Planning Drawings · Marylebone · Westminster

Planning Drawings in Marylebone

Fixed fee from £840. MCIAT chartered. Westminster planning experienced. 3 postcodes covered: W1U, W1G, W1H.

Planning Drawings in Marylebone — quick facts

Fixed fee from
£840
Planning authority
Westminster City Council
Article 4 in force
Yes
Typical stock
Georgian terraces, Edwardian mansion blocks
Process duration
12–14 weeks
First-time approval
98%
Why Marylebone

Marylebone's housing pattern shapes the design

Marylebone is Georgian and Victorian terraces, mansion blocks. The dominant stock — georgian terraces, edwardian mansion blocks — has specific constraints and opportunities for planning permission drawings. Side returns sit better on bay-fronted Victorian terraces than on detached 1930s semis. Mansards work where the existing roofscape supports them. We design to the block, not the brochure.

Local context summary — Architectural Drawings London, MCIAT chartered

Process timeline for Marylebone

  1. Week 1. Free site survey at your Marylebone property. Measured drawings produced.
  2. Weeks 2–3. Design iterations with you. Fixed quote confirmed.
  3. Weeks 4–5. Application drawings + Design & Access Statement + Heritage Statement (if needed).
  4. Weeks 5–6. Westminster City Council validation.
  5. Weeks 6–14. Statutory 8-week determination. We respond to officer comments.
Marylebone FAQ for planning permission drawings
Do I need planning permission for planning permission drawings in Marylebone?

Most planning permission drawings projects in Marylebone fall under Permitted Development if the property is a house (not a flat), not listed, and not in a conservation area. Westminster has an Article 4 Direction — Multiple Article 4 Directions — office-to-residential restrictions, HMO conversions, retail to residential in shopping zones. We confirm eligibility free at the site survey.

How much does planning permission drawings cost in Marylebone?

Drawings: fixed fee from £840 (Planning Drawings). Construction cost is separate and depends on size, finish and structural complexity. For georgian terraces, edwardian mansion blocks (typical of Marylebone), expect £45,000–£85,000 build cost for a standard rear extension or loft, more for mansards or basements.

How long does the planning permission drawings process take in Marylebone?

12–14 weeks from first call to Westminster City Council planning decision. Site survey week 1, design weeks 2–3, validation 1–2 weeks, statutory 8-week determination.

What property types are common in Marylebone?

Marylebone is characterised by georgian terraces, edwardian mansion blocks. We've delivered planning permission drawings for every period represented here — the design choices vary significantly by stock.

Will my application succeed in Marylebone?

Our first-time approval rate in Westminster is 98%. Pre-application advice from Westminster City Council is built into our process when the case is borderline (conservation area, Article 4, listed).

Other services in Marylebone

All services in Marylebone →

Planning permission drawings in Marylebone — start free

Same-day fixed quote. MCIAT chartered.

Get quote