End-to-end Party Wall Act 1996 service for Bexley — Section 1, 3 and 6 notices, schedule of condition surveys, party wall award coordination. We handle the process so your Bexley build starts without neighbour disputes.
Two months before cutting into a shared wall, one month before building at the boundary or excavating within three metres of a neighbour's foundations. Bexley decides planning applications faster than almost anywhere, but the party wall clock runs entirely separately.
| Section | Work it catches | Notice period |
|---|---|---|
| Section 1 | New wall at or astride the boundary | 1 month |
| Section 2 | Cutting into or raising a shared wall | 2 months |
| Section 6(1) | Excavating within 3m, deeper than their footings | 1 month |
| Section 6(2) | Excavating within 6m, inside a 45-degree line | 1 month |
| No reply within 14 days | deemed dissent, surveyors appointed | Section 10 |
| Bexley decisions inside eight weeks | 97.9% | MHCLG PS1 and PS2 |
Sources: the Party Wall etc. Act 1996, sections 1, 2, 6 and 10, read at 1 September 2026; Bexley decision figures from MHCLG District Planning Application Statistics (PS1 and PS2), twelve quarters to March 2026. A fast planning decision does not shorten a two-month section 2 notice, which is often what actually sets the start date.
For Bexley homeowners in 1930s semi-detached dominates; Victorian cottages in Bexley Village and Crayford; post-war estates in Thamesmead and Erith, a party wall services package is the full measured-survey-to-submission drawing set London Borough of Bexley needs in order to determine an application: existing and proposed plans, elevations and sections at 1:100 and 1:50, a location and site plan, and the supporting statements the case officer asks for.
Prepared and reviewed by the chartered technologist team at Architectural Drawings London — MCIAT chartered, £2m PI insured.Last reviewed 2026-08-03.


End-to-end Party Wall Act 1996 service for Bexley — Section 1, 3 and 6 notices, schedule of condition surveys, party wall award coordination. We handle the process so your Bexley build starts without neighbour disputes.
Housing stock in Bexley: 1930s semi-detached dominates; Victorian cottages in Bexley Village and Crayford; post-war estates in Thamesmead and Erith.
Character: Outer south-east London suburban; very permissive planning environment; strong PD uptake for extensions and loft conversions.
We review your Bexley project and confirm which Party Wall Act sections apply — Section 1 (new wall on boundary), Section 3 (adjacent excavation) or Section 6 (line of junction).
Legally-compliant notices prepared and served on all adjoining owners, with 14-day or 1-month response periods tracked.
Photographic and written record of neighbouring properties before work starts — protects you and your Bexley neighbours from disputes.
Technical drawings showing the proposed works in relation to the party wall, foundations and adjoining structures — required by the Act.
If neighbours dissent, we coordinate the appointment of agreed surveyors or independent surveyors to prepare the Party Wall Award.
Liaison through the award process — method statements, temporary works, access arrangements — until the award is agreed and you can start on site.

