Uxbridge / Cowley — covered by Hillingdon Council.
Planning permission drawings delivered by an MCIAT chartered team.
Building regulations drawings delivered by an MCIAT chartered team.
Loft conversion drawings delivered by an MCIAT chartered team.
House extension drawings delivered by an MCIAT chartered team.
Mansard roof extensions delivered by an MCIAT chartered team.
Garage conversion drawings delivered by an MCIAT chartered team.
Basement conversion drawings delivered by an MCIAT chartered team.
Structural calculations delivered by an MCIAT chartered team.
Measured building survey delivered by an MCIAT chartered team.
Party wall services delivered by an MCIAT chartered team.
Rear dormer drawings delivered by an MCIAT chartered team.


UB8 primarily covers Uxbridge / Cowley in Hillingdon.
Decisions for UB8 are made by Hillingdon Council. Standard Permitted Development rules apply for most rear extensions and loft conversions on terraced and semi-detached houses, unless the property is in a conservation area, is listed, or sits under an Article 4 Direction. Article 4 in Hillingdon: No.
Building regs from £950. We do not charge hourly. Free site survey across all UB8 addresses.
From first call to planning decision: typically 12–14 weeks. Site survey week 1, design weeks 2–3, validation 1–2 weeks, statutory 8-week determination. Hillingdon Council timelines align with the national norm.
Uxbridge / Cowley in UB8 is characterised by the housing stock of Hillingdon — broadly 1930s semi-detached dominates.

Pick a slot that suits you. No obligation and no sales pressure, just straight answers on your planning route.
Every UB8 postcode district we draw in, the stock that dominates it and the authority that validates a drawing package there. UB8 fees below are the statutory England rates for 2026, not drawing package estimates.
| Postcode | Area | Dominant stock | What it means for a drawing package |
|---|---|---|---|
| UB8 | Uxbridge / Cowley | Georgian fragments, 1930s semi-detached, post-war flats | UB8 covers Uxbridge / Cowley only; Hillingdon Council handles the drawing package. |
| UB8 | Uxbridge | Georgian fragments, 1930s semi-detached, post-war flats | Uxbridge sits inside UB8; drawing package proposals here are determined by Hillingdon Council. |
| HA4 | Ruislip | 1930s semi-detached, Tudor cottages | Adjoining district to UB8, also inside Hillingdon for drawing package purposes. |
| HA5 | Pinner / Eastcote | Tudor fragments, Edwardian villas, 1930s semi-detached | Adjoining district to UB8, also inside Hillingdon for drawing package purposes. |
| HA6 | Northwood | 1930s detached, Edwardian villas | Adjoining district to UB8, also inside Hillingdon for drawing package purposes. |
| UB3 | Hayes / Harlington | 1930s semi-detached, post-war estates | Adjoining district to UB8, also inside Hillingdon for drawing package purposes. |
Roof pitch, wall build-up and plot depth change every few UB8 streets, and each one changes what a drawing package can achieve at that address.
UB8 (Uxbridge / Cowley) conservation designations: there are 29 across Hillingdon Council, Uxbridge, Ruislip Village, Northwood among them. Designation costs a UB8 (Uxbridge / Cowley) owner the permitted-development route: a drawing package then needs a £548 householder application over 8 weeks, in place of the £249 prior approval route that takes 6 weeks. Harefield is the UB8 (Uxbridge / Cowley) designation that most often changes a drawing package design.
Article 4 and your UB8 (Uxbridge / Cowley) drawing package: Hillingdon Council has made no borough-wide direction, so permitted development for a drawing package in UB8 (Uxbridge / Cowley) generally survives outside UB8 (Uxbridge / Cowley) conservation areas and listed curtilages. A Lawful Development Certificate at £274 is how a UB8 owner records that a drawing package was lawful.
UB8 (Uxbridge / Cowley) housing stock: 1930s semi-detached dominates; Metropolitan Green Belt covers much of north Hillingdon; Victorian cottages in Uxbridge and Ruislip villages; post-war housing near Heathrow. Largest outer west London borough; significant Green Belt; Heathrow noise contours affect planning decisions in Harmondsworth and Sipson. Read that before choosing a drawing package route in UB8 (Uxbridge / Cowley) — construction, not postcode, sets what is achievable. Hillingdon Council charges £548 for a householder application and has 8 weeks to determine it.
Sources for this UB8 drawing package page: borough policies maps and conservation-area registers (2025–26), Royal Mail postcode district boundaries, the Town and Country Planning (Fees for Applications) (England) Regulations, the Town and Country Planning (General Permitted Development) (England) Order 2015 as amended, and the Party Wall etc. Act 1996.
Same-day fixed quote. MCIAT chartered. No hourly creep.
Start free quoteOr contact us about your project first
You can browse every service and area to find the right fit, or set up your account to track your project. When you are ready, get a quote for your project — most homeowners have a fee in minutes — or contact us and a chartered technologist will be in touch.