How Listed Building Consent works in Camden, when you need it, and how to get a sensitive design approved.
Yes. Camden has hundreds of listed buildings, particularly in Hampstead, Primrose Hill, Bloomsbury, Camden Town, Fitzrovia. Listed Building Consent is required for any work affecting character — internal or external.
Planning permission concerns the visual and use impact on the surroundings. Listed Building Consent concerns the heritage value of the building itself — fabric, features, character. Most listed-building works need both.
8 weeks statutory, but with conservation officer and Historic England consultation, expect 12–16 weeks. Grade I and Grade II* always involve Historic England.
Detailed measured survey, existing-condition drawings, proposed drawings, Heritage Statement, materials specification, and a justification for every change. Photographs of every affected feature.
No. Listed status protects internal features as well — period plasterwork, joinery, fireplaces, staircases. Removal without consent is a criminal offence.



Pick a slot that suits you. No obligation and no sales pressure, just straight answers on your planning route.
Every Camden postcode district we draw in, the stock that dominates it and the authority that validates a listed building consent application there. Camden fees below are the statutory England rates for 2026, not listed building consent application estimates.
| Postcode | Area | Dominant stock | What it means for a listed building consent application |
|---|---|---|---|
| WC1N | Bloomsbury / Russell Square | Victorian and Edwardian terraces | Bloomsbury / Russell Square sits wholly inside WC1N, so Camden Council validates every listed building consent application submitted from an WC1N address. |
| WC1R | Holborn | Victorian and Edwardian terraces | WC1R covers Holborn only; Camden Council handles the listed building consent application. |
| WC1X | Bloomsbury / Mount Pleasant | Victorian and Edwardian terraces | WC1X straddles a boundary: Bloomsbury / Mount Pleasant addresses fall to Camden Council or Islington Council, so confirm which authority validates the listed building consent application before submitting WC1X drawings. |
| EC1N | Hatton Garden | Victorian and Edwardian terraces | A listed building consent application at an EC1N address in Hatton Garden is determined by Camden Council under its own Local Plan policies for Hatton Garden. |
| N19 | Archway / Tufnell Park | Victorian terraces, post-war flats | A listed building consent application in Archway / Tufnell Park may land with Islington Council or Camden Council — N19 crosses the boundary, and the N19 policies map decides it street by street. |
| NW2 | Cricklewood / Neasden | Edwardian villas and terraces | NW2 straddles a boundary: Cricklewood / Neasden addresses fall to Brent Council or Barnet Council or Camden Council, so confirm which authority validates the listed building consent application before submitting NW2 drawings. |
Roof pitch, wall build-up and plot depth change every few Camden streets, and each one changes what a listed building consent application can achieve at that address.
Conservation areas covering Camden: Camden Council runs 40, and Bloomsbury, Camden Town, Fitzrovia are the ones Camden owners meet most. A listed building consent application inside a Camden conservation area loses permitted development, so the Camden submission is a householder application at £548 decided in 8 weeks — not a £249 prior approval decided in 6 weeks. In Camden Town a listed building consent application is judged on the street elevation first.
Article 4 and your Camden listed building consent application: Article 4 removes permitted development for HMO conversions (C3 to C4) across the borough, plus restrictions on basement extensions in 12 conservation areas. At a N1C address that matters twice over, because Camden Council applies the direction unevenly across Camden — we read the Camden policies map for the exact N1C address before quoting listed building consent applications.
Digging below a Camden property: Camden's basement policy (Policy A5) restricts single-storey basements to 50% of garden area; double-storey basements generally refused outside commercial zones. Where a listed building consent application in Camden involves excavation that is read beside the Party Wall etc. Act 1996, which needs two months notice for a Camden dig within 3 m of a neighbour, and Camden Council expects the N1C ground conditions addressed in the application.
Camden housing stock: Victorian and Edwardian terraces, Georgian townhouses in Bloomsbury and Hampstead, post-war mansion blocks, modern developments in King's Cross. Creative, affluent in Hampstead and Primrose Hill; dense mixed-use around Camden Town and Kings Cross; academic character in Bloomsbury. Read that before choosing a listed building consent application route in Camden — construction, not postcode, sets what is achievable.
Sources for this Camden listed building consent application page: borough policies maps and conservation-area registers (2025–26), Royal Mail postcode district boundaries, the Town and Country Planning (Fees for Applications) (England) Regulations, the Town and Country Planning (General Permitted Development) (England) Order 2015 as amended, and the Party Wall etc. Act 1996.

Camden has one of the densest listed-building maps in the country. In Hampstead and Bloomsbury the working assumption should be that a building is listed until the list entry says otherwise.
| Measure | Camden | Context |
|---|---|---|
| Listed buildings on the register | 1,967 | MHCLG listed-building outlines, live entries only |
| Listed-works certificates issued | 2 | 1.8% of London's 114 over the same period |
| Conservation areas | 40 | the council's own published figure |
Sources: MHCLG District Planning Application Statistics (PS1/PS2) and the MHCLG Planning Data Platform registers, covering 2023 Q2 to 2026 Q1. Contains public sector information licensed under the Open Government Licence v3.0.
Same-day fixed quote. MCIAT chartered. 98% first-time approval rate.
Start free quoteOr contact us about your project first