‘House plans’ means four different things depending on who is asking. A sketch for a conversation, a scaled set for the council, a construction set for the builder, and a record set for the solicitor at sale. This guide sets out what each contains, what each costs, and which one you need.
MCIAT chartered drawings for planning, building regs, lofts and extensions — fixed fees 30% below typical London architects. Tell us what you need and we’ll reply the same working day.
Almost every disagreement about the price of house plans comes from two people meaning different stages. The four are sequential, each builds on the one before, and each has a different audience.
A compliant householder set is seven drawings. Each answers a question the case officer is required to ask, and the scales are prescribed because officers measure off them.
| Drawing | Scale | Purpose |
|---|---|---|
| Site location plan | 1:1250 | Places the site; red line ownership, two named roads |
| Block plan | 1:500 or 1:200 | Proposal within the boundary; trees and hardstanding |
| Existing floor plans | 1:100 or 1:50 | The building as surveyed, room by room |
| Proposed floor plans | 1:100 or 1:50 | The building as altered, with uses labelled |
| Existing elevations | 1:100 or 1:50 | All affected faces, with neighbours shown |
| Proposed elevations | 1:100 or 1:50 | Materials annotated, ridge and eaves as levels |
| Section | 1:50 or 1:100 | Heights, roof pitch, relationship to ground level |
Every sheet needs a stated scale and a drawn scale bar, a north point on plans, a drawing number and a revision letter. The scale bar matters more than the ratio: a drawing issued at 1:100 on A1 and printed to A3 by the council is no longer at 1:100, but a bar rescales with the sheet and stays true.
Beyond the drawings, most councils publish a local validation list adding requirements to the national ones — a Design and Access Statement, a Heritage Statement where the property is designated, a Community Infrastructure Levy form, an arboricultural report where protected trees are within influencing distance.
Planning plans describe what the building will look like and how it affects neighbours. Building regulations plans describe how it is put together and whether it is safe. They are separate consents with separate submissions, and work built under permitted development with no planning application at all still needs building control approval.
Anyone. There is no statutory restriction on who may prepare drawings or submit a planning application — you can draw and submit your own. What is protected is the title ‘architect’, which under the Architects Act 1997 may only be used by someone on the Architects Registration Board register.
In practice, three groups do the work. Registered architects, regulated by the ARB and often members of RIBA, whose training is weighted toward design. Chartered architectural technologists, chartered through CIAT, whose training is weighted toward technical design, construction detail and building regulations. And unregulated draughting services, which vary enormously and are the reason the professional indemnity question matters.
For a typical domestic project — an extension, a loft conversion, a remodel — the difficulty is technical and regulatory rather than aesthetic, which is why a chartered technologist is usually the better fit and roughly 30% cheaper. For a listed building or a scheme where the design outcome is itself the deliverable, a registered architect earns the premium.
| Package | Fixed fee | Turnaround |
|---|---|---|
| Essentials — measured survey, existing and proposed plans | £840 | 14–20 working days |
| Loft conversion package — survey, plans, sections, elevations | £1,225 | 14–20 working days |
| Mansard / roof rebuild package | £1,575 | 18–24 working days |
| Complete — planning plus building regulations drawings | £1,750 | 20–28 working days |
Those are fixed fees against a defined scope, including the measured survey, the drawing set, the submission and the case management. The alternatives price differently: a registered architect on percentage terms typically charges 2% to 4% of build cost for the planning stage and 6% to 12% for full services, and hourly rates in London run £70 to £150.
Separate from the drawings are the statutory costs, which are national and identical wherever you are in England.
| Application type | Statutory fee | Determination |
|---|---|---|
| Householder application (extension, loft, dormer) | £258 | 8 weeks |
| Full application — new dwellinghouse | £578 | 8 weeks |
| Lawful Development Certificate (proposed) | £129 | 8 weeks |
| Listed building consent | No fee | 8 weeks |
| Prior approval — larger rear extension | £120 | 6 weeks |
The cheapest house plans on the market — typically £300 to £600 online — are cheap because they exclude the measured survey and the council case management. Both are avoidable costs right up until they are not: a set drawn without a survey disagrees with the building, and an unanswered officer query becomes a refusal.
The scaled drawings describing a house and any proposed change to it. They come in four stages: concept sketches, planning plans for the council, building regulations plans for building control, and construction plans for the builder. Each has a different audience and a different level of detail.
Floor plans and elevations at 1:100 or 1:50, sections at 1:50 or 1:100, the site location plan at 1:1250 and the block plan at 1:500 or 1:200. Every sheet needs a drawn scale bar as well as a stated ratio, because a resized print invalidates the ratio but not the bar.
Our fixed fees are £840 for planning drawings, £1,225 for a loft package, £1,575 for a mansard and £1,750 for planning plus building regulations. An architect on percentage terms typically charges 2% to 4% of build cost for the planning stage alone.
No. There is no statutory restriction on who may prepare drawings or submit a planning application — only the title 'architect' is protected, under the Architects Act 1997. Most UK domestic work is drawn by chartered architectural technologists.
No. Planning plans describe appearance and impact; building regulations plans describe construction — build-ups, U-values, structure, drainage and fire strategy. You need both, which is why we produce them together from one survey in the £1,750 Complete package.
14 to 20 working days from instruction for the planning set, including the measured survey and one revision round, or 20 to 28 working days for planning and building regulations together.
Yes — you receive PDFs and editable CAD files outright, with no licence restriction on using them with a different builder, structural engineer or building control approver, and no charge for reissuing them years later.
Measured survey, full drawing set, submitted in your name. Fixed fee confirmed the same working day you enquire.
Get a fixed-fee quoteBefore you commit, it is worth understanding fixed fees, 30% below London architects and seeing why work with us. You can find your service to find the right fit, or create a free account to track your project. When you are ready, get a quote in minutes — most homeowners have a fee in minutes — or contact us for a chat and a chartered technologist will be in touch.