Residential engineering across Harrow, signed by a chartered structural engineer. Openings and their lintels, beams over removed walls, pad foundations, loft joists, underpinning. Eurocode design, set out the way Building Control wants to read it.
Whenever a load path changes: removing a wall, forming an opening, or trimming rafters for a dormer. Building control checks the calculations at full plans stage and must decide within five weeks. A domestic floor converted to habitable use carries an imposed load of 1.5 kN/m².
| Work | Calculations required | Basis |
|---|---|---|
| Removing a load-bearing wall | Yes | Beam sizing and padstone bearing, Part A |
| Forming an opening in a rear wall | Yes | Lintel or goalpost frame, Part A |
| Rear dormer cutting roof rafters | Yes | Trimming and new floor loading, Part A |
| Loft floor to habitable loading | Yes | 1.5 kN/m² imposed load, BS EN 1991-1-1 |
| Non-structural stud partition | No | No change to load path |
| Full plans decision period | 5 weeks, or 2 months by agreement | Building Regulations 2010, reg 14 |
Sources: the Building Regulations 2010 (as amended), Schedule 1 Part A and regulation 14; Approved Document A; BS EN 1991-1-1 with its UK National Annex for imposed floor loading. Read at 1 September 2026. Calculations go to building control, not to planning — Harrow’s planning committee sees more cases than any other London borough’s, at 12.7% of decisions, but structure is not among the things it assesses.
Structural calculations in Harrow, a borough of 1930s semi-detached dominates; Edwardian villas in Harrow on the Hill and Pinner; Metropolitan Green Belt in Stanmore and Harrow Weald; post-war flats around Harrow Central, are the full measured-survey-to-submission drawing set London Borough of Harrow needs in order to determine an application: existing and proposed plans, elevations and sections at 1:100 and 1:50, a location and site plan, and the supporting statements the case officer asks for.
Prepared and reviewed by the architectural technologist team at Architectural Drawings London — CIAT Affiliate, professional indemnity insured.Last reviewed 2026-08-03.


Chartered structural engineer calculations for every residential intervention in Harrow — steel beams, lintels, pad foundations, wall removals, loft floor joists, underpinning. Eurocode-compliant, Building Control-ready.
Housing stock in Harrow: 1930s semi-detached dominates; Edwardian villas in Harrow on the Hill and Pinner; Metropolitan Green Belt in Stanmore and Harrow Weald; post-war flats around Harrow Central.
Character: Outer north-west London suburban; Harrow on the Hill has exceptionally strict heritage controls; rest of borough permissive.
RSJ and padstone design for a Harrow kitchen being opened up, two reception rooms knocked together, or a ground floor taken open-plan.
Ridge beams, purlins, dormer framing and the joist upgrade that turns a Harrow roof void into a floor you may legally stand on.
Pad, strip or trench-fill foundations designed against the ground you actually have in Harrow, the trees standing near it, and where the drains run.
New openings for a window or a door. The lintel gets specified in steel, concrete or timber, and its bearing is worked out rather than guessed at.
Basement work under Harrow houses: sequential underpinning, reinforced slabs, and the retaining walls that hold the neighbours' ground back.
CEng MIStructE or MICE, signed at the bottom of the sheet. That signature is the thing a building control body is checking for before it reads anything else.

