For Bromley homeowners in Large 1930s detached and semi-detached in Chislehurst and Bickley; Edwardian in Beckenham; Victorian in Bromley town; Metropolitan Green Belt covers significant rural-fringe land, a planning permission drawings package is the full measured-survey-to-submission drawing set London Borough of Bromley needs in order to determine an application: existing and proposed plans, elevations and sections at 1:100 and 1:50, a location and site plan, and the supporting statements the case officer asks for.
Prepared and reviewed by the chartered technologist team at Architectural Drawings London — MCIAT chartered, £2m PI insured.Last reviewed 2026-08-03.


Housing stock in Bromley: Large 1930s detached and semi-detached in Chislehurst and Bickley; Edwardian in Beckenham; Victorian in Bromley town; Metropolitan Green Belt covers significant rural-fringe land.
Character: Largest London borough by area; substantial Green Belt; conservation areas in most town centres; generally permissive elsewhere.
A chartered technologist visits and laser-measures every room. Typically 60–90 minutes on site.
Drafted in Revit or AutoCAD at 1:100 or 1:50. Fully annotated and council-ready.
Unlimited revisions until you approve. Shadow studies for committee-sensitive applications.
Site location plan, block plan, Design & Access Statement where required.
We lodge the application with Bromley Council and pay statutory fees directly.
Every officer query, consultation response and amendment handled through to determination.

Single planning or regs submission.
Planning + building regs + structural.
Listed, conservation, complex sites.
Move the controls for an indicative figure. It anchors your budget — it is not a quote. Every project is priced after a free survey.
Build costs are separate and quoted by your contractor. See our published fees.
Every Bromley postcode district we draw in, the stock that dominates it and the authority that validates a planning drawing set there. Bromley fees below are the statutory England rates for 2026, not planning drawing set estimates.
| Postcode | Area | Dominant stock | What it means for a planning drawing set |
|---|---|---|---|
| BR1 | Bromley / Bickley | Victorian terraces, Edwardian villas, post-war flats | BR1 covers Bromley / Bickley only; Bromley Council handles the planning drawing set, and Bromley / Bickley case officers apply the BR1 conservation-area map. |
| BR2 | Hayes / Keston | Victorian terraces, Edwardian villas, post-war flats | BR2 covers Hayes / Keston only; Bromley Council handles the planning drawing set, and Hayes / Keston case officers apply the BR2 conservation-area map. |
| BR3 | Beckenham | Edwardian villas, 1930s semi-detached | A planning drawing set at an BR3 address in Beckenham is determined by Bromley Council under its own Local Plan policies for Beckenham. |
| BR4 | West Wickham | 1930s semi-detached | A planning drawing set at an BR4 address in West Wickham is determined by Bromley Council under its own Local Plan policies for West Wickham. |
| BR5 | Orpington / Petts Wood | 1930s semi-detached | A planning drawing set at an BR5 address in Orpington / Petts Wood is determined by Bromley Council under its own Local Plan policies for Orpington / Petts Wood. |
| BR6 | Orpington | 1930s semi-detached | A planning drawing set at an BR6 address in Orpington is determined by Bromley Council under its own Local Plan policies for Orpington. |
| BR7 | Chislehurst | 1930s detached, Edwardian villas | BR7 covers Chislehurst only; Bromley Council handles the planning drawing set, and Chislehurst case officers apply the BR7 conservation-area map. |
| BR8 | Swanley | Large 1930s detached and semi-detached in Chislehurst and Bickley; Edwardian in Beckenham; Victorian in Bromley town; Metropolitan Green Belt covers significant rural-fringe land | A planning drawing set at an BR8 address in Swanley is determined by Bromley Council under its own Local Plan policies for Swanley. |
Roof pitch, wall build-up and plot depth change every few Bromley streets, and each one changes what a planning drawing set can achieve at that address.
Conservation areas covering Bromley: Bromley Council runs 48, and Keston, Bickley, Bromley Town are the ones Bromley owners meet most. A planning drawing set inside a Bromley conservation area loses permitted development, so the Bromley submission is a householder application at £548 decided in 8 weeks — not a £249 prior approval decided in 6 weeks. In Chislehurst a planning drawing set is judged on the street elevation first.
Bromley permitted development status: there is no borough-wide direction from Bromley Council, so a planning drawing set at a SE20 address is normally still permitted development. We certify that with a £274 Lawful Development Certificate rather than leaving a Bromley sale to argue it later.
Bromley housing stock: Large 1930s detached and semi-detached in Chislehurst and Bickley; Edwardian in Beckenham; Victorian in Bromley town; Metropolitan Green Belt covers significant rural-fringe land. Largest London borough by area; substantial Green Belt; conservation areas in most town centres; generally permissive elsewhere. Read that before choosing a planning drawing set route in Bromley — construction, not postcode, sets what is achievable. Bromley Council charges £548 for a householder application and has 8 weeks to determine it.
Sources for this Bromley planning drawing set page: borough policies maps and conservation-area registers (2025–26), Royal Mail postcode district boundaries, the Town and Country Planning (Fees for Applications) (England) Regulations, the Town and Country Planning (General Permitted Development) (England) Order 2015 as amended, and the Party Wall etc. Act 1996.
Of 820 appeals on new-dwelling schemes decided in Bromley over the window covering appeals decided 2016-2026, Bromley sat close to the London norm, with 27.3% of appeals succeeding against 22.4% city-wide. 224 were allowed and 595 dismissed, with 1 split. Schemes creating a new home - conversions, infills, small developments - carry the most risk, and these 820 Bromley appeals are only the ones refused or left undetermined, never the approvals.
Half of those Bromley appeals took more than 118 days to decide from the day the appeal started — time added on top of the council's own determination period, which is the argument for getting the application right first. 96.1% were decided by written representations rather than a hearing or inquiry, meaning the written case and the drawings were the whole of the evidence.
820 appeals on new-dwelling schemes decided in Bromley. Source: Planning Inspectorate casework, OGL v3.0.
Direct answers to the questions Bromley homeowners ask every week about planning permission drawings.
Start a free quote →Our Bromley planning fee is fixed before we start and depends on the route — a householder application is the simplest, while major works, change of use and flat conversions carry more drawings and supporting documents. Bromley Council also charges its own statutory application fee on top, set nationally. See our fees for current figures.
Once validated, Bromley Council aims to decide householder applications within 8 weeks and major applications within 13 weeks — consistent with statutory targets. Our typical end-to-end timeline from instruction to submission is 3–4 weeks.
Bromley does not currently have a borough-wide Article 4 Direction for residential extensions or HMO conversions. Most householder permitted development rights apply normally in Bromley — though conservation areas and listed buildings still restrict PD. We confirm at the free site survey.
Bromley has 48 designated conservation areas, including Bromley Town, Chislehurst, Beckenham and others. Planning applications within conservation areas require additional heritage consideration and often a Heritage Statement.
For most householder work in Bromley, a chartered architectural technologist delivers the same planning outcomes as a dedicated consultant — usually at lower cost. Our MCIAT-chartered team handles drawings, submission and agent liaison as one package.
We cover all Bromley postcodes — BR1, BR2, BR3, BR4, BR5, BR6, BR7, BR8, SE6, SE9, SE12, SE20, SE26 — as well as the immediately adjacent boroughs. Survey appointments are available within 3 working days across Bromley.
Bromley's large 1930s detached and semi-detached in Chislehurst and Bickley housing stock and 48 conservation areas mean that design quality matters. Bromley Council officers are experienced reviewers; well-drawn, consistent applications are processed faster than revisions-heavy ones.
Yes — Planning Inspectorate appeals are available as a right within 12 weeks of refusal from Bromley Council. Written representations take 16–20 weeks; hearings 24–32 weeks. We prepare appeal statements and revised drawings for cases where refusal was on design or policy grounds.

