A builder cannot price a planning drawing. Planning plans describe appearance; a construction set describes what gets built, in what order, out of what. The gap between the two is where variations, disputes and blown budgets live.

Get a fixed-fee quote Call 020 7864 7245
Free fixed-fee quote

Tell us about your project

MCIAT chartered drawings for planning, building regs, lofts and extensions — fixed fees 30% below typical London architects. Tell us what you need and we’ll reply the same working day.

  • MCIAT chartered
  • Same working-day reply
  • Fixed fees from £840

Why can a builder not price from planning drawings?

Because planning drawings deliberately leave out almost everything that costs money. A proposed elevation shows a window opening and annotates the material; it does not say what the lintel is, how the cavity is closed, what the U-value target is, or where the DPC tray sits. A proposed plan shows a wall; it does not say whether it is load-bearing, what it is built of, or what supports it once an opening is formed.

Handed a planning set, a builder does one of two things. The careful ones price high to cover the unknowns. The rest price low and recover the difference through variations once work has started, when you have no competitive leverage at all. Neither outcome is the builder’s fault — it is a consequence of pricing a drawing that was never meant to be priced.

£840
Construction set from
3–5
Comparable tender returns
14–28
Working days to issue

What does a detailed construction set contain?

  • Dimensioned setting-out plans — every wall positioned from a fixed datum, so the builder is not scaling off a drawing to find where a partition goes.
  • Construction sections — each floor, wall and roof build-up layer by layer with insulation thicknesses, membranes, cavity closers and U-values.
  • Junction details at 1:5 or 1:10 — eaves, verge, threshold, cill, lintel, ridge, and the junction between new and existing construction where cold bridging concentrates.
  • Structural layouts — every beam and lintel identified and cross-referenced to the engineer’s calculation sheet, with padstone sizes and bearing lengths shown.
  • Drainage layout — falls, invert levels, connections and any build-over agreement position.
  • Electrical and services layout — socket, switch and light positions agreed on paper rather than decided by a spark on a Tuesday.
  • Written specification — the materials and workmanship standards each trade is pricing against, which is what makes three tenders genuinely comparable.

On domestic work the construction set and the building regulations set overlap heavily, which is why we produce them together. The approver needs the same sections, structure and specification the builder needs, and drawing them once for both purposes is the efficient route.

How do detailed plans change what you pay a builder?

They make competition possible. Three builders pricing the same complete set are answering the same question, so the returns are comparable and the differences are real. Three builders pricing a planning drawing are each pricing a different project, and the cheapest is usually the one who has assumed the least.

The second effect is on variations. Every decision made on a drawing is a decision not made on site, and site decisions are the expensive kind — agreed under time pressure, without alternatives, by someone whose incentive is to keep going. A detailed set moves those decisions into a phase where you can compare options and change your mind for nothing.

The third is evidence. When something is built differently from the drawing, a dimensioned, revision-controlled set establishes what was agreed. Without it, the argument is one person’s recollection against another’s.

PackageFixed feeTurnaround
Essentials — measured survey, existing and proposed plans£84014–20 working days
Loft conversion package — survey, plans, sections, elevations£1,22514–20 working days
Mansard / roof rebuild package£1,57518–24 working days
Complete — planning plus building regulations drawings£1,75020–28 working days

Construction drawing questions

What are detailed plans?

The construction or working drawing set a builder prices and builds from: dimensioned setting-out, construction sections with U-values, 1:5 and 1:10 junction details, structural layouts cross-referenced to the engineer's calculations, drainage, services layouts and a written specification.

Can my builder work from planning drawings?

Not reliably. Planning drawings describe appearance and impact and deliberately omit construction detail. A builder pricing from them either loads the price to cover the unknowns or recovers the difference through variations after work has started.

Are construction drawings the same as building regulations drawings?

On domestic work they overlap heavily — the approver needs the same sections, structure and specification the builder needs. We produce them together for that reason, so you are not paying twice for the same information.

Will detailed plans save me money?

Usually, in two ways. Three builders pricing the same complete set return genuinely comparable tenders, and every decision fixed on a drawing is a decision not made under time pressure on site, where changing your mind is expensive.

How long does a construction set take?

14 to 20 working days where approved planning drawings and a survey already exist, or 20 to 28 working days for the Complete package producing the planning and construction stages together from one measured survey.

Last updated: 28 July 2026 · Written by the Architectural Drawings London technical team, chartered members of the Chartered Institute of Architectural Technologists (MCIAT). · About our team

Get a set your builder can actually price

Send your approved planning drawings or start from scratch. Fixed fee back the same working day.

Get a fixed-fee quote
Further reading

Guides & next steps

Before you commit, it is worth understanding fixed fees, 30% below London architects and seeing why work with us. You can find your service to find the right fit, or create a free account to track your project. When you are ready, get a quote in minutes — most homeowners have a fee in minutes — or contact us for a chat and a chartered technologist will be in touch.