Single planning or regs submission.
Planning + building regs + structural.
Listed, conservation, complex sites.
Move the controls for an indicative figure. It anchors your budget — it is not a quote. Every project is priced after a free survey.
Build costs are separate and quoted by your contractor. See our published fees.
Every Bexley postcode district we draw in, the stock that dominates it and the authority that validates a party wall package there. Bexley fees below are the statutory England rates for 2026, not party wall package estimates.
| Postcode | Area | Dominant stock | What it means for a party wall package |
|---|---|---|---|
| DA8 | Erith | Victorian terraces, post-war estates | DA8 covers Erith only; Bexley Council handles the party wall package, and Erith case officers apply the DA8 conservation-area map. |
| DA14 | Sidcup | 1930s semi-detached, Edwardian villas | Sidcup sits wholly inside DA14, so Bexley Council validates every party wall package submitted from an DA14 address. |
| DA16 | Welling | 1930s semi-detached | A party wall package at an DA16 address in Welling is determined by Bexley Council under its own Local Plan policies for Welling. |
| DA17 | Belvedere | 1930s semi-detached, post-war flats | A party wall package at an DA17 address in Belvedere is determined by Bexley Council under its own Local Plan policies for Belvedere. |
| DA18 | Erith Marshes | 1930s semi-detached dominates; Victorian cottages in Bexley Village and Crayford; post-war estates in Thamesmead and Erith | DA18 covers Erith Marshes only; Bexley Council handles the party wall package, and Erith Marshes case officers apply the DA18 conservation-area map. |
| SE2 | Abbey Wood | 1930s semi-detached dominates; Victorian cottages in Bexley Village and Crayford; post-war estates in Thamesmead and Erith | A party wall package in Abbey Wood may land with Greenwich Council or Bexley Council — SE2 crosses the boundary, and the SE2 policies map decides it street by street. |
| DA1 | Crayford / Dartford fringe | Victorian terraces, 1930s semi-detached | DA1 covers Crayford / Dartford fringe only; Bexley Council handles the party wall package, and Crayford / Dartford fringe case officers apply the DA1 conservation-area map. |
Roof pitch, wall build-up and plot depth change every few Bexley streets, and each one changes what a party wall package can achieve at that address.
Conservation areas covering Bexley: Bexley Council runs 16, and Bexley Village, Old Bexley, Crayford are the ones Bexley owners meet most. A party wall package inside a Bexley conservation area loses permitted development, so the Bexley submission is a householder application at £548 decided in 8 weeks — not a £249 prior approval decided in 6 weeks. In Crayford a party wall package is judged on the street elevation first.
Bexley permitted development status: there is no borough-wide direction from Bexley Council, so a party wall package at a DA1 address is normally still permitted development. We certify that with a £274 Lawful Development Certificate rather than leaving a Bexley sale to argue it later.
Bexley housing stock: 1930s semi-detached dominates; Victorian cottages in Bexley Village and Crayford; post-war estates in Thamesmead and Erith. Outer south-east London suburban; very permissive planning environment; strong PD uptake for extensions and loft conversions. Read that before choosing a party wall package route in Bexley — construction, not postcode, sets what is achievable. Bexley Council charges £548 for a householder application and has 8 weeks to determine it.
Sources for this Bexley party wall package page: borough policies maps and conservation-area registers (2025–26), Royal Mail postcode district boundaries, the Town and Country Planning (Fees for Applications) (England) Regulations, the Town and Country Planning (General Permitted Development) (England) Order 2015 as amended, and the Party Wall etc. Act 1996.
Direct answers to the questions Bexley homeowners ask every week about party wall services.
Start a free quote →You need Party Wall Act notices if your Bexley project involves: building on or astride a boundary (Section 1), cutting into a party wall or party structure (Section 3), or excavating within 3m/6m of an adjoining property's foundations (Section 6). Most loft conversions, extensions and basement digs in Bexley trigger at least one section.
If your neighbour consents, that is the whole cost. If they dissent, surveyors must be appointed for the Award and their fees are additional, per neighbour. Notices are included in our Complete architectural packages at no extra charge. See our fees.
If all adjoining owners in Bexley consent: 14 days (Section 3/6 notice) or 1 month (Section 1 notice). If they dissent and surveyors must be appointed, allow 6–8 weeks for the Award. We serve notices as early as possible so the process runs in parallel with your planning application.
No — starting notifiable works in Bexley before serving valid notices or obtaining a Party Wall Award is a breach of the Party Wall Act 1996. It can result in injunctions, damages and loss of your statutory protections. We ensure notices are served at the right time so your build timeline is not delayed.
If an adjoining owner in Bexley does not respond within 14 days, the Act deems them to have dissented. This triggers the surveyor appointment process — you appoint a surveyor, they can appoint their own (at your cost) or you can agree on a single 'agreed surveyor'. We manage this process and keep it moving.

If your property sits on a boundary, here are the neighbouring options.
We cover every architectural technology service in Bexley with one chartered team.
A construction-ready drawing package compliant with every Approved Document — Part A structure, Part B fire, Part L thermal, Part M accessib...
Every loft type across every Bexley roof line — dormer, mansard, hip-to-gable, L-shape, Velux. LDC or full planning route, building regulati...
The whole spectrum — rear extensions, side returns, wraparounds, double-storey, basement digs. Planning-led design with detailed technical p...
Bexley's most space-efficient loft solution when PD-route dormers are blocked. Our chartered team designs mansards that get approved in Bexl...
Turn your unused Bexley garage into a bedroom, home office or open-plan kitchen-diner. Planning route assessment, full building regulations ...
Full architectural technology service for basement digs and cellar conversions in Bexley — structural underpinning design, waterproofing str...
Chartered structural engineer calculations for every residential intervention in Bexley — steel beams, lintels, pad foundations, wall remova...
Measured surveys across Bexley — floor plans, elevations and sections to ±3mm accuracy. Leica Disto laser + BLK360 point-cloud scanning, Aut...
London's most popular loft type — the full-width rear dormer. Planning or Permitted Development route assessed for your Bexley property, bui...
Leave your number and an Architectural technologist will call you back within 30 minutes during working hours.
No obligation. No sales pressure. Just expert advice about party wall services in Bexley.
Free quote in 60 seconds. No hourly billing. MCIAT chartered.
Get my free quote →