Limehouse and the surrounding E14 streets, near enough 30% below the London architect norm. Limehouse sits inside Tower Hamlets, so every application here is determined by Tower Hamlets Council against the Tower Hamlets Local Plan.
In Limehouse, house extension drawings are survey-based Limehouse drawings for a rear, side or wrap-around extension in E14. they fix the Limehouse depth against permitted-development limits, answer the 45-degree amenity test Tower Hamlets Council applies, and locate the party wall on the georgian and victorian terraces. The policy applied across E14 is the Tower Hamlets Local Plan, administered by Tower Hamlets Council.
An Article 4 Direction applies across Tower Hamlets, so check it before assuming Limehouse permitted development survives. The fabric of Limehouse is Georgian and Victorian terraces, dockside, so a E14 proposal is judged on fit before it is judged on size. Where a Limehouse property sits inside Spitalfields or Whitechapel Market — two of Tower Hamlets's 58 designations — permitted development narrows and a full Tower Hamlets Council submission is usually quicker. That boundary is verified for the E14 property at the outset.
Every E14 job starts with checking Article 4 directions street by street. What the Limehouse building allows is established first; what Tower Hamlets Council allows, second. The borough policy layer over every E14 address is set out on Tower Hamlets planning. The Limehouse survey then carries into loft conversion drawings in Limehouse if the project runs on to construction.



Validation alone costs London Borough of Tower Hamlets one to two weeks even when the Limehouse pack is complete, and that queue — not the determination — is where most E14 delay starts. Everything begins by measuring the Limehouse property properly — openings, levels, structure — before a proposal exists.
Statutory periods: 8 weeks from validation for a householder application, 13 weeks for a major scheme, 6 weeks for prior approval with a 21 days neighbour consultation, and 5 weeks for a full plans building control submission. A party structure notice requires one month notice and two months where excavation is involved.
Amendments during the Limehouse determination are handled without a resubmission where possible. Nothing leaves for a Limehouse address until it matches the local validation checklist.
A E14 objection about light or overlooking carries more weight than one about taste. A Limehouse measured survey captures the roof structure as well as the plan.
Shared walls are the norm in Limehouse; the notice period is not optional. Once consent is granted, architectural drawings follows for the E14 property.
Limehouse is characterised by georgian and victorian terraces, warehouse conversions, concentrated across E14 in the Canary Wharf / Poplar / Limehouse area. The georgian and victorian terraces that dominates Limehouse behaves differently from the borough average, and the drawings follow the building rather than a house type. Where Limehouse is concerned, georgian rear elevations here are usually the listed or locally listed face of the building, so a glazed link and a lightweight rear addition tend to fare better than a full-width box. That is drawn out in the Limehouse proposed section. Tower Hamlets Council reads a Limehouse elevation against its neighbours first.
Tower Hamlets sets no special basement rule, so a Limehouse lower-ground scheme stands or falls on the engineering and the neighbours. One visit to the Limehouse address covers planning permission for E14 properties and building regulations drawings too.
The Limehouse pack below is what Tower Hamlets Council and a builder both need.
Surveyors travel to E14 addresses from the studio; the nearest stations are Limehouse station. Appointments are booked in Limehouse on weekdays and Saturdays, and the measured survey of a standard georgian and victorian terraces takes two to three hours.
Limehouse lies 3.9 miles (6.3 km) east of Charing Cross, on Ordnance Survey grid reference TQ365815, with the River Thames shaping drainage and flood-risk questions on lower-lying E14 plots. That is the reference the Limehouse site plan is drawn over. Source.
Practical detail for a Limehouse submission: the closest stations to a E14 site are Limehouse station; correspondence uses LONDON; dialling code 020; nearby listed fabric is Grade II harbourmaster. Site plans are drawn to the address as Tower Hamlets Council holds it.
Limehouse work spans E14 (Canary Wharf / Poplar / Limehouse), shared with Canary Wharf, Poplar, with the E14 boundary setting which designations bite.
Limehouse addresses we have drawn run to Commercial Road, Docklands Northern Relief Road and Narrow Street. most Limehouse sites are within walking distance of Limehouse station. and Grade II harbourmaster is listed, which pulls neighbouring E14 proposals into a setting assessment.
Besides Limehouse: Barbican (EC2Y), Smithfield (EC1A), Fleet Street (EC4), St Paul's (EC4M), Bermondsey (SE1, SE16), Borough (SE1), plus City of London across the border.

The fee follows the building. On Limehouse stock that means party walls, levels, and the Spitalfields heritage question.
Statutory application fees are set by regulation, not by the council: £548 householder, £610 for a new dwelling, £274 for a lawful development certificate, £249 for prior approval.
That fee is collected by London Borough of Tower Hamlets when the E14 application is lodged. London planning approval-rate dataset · Tower Hamlets planning · House Extension Drawings London-wide · house extension drawings in Barbican.
MCIAT chartered technologists handle every E14 submission we make. For difficult Limehouse sites — anything in Spitalfields, anything overlooking Limehouse Basin — the pre-application route is cheap insurance.
Drawings are produced by chartered members of the Chartered Institute of Architectural Technologists (MCIAT), the professional body for technical design and building-regulations competence. First-time approval across our London caseload is 98%. Statutory fees shown are those in force in England in 2026 under the Town and Country Planning (Fees for Applications) Regulations. Confirm your local authority at gov.uk and submission requirements on the Planning Portal. Studio: 71–75 Shelton Street, London WC2H 9JQ.
One visit to the E14 property is all we need to quote properly. This Limehouse page was reviewed in August 2026.
Many E14 projects do not. If the Limehouse property is an unlisted house clear of Spitalfields, permitted development may cover it. An Article 4 Direction applies across Tower Hamlets, so check it before assuming Limehouse permitted development survives. Where a future sale is in view we still file a £274 certificate as evidence.
Of the 58 conservation areas in Tower Hamlets, Spitalfields is the one that reaches Limehouse stock most often. Inside it, expect reduced permitted development and a closer read of the Limehouse Basin streetscape.
Mostly georgian and victorian terraces, warehouse conversions, concentrated in E14 (Canary Wharf / Poplar / Limehouse). We measure each Limehouse property with a laser rather than working from a sale particular, because the georgian and victorian terraces rarely matches its original drawings.
Yes — Barbican and the rest of Tower Hamlets, plus the adjoining borough of City of London. Limehouse keeps its own page because the E14 designations and the georgian and victorian terraces do not match what sits a mile away.

house extensions · Tower Hamlets planning · House Extension Drawings London-wide