MCIAT chartered building control drawing packages for Harrow on the Hill and the wider HA1 area, around 30% below typical London architect rates. Submissions from Harrow on the Hill go to Harrow Council and are weighed against Harrow Local Plan policy for the HA1 area.
If you own in Harrow on the Hill, building regulations drawings are the Harrow on the Hill construction drawings a building control body needs before work starts, separate from Harrow Council planning consent. The Harrow Local Plan governs and they cover Part A structure on the georgian and victorian houses, Part L insulation for Harrow on the Hill and Part B fire strategy, and a HA1 full plans submission is decided in 5 weeks.
No Article 4 Direction covers Harrow, which keeps the Harrow on the Hill permitted-development route open on unlisted houses. The Harrow on the Hill setting is Georgian and Victorian conservation hilltop, which shapes what passes near St Mary's Church. Conservation status changes the Harrow on the Hill route entirely — Harrow on the Hill being the usual case among the 29 designations in Harrow. The designation map is read street by street in Harrow on the Hill.
Knowing how Article 4 directions apply to your HA1 address is the first thing we establish. On Harrow on the Hill stock the constraint is physical before it is planning: the georgian and victorian houses fixes the rear wall line and the St Mary's Church roofline caps the ridge. The borough policy layer over every HA1 address is set out on Harrow planning. The Harrow on the Hill survey then carries into house extension drawings in Harrow on the Hill if the project runs on to construction.



Validation at London Borough of Harrow is the first delay a Harrow on the Hill applicant meets. The first visit to Harrow on the Hill is a measured survey — every room, every opening, every level change recorded on site.
Statutory periods: 8 weeks from validation for a householder application, 13 weeks for a major scheme, 6 weeks for prior approval with a 21 days neighbour consultation, and 5 weeks for a full plans building control submission. A party structure notice requires one month notice and two months where excavation is involved.
After validation a Harrow on the Hill application is allocated to an officer, who will visit the HA1 address. Each HA1 drawing carries the address, scale, north point and revision.
A Harrow on the Hill scheme that respects the 45-degree line rarely draws a sustained objection. Existing structure in the georgian and victorian houses is identified at survey, not guessed later.
Shared walls are the norm in Harrow on the Hill; the notice period is not optional. Once consent is granted, architectural drawings follows for the HA1 property.
Harrow on the Hill is characterised by georgian and victorian houses, listed buildings, concentrated across HA1 in the Harrow / Harrow on the Hill area. On Harrow on the Hill streets the georgian and victorian houses sets the structural sequence — what can be opened up, where the load goes, how deep you can build. Reading that across to Harrow on the Hill stock: georgian solid walls here cannot take standard cavity detailing, so Part L compliance is normally argued on a fabric-first basis with internal insulation and a condensation risk analysis. That is drawn out in the Harrow on the Hill proposed section. Harrow Council judges massing against the established Harrow on the Hill rhythm — the eaves and ridge lines running past St Mary's Church.
A Harrow on the Hill basement stands on its drainage and party wall evidence. Survey data from the Harrow on the Hill property flows straight into planning permission for HA1 properties or loft conversion drawings without a second site visit.
Here is what a HA1 instruction actually produces.
Surveyors travel to HA1 addresses from the studio; the nearest stations are Harrow-on-the-Hill station, Harrow-on-the-Hill, South Harrow. Appointments are booked in Harrow on the Hill on weekdays and Saturdays, and the measured survey of a standard georgian and victorian houses takes two to three hours.
on Ordnance Survey grid reference TQ155865, inside the Harrow West parliamentary constituency. That is the reference the Harrow on the Hill site plan is drawn over. Source.
Practical detail for a Harrow on the Hill submission: the closest stations to a HA1 site are Harrow-on-the-Hill station and Harrow-on-the-Hill and South Harrow; correspondence uses HARROW; dialling code 020. Site plans are drawn to the address as Harrow Council holds it.
Harrow on the Hill work spans HA1 (Harrow / Harrow on the Hill), which Harrow on the Hill holds on its own — the designations change with the district line.
Harrow on the Hill addresses we have drawn run to Northwick Park and Sudbury Hill. most Harrow on the Hill sites are within walking distance of Harrow-on-the-Hill station or Harrow-on-the-Hill or South Harrow.
Harrow on the Hill sits in a patch that also takes in North Harrow (HA2), South Harrow (HA2), Uxbridge (UB8), Ruislip (HA4), Northwood (HA6), Hayes (UB3, UB4), and we work all of it as far as the Hillingdon boundary.

You know the number before the surveyor is booked. The fee follows the building. On Harrow on the Hill stock that means party walls, levels, and the Harrow on the Hill heritage question.
Statutory application fees are set by regulation, not by the council: £548 householder, £610 for a new dwelling, £274 for a lawful development certificate, £249 for prior approval.
On a HA1 submission the statutory fee goes straight to London Borough of Harrow. London planning approval-rate dataset · Harrow planning · the London building regulations drawings pillar page · building regulations drawings in North Harrow.
The technologist drawing your Harrow on the Hill scheme is MCIAT chartered — the professional body for technical design and building-regulations competence. Not every Harrow on the Hill scheme is clear-cut. Where Harrow on the Hill or the Harrow School setting is in play, Harrow Council pre-application advice comes before the HA1 submission.
Drawings are produced by chartered members of the Chartered Institute of Architectural Technologists (MCIAT), the professional body for technical design and building-regulations competence. First-time approval across our London caseload is 98%. Statutory fees shown are those in force in England in 2026 under the Town and Country Planning (Fees for Applications) Regulations. Confirm your local authority at gov.uk and submission requirements on the Planning Portal. Studio: 71–75 Shelton Street, London WC2H 9JQ.
We will tell you if a Harrow on the Hill project does not need us. This Harrow on the Hill page was reviewed in August 2026.
Many HA1 projects do not. If the Harrow on the Hill property is an unlisted house clear of Harrow on the Hill, permitted development may cover it. No Article 4 Direction covers Harrow, which keeps the Harrow on the Hill permitted-development route open on unlisted houses. Where a future sale is in view we still file a £274 certificate as evidence.
Of the 29 conservation areas in Harrow, Harrow on the Hill is the one that reaches Harrow on the Hill stock most often. Inside it, expect reduced permitted development and a closer read of the St Mary's Church streetscape.
Mostly georgian and victorian houses, listed buildings, concentrated in HA1 (Harrow / Harrow on the Hill). We measure each Harrow on the Hill property with a laser rather than working from a sale particular, because the georgian and victorian houses rarely matches its original drawings.
North Harrow and the rest of Harrow, plus Hillingdon. Constraints shift between them.

building regulation drawings London · Harrow planning · the London building regulations drawings pillar page
We survey Harrow on the Hill free, quote the same day, and submit to Harrow Council ourselves.
Get my quote