Chartered building control drawing packages for the IG11 area. No hourly billing, and around 30% below typical London architect rates. For a Barking property the determining body is Barking and Dagenham Council, and the Barking and Dagenham Local Plan is the policy it applies.
Building Regulations Drawings in Barking are the Barking construction drawings a building control body needs before work starts, separate from Barking and Dagenham Council planning consent. Every IG11 application is decided by Barking and Dagenham Council under the Barking and Dagenham Local Plan, and they cover Part A structure on the victorian terraces, Part L insulation for Barking and Part B fire strategy, and a IG11 full plans submission is decided in 5 weeks.
No Article 4 Direction covers Barking and Dagenham, which keeps the Barking permitted-development route open on unlisted houses. The Barking setting is Victorian centre, regen riverside, which shapes what passes near Barking Town Hall. Valence House is the designation that most often reshapes a Barking proposal; Barking and Dagenham carries 9 of them. Whether a Barking plot sits inside the boundary changes the whole route.
How Article 4 directions apply to your Barking street is settled at survey stage, not after submission. Measure a IG11 property and the victorian terraces answers most of it — where the original rear wall sat, and what height the Barking street will carry. The borough policy layer over every IG11 address is set out on Barking and Dagenham planning. The Barking survey then carries into loft conversion drawings in Barking if the project runs on to construction.



A Barking application is not live until London Borough of Barking and Dagenham validates it, which takes one to two weeks on a complete pack. The Barking job starts with a laser survey, not a sketch.
Statutory periods: 8 weeks from validation for a householder application, 13 weeks for a major scheme, 6 weeks for prior approval with a 21 days neighbour consultation, and 5 weeks for a full plans building control submission. A party structure notice requires one month notice and two months where excavation is involved.
Once Barking and Dagenham Council registers the Barking case, the officer site visit usually follows within a fortnight. We format the Barking set exactly as Barking and Dagenham Council wants to receive it.
London Borough of Barking and Dagenham weighs material objections only — a Barking neighbour disliking the design is not one. The Barking survey records every opening, level change and structural wall.
Because Barking houses generally share walls, budget time for party wall notices alongside the IG11 application. Once consent is granted, house extension drawings follows for the IG11 property.
Barking is characterised by victorian terraces, post-war flats, new-build, concentrated across IG11 in the Barking area. Barking is not uniform, but the victorian terraces recurs often enough across IG11 that the structural pattern is predictable once measured. For Barking owners this matters because victorian solid brickwork here drives the Part L strategy and the Part C damp detailing. That is the Barking constraint Barking and Dagenham Council will look for. The prevailing Barking eaves line is the reference Barking and Dagenham Council uses, which is why the proposed elevation is drawn with the neighbours on it.
No borough-specific basement policy applies in Barking and Dagenham, so subterranean work at a Barking address is judged on amenity, drainage and structural grounds. Where the project also touches architectural drawings for IG11 properties or planning permission, the same measured survey of the Barking property carries across — you pay for the survey once, not per application.
Everything a Barking submission needs is in the list below.
Surveyors travel to IG11 addresses from the studio; the nearest stations are Barking, Barking Power Station, Barking Riverside, Barking station. Appointments are booked in Barking on weekdays and Saturdays, and the measured survey of a standard victorian terraces takes two to three hours.
Barking lies 9.3 miles (15 km) east of Charing Cross, on Ordnance Survey grid reference TQ440840, with the River Roding shaping drainage and flood-risk questions on lower-lying IG11 plots. Getting that wrong is the commonest reason a Barking submission is returned. Source.
Practical detail for a Barking submission: Barking and Barking Power Station and Barking Riverside and Barking station cover the IG11 area; the postal town here is BARKING; dialling code 020; listed fabric nearby includes Grade I National trust. Site plans are drawn to the address as Barking and Dagenham Council holds it.
Our Barking coverage takes in IG11 (Barking), which Barking holds on its own.
Typical Barking work sits on Mayesbrook Park. most Barking sites are within walking distance of Barking or Barking Power Station or Barking Riverside. and Grade I National trust is listed, which pulls neighbouring IG11 proposals into a setting assessment.
Coverage from Barking extends to Gants Hill (IG2), Snaresbrook (E11), Stratford (E15), Forest Gate (E7), Plaistow (E13), East Ham (E6) and into Redbridge.

The variables on a IG11 job are structural: party walls, floor levels, and whether the Valence House designation adds a heritage statement.
Statutory application fees are set by regulation, not by the council: £548 householder, £610 for a new dwelling, £274 for a lawful development certificate, £249 for prior approval.
That fee is collected by London Borough of Barking and Dagenham when the IG11 application is lodged. London planning approval-rate dataset · Barking and Dagenham planning · Building Regulations Drawings London-wide · building regulations drawings in Gants Hill.
A chartered technologist surveys the Barking property and signs the drawings — the same person, start to finish. Borderline Barking sites (anything overlooking Barking Riverside, anything with a Valence House frontage) go to Barking and Dagenham Council for pre-application advice before we submit.
Drawings are produced by chartered members of the Chartered Institute of Architectural Technologists (MCIAT), the professional body for technical design and building-regulations competence. First-time approval across our London caseload is 98%. Statutory fees shown are those in force in England in 2026 under the Town and Country Planning (Fees for Applications) Regulations. Confirm your local authority at gov.uk and submission requirements on the Planning Portal. Studio: 71–75 Shelton Street, London WC2H 9JQ.
Start with the free Barking survey — nothing is committed until you have the fee. This Barking page was reviewed in August 2026.
It depends on the Barking address. Houses beat flats, unlisted beats listed, and outside Valence House the permitted-development route usually survives. No Article 4 Direction covers Barking and Dagenham, which keeps the Barking permitted-development route open on unlisted houses. We check yours free before quoting.
The relevant designation for most Barking addresses is Valence House, among 9 in Barking and Dagenham. It changes what can be done at the front far more than at the rear of a IG11 plot.
Predominantly victorian terraces, post-war flats, new-build across IG11. On Barking projects the victorian terraces governs what is structurally possible, and the measured survey establishes it on site.
Yes, throughout Barking and Dagenham. Barking and Gants Hill are handled by the same team.

building regulation drawings London · Barking and Dagenham planning · Building Regulations Drawings London-wide
Book a free Barking survey — same-day quote, MCIAT chartered throughout.
Get my quote