If your property sits on a boundary, here are the neighbouring options.
We cover every architectural technology service in Bromley with one chartered team.
A construction-ready drawing package compliant with every Approved Document — Part A structure, Part B fire, Part L thermal, Part M accessib...
Every loft type across every Bromley roof line — dormer, mansard, hip-to-gable, L-shape, Velux. LDC or full planning route, building regulat...
The whole spectrum — rear extensions, side returns, wraparounds, double-storey, basement digs. Planning-led design with detailed technical p...
Bromley's most space-efficient loft solution when PD-route dormers are blocked. Our chartered team designs mansards that get approved in Bro...
Turn your unused Bromley garage into a bedroom, home office or open-plan kitchen-diner. Planning route assessment, full building regulations...
Full architectural technology service for basement digs and cellar conversions in Bromley — structural underpinning design, waterproofing st...
Chartered structural engineer calculations for every residential intervention in Bromley — steel beams, lintels, pad foundations, wall remov...
Measured surveys across Bromley — floor plans, elevations and sections to ±3mm accuracy. Leica Disto laser + BLK360 point-cloud scanning, Au...
End-to-end Party Wall Act 1996 service for Bromley — Section 1, 3 and 6 notices, schedule of condition surveys, party wall award coordinatio...
London's most popular loft type — the full-width rear dormer. Planning or Permitted Development route assessed for your Bromley property, bu...
Leave your number and an Architectural technologist will call you back within 30 minutes during working hours.
No obligation. No sales pressure. Just expert advice about planning permission drawings in Bromley.
Free quote in 60 seconds. No hourly billing. MCIAT chartered.
Get my free quote →