no sales pressure, just straight answers on your planning route.
Brent district by district: the postcodes we draw in, what stands in each of them, and which authority takes a conservation area application at that address. The charges shown are the 2026 statutory England fees, not an estimate of what a conservation-area scheme costs.
| Postcode | Area | Dominant stock | What it means for a conservation area application |
|---|---|---|---|
| NW2 | Cricklewood / Neasden | Edwardian villas and terraces | NW2 straddles a boundary: Cricklewood / Neasden addresses fall to Brent Council or Barnet Council or Camden Council, so confirm which authority validates the conservation area application before submitting NW2 drawings. |
| NW10 | Willesden / Harlesden / Kensal Green | Modern apartments, post-war estates | NW10 crosses an authority boundary: Willesden, Harlesden and Kensal Green addresses fall to Brent Council or to Ealing Council depending on the street, so establish which one validates before NW10 conservation area drawings go in. |
| HA0 | Wembley / Sudbury | 1930s semi-detached, new-build | HA0, covering Wembley and Sudbury, is entirely Brent Council territory, and the Local Plan policies written for those areas govern the outcome. |
| HA9 | Wembley / Wembley Park | 1930s semi-detached, new-build | An HA9 address in Wembley or Wembley Park is decided by Brent Council alone, under the Local Plan policies it applies to that part of the borough. |
| NW6 | Kilburn / West Hampstead / Queen's Park | Mansion blocks, post-war flats | Kilburn / West Hampstead / Queen's Park is split at NW6. Either Camden Council or Brent Council can determine a conservation area application here, so the NW6 address is checked against both policies maps first. |
| NW9 | Colindale / Kingsbury | Post-war flats, new-build | NW9 is split as well. Colindale and Kingsbury addresses sit with Barnet Council or with Brent Council according to the street, so the validating authority needs confirming before an NW9 application is lodged. |
Roof form, wall build-up and plot depth shift from one Brent street to the next, and inside a conservation area each of those variations is also part of the evidence a case officer weighs.
Brent conservation designations: these were not designated as a set and do not behave as one. The oldest is Roe Green Village, protected on 31 October 1968; the newest is Kensal Rise, added on 27 May 2024 — a fifty-six year span, over which what designation was meant to achieve changed considerably. They differ as much in size: Queens Park covers 54.6 hectares, while Sudbury Cottages covers 0.4, and a rule written for a whole Edwardian suburb reads very differently when it is applied to a single terrace of cottages. Twenty-three are recorded for Brent in the national dataset. What designation costs is the same in each: the permitted development route closes, so work that would have gone through prior approval at £249 in six weeks needs a £548 householder application with eight weeks to decide. Harlesden is the designation that most often changes a scheme here.
Brent and Article 4: Article 4 for HMO conversions in specific streets around Wembley and Harlesden. A conservation area application planned at a NW2 address is checked against that direction first; Brent Council publishes the Brent extent, and the NW2 line rarely follows the Brent boundary you would expect.
What Brent is built from: Edwardian villas in Queen's Park and Mapesbury; Victorian terraces in Kilburn and Harlesden; 1930s semi-detached in Wembley; post-war tower blocks in Church End. Highly diverse borough; Queen's Park and Mapesbury are heritage-controlled; Wembley is a major regeneration hub. That mix decides the conservation area application route in Brent more than the postcode does.
Sources for this Brent conservation area application page: borough policies maps and conservation-area registers (2025–26), Royal Mail postcode district boundaries, the Town and Country Planning (Fees for Applications) (England) Regulations, the Town and Country Planning (General Permitted Development) (England) Order 2015 as amended, and the Party Wall etc. Act 1996.

Same-day fixed quote. MCIAT chartered. 98% first-time approval rate.
Start free quoteOr contact us about your project first