020 7864 7245 [email protected] WhatsApp
Building Regulations Drawings · Colindale · Barnet

Building Regulations Drawings in Colindale |

MCIAT chartered building control drawing packages for Colindale and the wider NW9 area, around 30% below typical London architect rates. Submissions from Colindale go to Barnet Council and are weighed against Barnet Local Plan policy for the NW9 area.

What is building regulations drawings in Colindale?

For a Colindale property, building regulations drawings means the Colindale construction drawings a building control body needs before work starts, separate from Barnet Council planning consent. Barnet Council determines them under Barnet Local Plan policy — they cover Part A structure on the post-war flats, Part L insulation for Colindale and Part B fire strategy, and a NW9 full plans submission is decided in 5 weeks.

Building Regulations Drawings in Colindale — the local dataset

Colindale postcode districts
NW9 — Colindale / Kingsbury
Local planning authority
Barnet Council (London Borough of Barnet)
Dominant Colindale stock
Post-war flats, new-build
Statutory householder fee
£548, decided in 8 weeks
Landmarks near the NW9 sites we survey
Colindale station
Article 4 Direction
None borough-wide in Barnet
Colindale character
post-war flats, new-build
Conservation areas in Barnet
20, including Monken Hadley Conservation Area
Adjoining borough
Harrow — nearest peer area Wood Green
First-time approval rate
98% across our London caseload
Colindale page reviewed
August 2026

London terraced street — typical residential housing for building regulations
Consent route

Do I need building regulations drawings in Colindale?

No Article 4 Direction covers Barnet, which keeps the Colindale permitted-development route open on unlisted houses. Colindale presents as post-war flats, new-build, so massing and materials carry more weight in the Barnet Council assessment than they would on an outer-London plot. If your Colindale address is inside Monken Hadley, treat permitted development as reduced and plan for a full Barnet Council application. Conservation status is checked against the Colindale address before design.

That check — Article 4 directions against the Colindale property — happens on day one. On Colindale stock the constraint is physical before it is planning: the post-war flats fixes the rear wall line and the Colindale station roofline caps the ridge. The borough policy layer over every NW9 address is set out on Barnet planning. The Colindale survey then carries into planning permission in Colindale if the project runs on to construction.

Building regulations floor plan with structural notes for post-war flats on NW9 post-war flats, Barnet
Building regulations floor plan with structural notes for a post-war flats on a NW9 post-war flats, Barnet
NW9 timescales

How long does Barnet Council take to decide?

One to two weeks at London Borough of Barnet before a Colindale case reaches an officer. We start with a full laser survey of the Colindale address so the existing set is dimensionally right before anything proposed is drawn.

Statutory periods: 8 weeks from validation for a householder application, 13 weeks for a major scheme, 6 weeks for prior approval with a 21 days neighbour consultation, and 5 weeks for a full plans building control submission. A party structure notice requires one month notice and two months where excavation is involved.

A Colindale case only reaches committee if it draws significant objection. The NW9 pack is issued at 1:100 and 1:50 with a 1:1250 location plan.

Most Colindale refusals trace back to overlooking, not to size. We measure the NW9 property room by room, including ceiling heights and floor falls.

Party wall procedure catches most NW9 owners late; on Colindale stock assume it applies and serve in good time. Once consent is granted, loft conversion drawings follows for the NW9 property.

Colindale property types

What Colindale's housing stock means for your plans

Colindale is characterised by post-war flats, new-build, concentrated across NW9 in the Colindale / Kingsbury area. A Colindale scheme is designed around what the post-war flats can actually carry. Locally that resolves to this: post-war concrete frames here need a Part B fire strategy that addresses the existing compartmentation, not just the new work. We resolve it before the Colindale design is fixed. A Colindale proposal that breaks the prevailing eaves line invites a refusal.

Barnet Council assesses Colindale basements on standard grounds. The same Colindale drawings carry through to house extension drawings for NW9 properties and architectural drawings.

What the Colindale drawing pack contains

Here is what a NW9 instruction actually produces.

  • construction floor plans for the Colindale property
  • sections at 1:50
  • Part A structural notes
  • Part L thermal build-ups
  • Part B fire and escape strategy

Local landmarks that shape a Colindale application

  • Mill Hill — roof profiles that set the ridge datum Barnet Council measures a Mill Hill dormer against.
  • Golders Green — roof profiles that set the ridge datum Barnet Council measures a Golders Green dormer against.
  • Grahame Park — closet wings that change how a rear extension meets the Grahame Park back addition.
  • Colindale station — Barnet Council weighs NW9 sightlines to it in the character assessment.
  • British Library — massing on adjoining NW9 plots is tested against it.
  • Hendon Police College — schemes visible from it get closer scrutiny in Barnet.
  • Colindale Hospital — a Colindale roof extension is judged against the datum it sets.

