Chartered building control drawing packages for the KT3 area. No hourly billing, and around 30% below typical London architect rates. Kingston Council is the decision-maker for New Malden; the KT3 district sets the constraints.
Building Regulations Drawings — the New Malden construction drawings a building control body needs before work starts, separate from Kingston Council planning consent — are what a New Malden owner submits. they cover Part A structure on the edwardian villas, Part L insulation for New Malden and Part B fire strategy, and a KT3 full plans submission is decided in 5 weeks, with the Kingston upon Thames Local Plan as the policy test.
No Article 4 Direction covers Kingston upon Thames, which keeps the New Malden permitted-development route open on unlisted houses. What defines New Malden is that it is Edwardian villas, 1930s semi-detached, and design decisions here answer to that rather than to a pattern book. Surbiton is the designation that most often reshapes a New Malden proposal; Kingston upon Thames carries 22 of them. We establish it for the KT3 address before any drawing begins.
The New Malden Article 4 position is established at survey, before design. A New Malden survey establishes the edwardian villas dimensions that decide the scheme — original rear wall, floor levels, and ridge height against New Malden High Street. The borough policy layer over every KT3 address is set out on Kingston upon Thames planning. The New Malden survey then carries into loft conversion drawings in New Malden if the project runs on to construction.



Most New Malden delay happens before the clock starts: Royal Borough of Kingston upon Thames takes one to two weeks to validate, and an incomplete pack goes to the back of the queue. The New Malden job starts with a laser survey, not a sketch.
Statutory periods: 8 weeks from validation for a householder application, 13 weeks for a major scheme, 6 weeks for prior approval with a 21 days neighbour consultation, and 5 weeks for a full plans building control submission. A party structure notice requires one month notice and two months where excavation is involved.
A New Malden case only reaches committee if it draws significant objection. The set is checked against the Royal Borough of Kingston upon Thames validation list before it goes in.
A KT3 objection about light or overlooking carries more weight than one about taste. Party wall positions on a New Malden terrace are located during the survey.
Because New Malden houses generally share walls, budget time for party wall notices alongside the KT3 application. Once consent is granted, house extension drawings follows for the KT3 property.
New Malden is characterised by edwardian villas, 1930s semi-detached, concentrated across KT3 in the New Malden area. What the edwardian villas in New Malden allows is a construction question first and a planning question second, and the survey answers it. For New Malden owners this matters because edwardian houses here are usually early cavity or solid wall, which decides whether insulation goes in the cavity or on the internal face. On a New Malden terrace it governs the rear opening width. The prevailing New Malden eaves line is the reference Kingston Council uses, which is why the proposed elevation is drawn with the neighbours on it.
Basement work at a New Malden address is judged on amenity, drainage and structure. If the KT3 job later needs architectural drawings for KT3 properties or planning permission, the existing drawings already carry the measurements.
What lands in your inbox after a New Malden survey:
Surveyors travel to KT3 addresses from the studio; the nearest stations are New Malden, London Waterloo, Hampton Court, Kingston. Appointments are booked in New Malden on weekdays and Saturdays, and the measured survey of a standard edwardian villas takes two to three hours.
New Malden lies 9.4 miles (15.1 km) of Charing Cross, on Ordnance Survey grid reference TQ215685. We draw the New Malden location and block plans from that reference, which is what Kingston Council validates against. Source.
Practical detail for a New Malden submission: New Malden and London Waterloo and Hampton Court and Kingston cover the KT3 area; NEW MALDEN is the post town on New Malden addresses; dialling code 020. Site plans are drawn to the address as Kingston Council holds it.
Our New Malden coverage takes in KT3 (New Malden), shared with Coombe.
Typical New Malden work sits on Motspur Park, Worcester Park, Coombe Hill, Richmond Park, Tooting Broadway, Pollards Hill, Kingston Vale and Raynes Park. most New Malden sites are within walking distance of New Malden or London Waterloo or Hampton Court.
Work spreads across Hampton (TW12), Whitton (TW2), Ham (TW10), Mortlake (SW14), Wimbledon (SW19, SW20), Wimbledon Village (SW19) as well as New Malden itself.

The figure is agreed before the survey and does not move. What moves the number on a New Malden job is the edwardian villas itself — party walls, level changes, and whether Surbiton pulls a heritage statement into scope.
Statutory application fees are set by regulation, not by the council: £548 householder, £610 for a new dwelling, £274 for a lawful development certificate, £249 for prior approval.
That fee is collected by Royal Borough of Kingston upon Thames when the KT3 application is lodged. London planning approval-rate dataset · Kingston upon Thames planning · building regulations drawings in London · building regulations drawings in Hampton.
Drawings for New Malden are issued under MCIAT charter, which is the technical design and construction-detailing qualification rather than an RIBA registration. A tight New Malden plot — New Malden High Street in the setting, a shared flank wall on KT3 — goes to Kingston Council for advice before it goes to determination.
Drawings are produced by chartered members of the Chartered Institute of Architectural Technologists (MCIAT), the professional body for technical design and building-regulations competence. First-time approval across our London caseload is 98%. Statutory fees shown are those in force in England in 2026 under the Town and Country Planning (Fees for Applications) Regulations. Confirm your local authority at gov.uk and submission requirements on the Planning Portal. Studio: 71–75 Shelton Street, London WC2H 9JQ.
Book the New Malden survey and the drawings follow within the agreed programme. This New Malden page was reviewed in August 2026.
It depends on the New Malden address. Houses beat flats, unlisted beats listed, and outside Surbiton the permitted-development route usually survives. No Article 4 Direction covers Kingston upon Thames, which keeps the New Malden permitted-development route open on unlisted houses. We check yours free before quoting.
The relevant designation for most New Malden addresses is Surbiton, among 22 in Kingston upon Thames. It changes what can be done at the front far more than at the rear of a KT3 plot.
Predominantly edwardian villas, 1930s semi-detached across KT3. On New Malden projects the edwardian villas governs what is structurally possible, and the measured survey establishes it on site.
Yes, throughout Kingston upon Thames. New Malden and Hampton are handled by the same team.

building regulation drawings London · Kingston upon Thames planning · building regulations drawings in London
New Malden projects: free survey, fixed price, MCIAT chartered throughout.
Get my quote