020 7864 7245 [email protected] WhatsApp
Planning Permission · Romford · Havering

Planning Permission in Romford | Fixed-Fee Plans

Romford and the surrounding RM1 streets, near enough 30% below the London architect norm. Applications from Romford are registered by Havering Council and assessed against the Havering Local Plan alongside the rest of the RM1 district.

What is planning permission in Romford?

In Romford, planning permission are formal consent from Havering Council to carry out development on a Romford property. a Romford householder submission costs £548 statutory, decided by Havering Council in 8 weeks. The policy applied across RM1, RM2, RM7 is the Havering Local Plan, administered by Havering Council.

Planning Permission in Romford — the local dataset

Romford postcode districts
RM1, RM2, RM7 — Romford Central
Local planning authority
Havering Council (London Borough of Havering)
Dominant Romford stock
Victorian terraces, 1930s semi-detached, post-war flats
Statutory householder fee
£548, decided in 8 weeks
Landmarks near the RM1 sites we survey
Romford Market
Article 4 Direction
None borough-wide in Havering
Romford character
Victorian and post-war centre
Conservation areas in Havering
15, including Romford Market Conservation Area
Adjoining borough
Redbridge — nearest peer area Woodford Green
First-time approval rate
98% across our London caseload
Romford page reviewed
August 2026

Architectural design tools and technical drawings — planning drawings in London
Permission or permitted development?

Do I need planning permission in Romford?

No Article 4 Direction covers Havering, which keeps the Romford permitted-development route open on unlisted houses. Romford reads as Victorian and post-war centre, and that is the context a RM1 scheme is judged in. Conservation status changes the Romford route entirely — Romford Market being the usual case among the 15 designations in Havering. We plot the Romford site against the designation before quoting.

The Romford Article 4 position is established at survey, before design. What the Romford building allows is established first; what Havering Council allows, second. The borough policy layer over every RM1, RM2, RM7 address is set out on Havering planning. The Romford survey then carries into house extension drawings in Romford if the project runs on to construction.

Measured-survey victorian terrace for a Romford address in Havering
Measured-survey victorian terrace for a Romford address in Havering
Havering programme

How long does Havering Council take to decide?

Before Havering Council determines anything, London Borough of Havering has to validate the Romford submission — one to two weeks, longer if a plan is missing. The Romford survey comes first, because a proposal drawn on wrong existing plans fails validation later.

Statutory periods: 8 weeks from validation for a householder application, 13 weeks for a major scheme, 6 weeks for prior approval with a 21 days neighbour consultation, and 5 weeks for a full plans building control submission. A party structure notice requires one month notice and two months where excavation is involved.

An officer report on the RM1 case is written after the consultation closes. A Romford pack that misses a scale bar is a pack London Borough of Havering will reject — ours do not.

Objection volume on Romford cases is public — we read it before advising. A Romford survey takes two to three hours and needs access to every room.

The party wall step is not optional on shared Romford walls, and serving late is what stalls sites. Once consent is granted, architectural drawings follows for the RM1 property.

Building stock

What Romford's housing stock means for your plans

Romford is characterised by victorian terraces, 1930s semi-detached, post-war flats, concentrated across RM1, RM2, RM7 in the Romford Central area. What the victorian terraces in Romford allows is a construction question first and a planning question second, and the survey answers it. Applied to RM1 property: most applications on these Victorian streets are householder applications validated on existing and proposed plans, elevations, a site plan and a location plan. It is why the Romford existing set is measured, not traced. A Romford proposal that breaks the prevailing eaves line invites a refusal.

Lower-ground schemes in Romford answer to neighbours and groundwater. The Romford measured survey is reused across building regulations drawings for RM1 properties and loft conversion drawings, so the cost lands once.

What the Romford drawing pack contains

No add-ons later — the Romford scope is set out here.

  • site location plan for the Romford property
  • block plan
  • existing and proposed floor plans
  • existing and proposed elevations
  • Design & Access Statement

Streets and landmarks we survey around Romford

  • Harold Park — side returns where the 45-degree amenity test decides how far a Harold Park extension goes.
  • Collier Row — gardens deep enough for the 8 weeks householder route on a Collier Row plot.
  • Noak Hill — front-to-back level changes that drive the Noak Hill section drawings.
  • Raphael Park — roof profiles that set the ridge datum Havering Council measures a Raphael Park dormer against.
  • Harold Hill — shared flank walls, so Harold Hill party structure notices go out before work starts.
  • Ardleigh Green — closet wings that change how a rear extension meets the Ardleigh Green back addition.
  • Rush Green — frontages visible from the highway, so Romford Market materials detail governs the Rush Green elevation.
  • Gidea Park — front-to-back level changes that drive the Gidea Park section drawings.
  • Romford Market — schemes in view of it attract closer officer scrutiny.
  • Romford Market — schemes in view of it attract closer officer scrutiny.
  • Romford Cemetery — schemes in view of it attract closer officer scrutiny.
  • Chadwell Heath — the surrounding victorian terraces takes its scale from it.

