A E3 scheme is measured against Tower Hamlets Local Plan policy by Tower Hamlets Council officers.
Architectural Drawings — scaled Bow floor plans, elevations and sections describing a E3 property as existing and as proposed — are what a Bow owner submits. they start with a laser measured survey of the Bow address and carry every E3 submission to Tower Hamlets Council, householder application through to full plans, with the Tower Hamlets Local Plan as the policy test.
An Article 4 Direction applies across Tower Hamlets, so check it before assuming Bow permitted development survives. In Bow the streetscape argument usually decides the case before the numbers do, because the area is Victorian terraces, Georgian fragments. Bow sits close enough to Tredegar Square that designation should be checked at the outset, not after design. Whether a Bow plot sits inside the boundary changes the whole route.
Every E3 job starts with checking Article 4 directions street by street. A Bow survey establishes the victorian terraces dimensions that decide the scheme — original rear wall, floor levels, and ridge height against Bow Bells. The borough policy layer over every E3 address is set out on Tower Hamlets planning. The Bow survey then carries into house extension drawings in Bow if the project runs on to construction.



Most Bow delay happens before the clock starts: London Borough of Tower Hamlets takes one to two weeks to validate, and an incomplete pack goes to the back of the queue. No Bow design work starts until the measured survey is complete.
Statutory periods: 8 weeks from validation for a householder application, 13 weeks for a major scheme, 6 weeks for prior approval with a 21 days neighbour consultation, and 5 weeks for a full plans building control submission. A party structure notice requires one month notice and two months where excavation is involved.
Neighbour consultation on a Bow case runs 21 days from registration. The set is checked against the London Borough of Tower Hamlets validation list before it goes in.
A E3 objection about light or overlooking carries more weight than one about taste. Roof pitch and eaves height on a Bow house are measured, not scaled off.
Party wall procedure runs alongside the Bow application, not after it. Once consent is granted, planning permission follows for the E3 property.
Bow is characterised by victorian terraces, georgian fragments, concentrated across E3 in the Bow area. Bow is not uniform, but the victorian terraces recurs often enough across E3 that the structural pattern is predictable once measured. Where Bow is concerned, georgian houses here are rarely square, so the survey is set out from a laser control network rather than assumed right angles. In E3 that determines the depth we can draw. Massing on a Bow scheme is argued against the Bow Bells street rhythm.
A Bow basement stands on its drainage and party wall evidence. If the E3 job later needs building regulations drawings for E3 properties or loft conversion drawings, the existing drawings already carry the measurements.
Each Bow instruction produces this set of drawings.
Surveyors travel to E3 addresses from the studio; the nearest stations are Old Ford, Bow, File:Bow Road (LT), Bow Road. Appointments are booked in Bow on weekdays and Saturdays, and the measured survey of a standard victorian terraces takes two to three hours.
Bow lies 4.6 miles (7.4 km) east of Charing Cross, on Ordnance Survey grid reference TQ365825, inside the Stratford and Bow parliamentary constituency. A E3 submission is checked against exactly that location before Tower Hamlets Council will register it. Source.
Practical detail for a Bow submission: Bow is served by Old Ford and Bow and File:Bow Road (LT) and Bow Road; addresses are written to LONDON; dialling code 020; heritage assets close by include Grade II* Historic England. Site plans are drawn to the address as Tower Hamlets Council holds it.
E3 (Bow), shared with Mile End — all within our Bow survey radius.
Recent Bow jobs sit on St Barnabas Bethnal Green, Great British High Street, Queen Elizabeth Olympic Park, Bethnal Green, Bow Road and Mile End Park. most Bow sites are within walking distance of Old Ford or Bow or File:Bow Road (LT). and Grade II* Historic England is listed, which pulls neighbouring E3 proposals into a setting assessment.
The surrounding patch — Peckham (SE15), Dulwich Village (SE21), East Dulwich (SE22), Rotherhithe (SE16), Elephant and Castle (SE1, SE17), Nunhead (SE15) — is drawn by the same team, though each street answers to its own designation.

A Bow quote moves on what the building is, not on how long we spend: the victorian terraces, the party wall position, the Tredegar Square question.
Statutory application fees are set by regulation, not by the council: £548 householder, £610 for a new dwelling, £274 for a lawful development certificate, £249 for prior approval.
That charge is London Borough of Tower Hamlets's, taken when the Bow application is lodged. London planning approval-rate dataset · Tower Hamlets planning · our London architectural drawings service · architectural drawings in Peckham.
Chartered accountability applies to every E3 drawing we issue. If your Bow site is tight — Roman Road Market in the setting, a Tredegar Square designation, a shared flank wall — we test it with Tower Hamlets Council first rather than submit and hope.
Drawings are produced by chartered members of the Chartered Institute of Architectural Technologists (MCIAT), the professional body for technical design and building-regulations competence. First-time approval across our London caseload is 98%. Statutory fees shown are those in force in England in 2026 under the Town and Country Planning (Fees for Applications) Regulations. Confirm your local authority at gov.uk and submission requirements on the Planning Portal. Studio: 71–75 Shelton Street, London WC2H 9JQ.
Give us the E3 postcode and we will tell you which route applies. This Bow page was reviewed in August 2026.
Sometimes. The test for a Bow property is house versus flat, listed versus not, and inside Tredegar Square versus outside. An Article 4 Direction applies across Tower Hamlets, so check it before assuming Bow permitted development survives. We establish which applies at the E3 survey rather than guessing from the street.
Tredegar Square is the designation to check first — one of 58 in Tower Hamlets. Within its boundary a Bow proposal is judged against the area appraisal, and materials and window detail start to matter as much as size.
The Bow stock is victorian terraces, georgian fragments. Whatever the planning route, the victorian terraces decides the structural work, which is why the E3 survey comes before the design.
We survey anywhere in Tower Hamlets and City of London, Bow and Peckham included.