Planning Drawings · Holland Park · Kensington and Chelsea

Planning Drawings in Holland Park

Fixed fee from £840. MCIAT chartered. Kensington and Chelsea planning experienced. 2 postcodes covered: W11, W14.

Planning Drawings in Holland Park — quick facts

Fixed fee from
£840
Planning authority
RBKC Planning
Article 4 in force
Yes
Typical stock
Victorian and Edwardian villas
Process duration
12–14 weeks
First-time approval
98%
Why Holland Park

Holland Park's housing pattern shapes the design

Holland Park is Victorian villas around the park. The dominant stock — victorian and edwardian villas — has specific constraints and opportunities for planning permission drawings. Side returns sit better on bay-fronted Victorian terraces than on detached 1930s semis. Mansards work where the existing roofscape supports them. We design to the block, not the brochure.

Local context summary — Architectural Drawings London, MCIAT chartered

Process timeline for Holland Park

  1. Week 1. Free site survey at your Holland Park property. Measured drawings produced.
  2. Weeks 2–3. Design iterations with you. Fixed quote confirmed.
  3. Weeks 4–5. Application drawings + Design & Access Statement + Heritage Statement (if needed).
  4. Weeks 5–6. RBKC Planning validation.
  5. Weeks 6–14. Statutory 8-week determination. We respond to officer comments.
Holland Park FAQ for planning permission drawings
Do I need planning permission for planning permission drawings in Holland Park?

Most planning permission drawings projects in Holland Park fall under Permitted Development if the property is a house (not a flat), not listed, and not in a conservation area. Kensington and Chelsea has an Article 4 Direction — Article 4 Directions covering HMOs, office-to-residential, and basement developments — RBKC has some of the strictest basement policies in London. We confirm eligibility free at the site survey.

How much does planning permission drawings cost in Holland Park?

Drawings: fixed fee from £840 (Planning Drawings). Construction cost is separate and depends on size, finish and structural complexity. For victorian and edwardian villas (typical of Holland Park), expect £45,000–£85,000 build cost for a standard rear extension or loft, more for mansards or basements.

How long does the planning permission drawings process take in Holland Park?

12–14 weeks from first call to RBKC Planning planning decision. Site survey week 1, design weeks 2–3, validation 1–2 weeks, statutory 8-week determination.

What property types are common in Holland Park?

Holland Park is characterised by victorian and edwardian villas. We've delivered planning permission drawings for every period represented here — the design choices vary significantly by stock.

Will my application succeed in Holland Park?

Our first-time approval rate in Kensington and Chelsea is 98%. Pre-application advice from RBKC Planning is built into our process when the case is borderline (conservation area, Article 4, listed).

Other services in Holland Park

All services in Holland Park →

Planning permission drawings in Holland Park — start free

Same-day fixed quote. MCIAT chartered.

Get quote