MCIAT chartered building control drawing packages for Shoreditch and the wider E1, E2, EC2A area, around 30% below typical London architect rates. Development at a Shoreditch address is Hackney Council business, judged on Hackney Local Plan policy.
A Shoreditch owner needs building regulations drawings because they are the Shoreditch construction drawings a building control body needs before work starts, separate from Hackney Council planning consent. they cover Part A structure on the warehouse conversions, Part L insulation for Shoreditch and Part B fire strategy, and a E1, E2, EC2A full plans submission is decided in 5 weeks, and Hackney Council applies the Hackney Local Plan to the E1, E2, EC2A site.
An Article 4 Direction applies across Hackney, so check it before assuming Shoreditch permitted development survives. Shoreditch reads as Victorian warehouse conversions, creative industries, and that is the context a E1 scheme is judged in. Where a Shoreditch property sits inside Dalston Lane or Hackney Central — two of Hackney's 29 designations — permitted development narrows and a full Hackney Council submission is usually quicker. Every Shoreditch enquiry starts with that check.
Article 4 directions are checked street by street in Shoreditch; the borough-wide answer is rarely the whole answer. Everything on a Shoreditch scheme is measured from the warehouse conversions outward. The borough policy layer over every E1, E2, EC2A address is set out on Hackney planning. The Shoreditch survey then carries into house extension drawings in Shoreditch if the project runs on to construction.



The Shoreditch clock does not start until London Borough of Hackney validates — one to two weeks. We measure the E1 property on site with a laser, then draw the existing set from that data alone.
Statutory periods: 8 weeks from validation for a householder application, 13 weeks for a major scheme, 6 weeks for prior approval with a 21 days neighbour consultation, and 5 weeks for a full plans building control submission. A party structure notice requires one month notice and two months where excavation is involved.
Consultation responses on a Shoreditch scheme are public and readable before the decision. You get the full Shoreditch set as PDFs, plus CAD on request.
On Shoreditch terraces the objection to expect is loss of light to a rear window. We measure the E1 property room by room, including ceiling heights and floor falls.
Shared walls are the norm in Shoreditch; the notice period is not optional. Once consent is granted, architectural drawings follows for the E1 property.
Shoreditch is characterised by warehouse conversions, modern infill, concentrated across E1, E2, EC2A in the Whitechapel / Spitalfields area. How the warehouse conversions in Shoreditch was built decides what can be opened up and where the load has to go. Applied to E1 property: modern construction here usually has an as-built energy model that the new work has to be read against. On Hackney stock it changes the party wall position. Ridge and eaves lines along Shoreditch streets are the reference Hackney Council uses.
Going down in Shoreditch is assessed on ordinary grounds — E1 ground conditions and drainage do more to shape the scheme than policy does. If the E1 job later needs planning permission for E1 properties or loft conversion drawings, the existing drawings already carry the measurements.
The Shoreditch pack below is what Hackney Council and a builder both need.
Surveyors travel to E1 addresses from the studio; the nearest stations are Whitechapel, Shoreditch, Shoreditch High Street, Liverpool Street station. Appointments are booked in Shoreditch on weekdays and Saturdays, and the measured survey of a standard warehouse conversions takes two to three hours.
on Ordnance Survey grid reference TQ325825, inside the Hackney South and Shoreditch parliamentary constituency. Every Shoreditch application opens with a location plan tied to that grid square; get it wrong and Hackney Council returns the submission unvalidated. Source.
Practical detail for a Shoreditch submission: the closest stations to a E1 site are Whitechapel and Shoreditch and Shoreditch High Street and Liverpool Street station; correspondence uses LONDON; dialling code 020; nearby listed fabric is Grade II Historic England. Site plans are drawn to the address as Hackney Council holds it.
Shoreditch work spans E1 (Whitechapel / Spitalfields), shared with Spitalfields, Whitechapel, Mile End, Shadwell; E2 (Bethnal Green), shared with Bethnal Green; EC2A (Shoreditch), which Shoreditch holds on its own — the designations change with the district line.
We survey Shoreditch addresses on Hackney Road, Ermine Street, Commercial Street, Finch Hill, Shoreditch Park, Shoreditch High Street, Kingsland Road and Old Street. most Shoreditch sites are within walking distance of Whitechapel or Shoreditch or Shoreditch High Street. and Grade II Historic England is listed, which pulls neighbouring E1 proposals into a setting assessment.
Besides Shoreditch: Spitalfields (E1), Whitechapel (E1), Bethnal Green (E2), Bow (E3), Mile End (E1, E3), Wapping (E1W), plus Haringey across the border.

The fee follows the building. On Shoreditch stock that means party walls, levels, and the Dalston Lane heritage question.
Statutory application fees are set by regulation, not by the council: £548 householder, £610 for a new dwelling, £274 for a lawful development certificate, £249 for prior approval.
The statutory charge on a Shoreditch application goes to London Borough of Hackney at submission. London planning approval-rate dataset · Hackney planning · the London building regulations drawings pillar page · building regulations drawings in Spitalfields.
Shoreditch work is issued under MCIAT charter, the technical-design and building-regulations qualification. For difficult Shoreditch sites — anything in Dalston Lane, anything overlooking Boxpark — the pre-application route is cheap insurance.
Drawings are produced by chartered members of the Chartered Institute of Architectural Technologists (MCIAT), the professional body for technical design and building-regulations competence. First-time approval across our London caseload is 98%. Statutory fees shown are those in force in England in 2026 under the Town and Country Planning (Fees for Applications) Regulations. Confirm your local authority at gov.uk and submission requirements on the Planning Portal. Studio: 71–75 Shelton Street, London WC2H 9JQ.
One visit to the E1 property is all we need to quote properly. This Shoreditch page was reviewed in August 2026.
Not for every Shoreditch project. Where the house is unlisted and clear of Dalston Lane, permitted development may cover the work. An Article 4 Direction applies across Hackney, so check it before assuming Shoreditch permitted development survives.
Check Dalston Lane first. Hackney designates 29 areas, and Shoreditch sits against that one most often.
Mainly warehouse conversions, modern infill in Shoreditch, all of it laser-measured before design.
Yes — Spitalfields and the rest of Hackney, plus the adjoining borough of Haringey. Shoreditch keeps its own page because the E1 designations and the warehouse conversions do not match what sits a mile away.

building regulation drawings London · Hackney planning · the London building regulations drawings pillar page