Cost FAQ

What's not included in a drawing quote?

Council fees (£103-£206). Building regs fees (£400-£900). Structural engineer (£800-£1,500). Surveyor (Party Wall, optional).

Victorian terraced street in London — architectural drawings in London
Short answer

It does not include statutory fees, £548 planning, £500 to £1,200 building control, or specialist reports required by the borough's validation list.

What is included?

Revisions arising from officer feedback during the application are included. That matters more than it sounds: a negotiated amendment is what turns a likely refusal into an approval.

What is charged separately?

Statutory application fees, which go to the council. Building control charges, which go to the authority or approver. And specialist reports — heritage, daylight and sunlight, arboricultural, flood risk, acoustic — where the local validation list requires them.

What is never included by anyone?

The build cost, the kitchen, the fit-out, and any works arising from something discovered on site — asbestos, unexpected drainage, a foundation shallower than assumed. A measured survey to ±3 mm reduces that last category considerably but cannot eliminate it.

A percentage of build cost gives the designer an interest in a larger build. Ours are set against a defined scope so the number on the quote is the number on the invoice — around 30% below typical London architect rates for the same drawing package.

What does this mean for a London project?

plays out in Tower Hamlets: London Borough of Tower Hamlets (Tower Hamlets Council) maintains 58 conservation areas, the Spitalfields Conservation Area and the Whitechapel Market Conservation Area among them, and an Article 4 direction is in force there, so permitted development cannot be assumed. at a Tower Hamlets address is therefore working to a £548 householder application decided in 8 weeks. still qualifies. are the Town and Country Planning Act 1990, the GPDO 2015 and the Building Regulations 2010.

Key figures

Key figures for What's not included in a drawing quote?
Essentials package
Loft package
Mansard package
Complete package
Not included: planning fee£548
Not included: building control£500–£1,200

Related questions

Are officer-requested revisions extra?

No. Amendments during the application are included.

Do you charge a percentage of build cost?

No.

Is the structural engineer included?
An architectural technologist checking a printed set of house drawings, marking a proposed elevation in red — what's not included in a drawing quote
Every set is checked line by line against the validation checklist before it leaves the office.
Book a call

Speak to a chartered technologist — free 15 minutes

Pick a slot that suits you. No obligation and no sales pressure, just straight answers on your planning route.

What's not included in a drawing quote? — the exterior of London house before works
The exterior of a london house before works — what's not included in a drawing quote?.

Found this useful? Share it

Copies the headline and the link, ready to paste anywhere — helpful if you are planning an extension with a neighbour, builder or architect.

Free quote in 60 seconds
Call us Free quote →

Before you go…

Get a free, no-obligation quote for your project. MCIAT chartered.

council-ready drawing review · All 33 London boroughs