Single planning or regs submission.
Planning + building regs + structural.
Listed, conservation, complex sites.
Move the controls for an indicative figure. It anchors your budget — it is not a quote. Every project is priced after a site survey.
Build costs are separate and quoted by your contractor. See our published fees.
Every Harrow postcode district we work in, the stock that dominates it, and which authority determines a planning application from that address. The calculations themselves go to Building Control rather than to a planning officer. Fees quoted below are the 2026 statutory England application rates.
| Postcode | Area | Dominant stock | What it means for a structural calculation package |
|---|---|---|---|
| HA1 | Harrow / Harrow on the Hill | Georgian and Victorian houses, listed buildings | HA1 covers the town centre and the Hill, all of it inside the borough. The Hill's conservation designation alters the planning route without altering any of the engineering. |
| HA2 | North Harrow / South Harrow | 1930s semi-detached | HA2 takes in North Harrow and South Harrow, both wholly inside the borough, so anything needing permission there goes to Harrow Council. |
| HA3 | Harrow Weald / Kenton / Wealdstone | 1930s semi-detached | HA3 covers Harrow Weald, Kenton and Wealdstone. Harrow Weald and Wealdstone are Harrow throughout; Kenton is split, with its eastern side falling to Brent. |
| HA7 | Stanmore | 1930s semi-detached, Edwardian villas | Stanmore lies wholly inside HA7 and wholly inside the borough, so Harrow Council validates anything submitted from an HA7 address. |
| HA5 | Pinner / Eastcote | Tudor fragments, Edwardian villas, 1930s semi-detached | HA5 spans Pinner and Eastcote and crosses the borough line. Eastcote sits partly with Hillingdon, so establish the authority from the address rather than the district. |
Wall build-ups and roof geometry change street by street here. The VOA count at 31 March 2025 puts 41.6% of Harrow's 96,860 homes in the 1930s alone, a single decade with structural habits of its own, and what works at one address does not automatically work next door.
Harrow conservation designations: 29 in all, with Pinner Village, Stanmore and Harrow Weald among them. Designation costs an owner the permitted development route, so the planning side becomes a householder application instead of a prior approval. The householder application fee in England is £548 and the decision is due in eight weeks; the fee for a larger householder prior approval is £249, and that one is due in six. None of this changes what the structure has to do. A beam over a widened opening is sized identically inside a designation and outside it.
Article 4 and your Harrow structural calculation package: Harrow Council has made no borough-wide direction, so permitted development for a structural calculation package in Harrow generally survives outside Harrow conservation areas and listed curtilages. A Lawful Development Certificate at £274 is how a HA1 owner records that a structural calculation package was lawful.
The building fabric around Harrow: 1930s semi-detached dominates; Edwardian villas in Harrow on the Hill and Pinner; Metropolitan Green Belt in Stanmore and Harrow Weald; post-war flats around Harrow Central. Outer north-west London suburban; Harrow on the Hill has exceptionally strict heritage controls; rest of borough permissive. A structural calculation package in Harrow is scoped against that stock first, because it decides whether the scheme runs as permitted development, a £274 Lawful Development Certificate, or a full £548 application to Harrow Council.
Sources for this Harrow structural calculation package page: borough policies maps and conservation-area registers (2025–26), Royal Mail postcode district boundaries, the Town and Country Planning (Fees for Applications) (England) Regulations, the Town and Country Planning (General Permitted Development) (England) Order 2015 as amended, and the Party Wall etc. Act 1996.
The questions Harrow homeowners actually put to us about structural calculations, answered plainly.
Start a free quote →What you pay tracks how much of the house is being disturbed. One beam over a removed wall sits at the bottom of the range. A full set for a loft or an extension, covering ridge beam and purlins and foundations and lintels together, sits above it. Basement or multi-storey work is priced on its own terms. Chartered sign-off is inside every package. Fees below.
Yes, always. Any wall in a Harrow house that is doing structural work needs calculations before it is touched, proving the replacement steel and its bearings take the loads the old wall was quietly holding. Without that, nothing gets signed off. Worth knowing, too, how this council behaves when something goes up that it did not agree to. Across the twelve quarters ending March 2026 Harrow recorded 65 planning enforcement notices. Contravention notices, the investigative step that usually precedes them, numbered 4, and a single notice was served for breach of condition. This is an authority that goes to the formal instrument early. Check the partitions as well. A surprising number turn out to be doing structural work. Source: MHCLG live planning statistics.
Calculations land within 1 to 2 weeks of the drawings and site dimensions reaching us. Harrow projects on a deadline can take the fast-track route instead, 3 to 5 working days, at a modest premium.
They are different documents, and the words get used interchangeably by people selling both. A structural survey inspects what already stands and reports defects, movement, subsidence. Structural calculations design what is going in: the beam, the foundation, the loft steel. For a Harrow extension or loft it is nearly always the design that is wanted, not the inspection. We produce the calculations, and where a condition report is genuinely the right instrument we will say so and name someone who writes them.
Yes, calculations can be commissioned on their own, worked up against drawings another practice has already produced. If the drawing set is still to come, our Complete package carries both and costs less than buying the two apart.

If your property sits on a boundary, here are the neighbouring options.
Drawings, surveys and engineering for Harrow addresses, all under one chartered roof.
A construction-ready drawing package compliant with every Approved Document — Part A structure, Part B fire, Part L thermal, Part M accessib...
Every loft type across every Harrow roof line — dormer, mansard, hip-to-gable, L-shape, Velux. LDC or full planning route, building regulati...
The whole spectrum — rear extensions, side returns, wraparounds, double-storey, basement digs. Planning-led design with detailed technical p...
Harrow's most space-efficient loft solution when PD-route dormers are blocked. Our team designs mansards that get approved in Harr...
Turn your unused Harrow garage into a bedroom, home office or open-plan kitchen-diner. Planning route assessment, full building regulations ...
Full architectural technology service for basement digs and cellar conversions in Harrow — structural underpinning design, waterproofing str...
Measured surveys across Harrow — floor plans, elevations and sections to ±3mm accuracy. Leica Disto laser + BLK360 point-cloud scanning, Aut...
End-to-end Party Wall Act 1996 service for Harrow — Section 1, 3 and 6 notices, schedule of condition surveys, party wall award coordination...
London's most popular loft type — the full-width rear dormer. Planning or Permitted Development route assessed for your Harrow property, bui...
Leave your number and an Architectural technologist will call you back within 30 minutes during working hours.
No obligation. No sales pressure. Just expert advice about structural calculations in Harrow.
Free quote in 60 seconds. No hourly billing. CIAT Affiliate.
Get my free quote →