Getting to a Colindale survey

Surveyors travel to NW9 addresses from the studio; the nearest stations are Colindale. Appointments are booked in Colindale on weekdays and Saturdays, and the measured survey of a standard post-war flats takes two to three hours.

Where Colindale sits

Colindale lies 8 miles (13 km) northwest of Charing Cross, on Ordnance Survey grid reference TQ213897. Barnet Council checks the Colindale location plan against that reference before registering it. Source.

Practical detail for a Colindale submission: Colindale put Colindale within easy reach; NW9 addresses are written to LONDON; dialling code 020. Site plans are drawn to the address as Barnet Council holds it.

Colindale postcode coverage

We survey and draw across NW9 (Colindale / Kingsbury), which Colindale holds on its own. The NW9 boundary decides which Barnet designations apply to your Colindale address.

Streets and stations in Colindale

Our NW9 caseload covers Mill Hill, Golders Green and Grahame Park. most Colindale sites are within walking distance of Colindale.

Areas we cover around Colindale

We survey across Wood Green (N22), Enfield Town (EN1, EN2), Palmers Green (N13), Winchmore Hill (N21), Southgate (N14), Edmonton (N9, N18) as well as Colindale itself, plus the Harrow side of the boundary.

Building Regulations Drawings in Colindale — an engineer marking up structural drawings
An engineer marking up structural drawings — building regulations drawings in Colindale.
Fees explained

How much do building regulations drawings cost in Colindale?

Two Colindale jobs differ in price because of the post-war flats and the Monken Hadley designation, never because of hours booked.

Statutory application fees are set by regulation, not by the council: £548 householder, £610 for a new dwelling, £274 for a lawful development certificate, £249 for prior approval.

That fee is collected by London Borough of Barnet when the NW9 application is lodged. London planning approval-rate dataset · Barnet planning · our London building regulations drawings service · building regulations drawings in Wood Green.

Accountability

MCIAT chartered technologists working across Barnet

The technologist drawing your Colindale scheme is MCIAT chartered — the professional body for technical design and building-regulations competence. When a Colindale case could go either way we pay for Barnet Council pre-application advice rather than test it live.

Drawings are produced by chartered members of the Chartered Institute of Architectural Technologists (MCIAT), the professional body for technical design and building-regulations competence. First-time approval across our London caseload is 98%. Statutory fees shown are those in force in England in 2026 under the Town and Country Planning (Fees for Applications) Regulations. Confirm your local authority at gov.uk and submission requirements on the Planning Portal. Studio: 71–75 Shelton Street, London WC2H 9JQ.

We will tell you if a Colindale project does not need us. This Colindale page was reviewed in August 2026.

Colindale questions

Building Regulations Drawings in Colindale — common questions

Do Colindale homeowners always need building regulations drawings?

A Colindale house outside Monken Hadley usually keeps its rights; a flat never does. No Article 4 Direction covers Barnet, which keeps the Colindale permitted-development route open on unlisted houses. We confirm before quoting on any NW9 address.

Is Colindale in a conservation area?

Barnet designates 20 conservation areas; Monken Hadley is the one that most often catches a Colindale project. Inside it permitted development is trimmed and the scheme must answer the character appraisal, so Colindale streets near Colindale station are drawn to a different brief from the outer NW9 roads.

Which properties in NW9 do you survey?

post-war flats, new-build makes up the bulk of our NW9 caseload.

Can you draw a property outside Colindale?

Yes. Barnet in full, Wood Green included, and the Harrow side of the boundary — though the post-war flats and designations change as you move.

A building regulations drawing pack open on a desk — a construction section sheet and its specification schedule — building regulations drawings in Colindale
The building regulations pack: construction sections and the specification building control signs the work off against.
Other packages in Colindale

Related drawings for NW9 properties

Building Regulations Drawings near Colindale

building regulation drawings London · Barnet planning · our London building regulations drawings service

Building Regulations Drawings in Colindale

Free Colindale survey, and we deal with Barnet Council for you.

Get my quote

Found this useful? Share it

Copies the headline and the link, ready to paste anywhere — helpful if you are planning an extension with a neighbour, builder or architect.