Getting to a Romford survey

Surveyors travel to RM1 addresses from the studio; the nearest stations are Gidea Park, Barking Power Station, Romford, Shenfield. Appointments are booked in Romford on weekdays and Saturdays, and the measured survey of a standard victorian terraces takes two to three hours.

Where Romford sits

on Ordnance Survey grid reference TQ510887. Every Romford application opens with a location plan tied to that grid square; get it wrong and Havering Council returns the submission unvalidated. Source.

Practical detail for a Romford submission: transport for Romford runs through Gidea Park and Barking Power Station and Romford and Shenfield; post town for the area is ROMFORD; dialling code 01708. Site plans are drawn to the address as Havering Council holds it.

Romford postcode coverage

Romford work spans RM1 (Romford Central), which Romford holds on its own; RM2 (Gidea Park), which Romford holds on its own; RM7 (Romford / Rush Green), which Romford holds on its own — the designations change with the district line.

Streets and stations in Romford

Romford addresses we have drawn run to Harold Park, Collier Row, Noak Hill, Raphael Park, Harold Hill, Ardleigh Green, Rush Green and Gidea Park. most Romford sites are within walking distance of Gidea Park or Barking Power Station or Romford.

Areas we cover around Romford

Romford sits in a patch that also takes in Woodford Green (IG8), Ilford (IG1), Barkingside (IG6), Gants Hill (IG2), Snaresbrook (E11), Hornchurch (RM11, RM12), and we work all of it as far as the Redbridge boundary.

A printed planning application drawing set — proposed elevations, floor plans and the os location plan with the site outlined in red — planning permission in Romford
The planning set that goes to the council through the Planning Portal: proposed elevations, plans, and the OS location plan with your site outlined.
Fees and statutory charges

How much do planning permission cost in Romford?

What changes a Romford fee is the property: victorian terraces construction, shared walls on RM1, and whether heritage input is needed.

Statutory application fees are set by regulation, not by the council: £548 householder, £610 for a new dwelling, £274 for a lawful development certificate, £249 for prior approval.

The statutory charge on a Romford application goes to London Borough of Havering at submission. London planning approval-rate dataset · Havering planning · our London planning permission service · planning permission in Woodford Green.

Who draws your plans

MCIAT chartered technologists working across Havering

Romford work is issued under MCIAT charter, the technical-design and building-regulations qualification. For difficult Romford sites — anything in Romford Market, anything overlooking Romford Market — the pre-application route is cheap insurance.

Drawings are produced by chartered members of the Chartered Institute of Architectural Technologists (MCIAT), the professional body for technical design and building-regulations competence. First-time approval across our London caseload is 98%. Statutory fees shown are those in force in England in 2026 under the Town and Country Planning (Fees for Applications) Regulations. Confirm your local authority at gov.uk and submission requirements on the Planning Portal. Studio: 71–75 Shelton Street, London WC2H 9JQ.

Most Romford enquiries turn into a fixed quote the same day. This Romford page was reviewed in August 2026.

Romford questions

Planning Permission in Romford — common questions

When are planning permission required in Romford?

Many Romford owners assume they do and are wrong. No Article 4 Direction covers Havering, which keeps the Romford permitted-development route open on unlisted houses. Unlisted houses outside Romford Market often build under permitted development.

Which Romford streets are covered by a conservation area?

Romford Market is the designation to check for Romford. It changes front elevations far more than rear ones.

Do you draw victorian terraces, 1930s semi-detached, post-war flats in Romford?

Period and modern stock alike in Romford, with victorian terraces, 1930s semi-detached, post-war flats the norm.

Is Romford the only area you cover?

Woodford Green and the rest of Havering, plus Redbridge. Constraints shift between them.

Planning Permission in Romford — a London terraced street of the type we survey
A london terraced street of the type we survey — planning permission in Romford.
Other packages in Romford

Related drawings for RM1, RM2, RM7 properties

Planning Permission near Romford

planning drawings · Havering planning · our London planning permission service

Planning Permission in Romford

Chartered technologists covering Romford and the rest of Havering.

Get my quote

Found this useful? Share it

Copies the headline and the link, ready to paste anywhere — helpful if you are planning an extension with a neighbour, builder or architect.